Category:PRESERVICE & INSERVICE INSPECTION & TEST REPTS
MONTHYEARML20210J3851999-07-28028 July 1999 PNPP - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval ML20198P0951997-12-22022 December 1997 ISI Summary Rept,Results for Outage 6 (1997) Third Period, First Interval for Pnpp ML20115D6961996-06-20020 June 1996 ISI Summary Rept for Pnpp ML20078B7981994-10-0505 October 1994 ISI Summary Rept NP0059-0004 ML20070S1521991-03-26026 March 1991 Inservice Insp Summary Rept NP0059-0002,Results for Outage 2(1990),First Period,First Interval PY-CEI-NRR-1264, Summary Technical Rept,Evaluation of Indications in Perry Feedwater to Safe-End Welds1990-11-21021 November 1990 Summary Technical Rept,Evaluation of Indications in Perry Feedwater to Safe-End Welds ML20058D8261990-10-0202 October 1990 Temporary Change 1 to, Inservice Exam Program 1999-07-28
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEAR05000440/LER-1999-004, :on 990916,loss of Safety Function Resulted in TS 3.0.3 Entry.Caused by Design Deficiency in Control Complex Architectural Walls.Revised Storm Contingencies Instructions.With1999-10-18018 October 1999
- on 990916,loss of Safety Function Resulted in TS 3.0.3 Entry.Caused by Design Deficiency in Control Complex Architectural Walls.Revised Storm Contingencies Instructions.With
ML20217K1231999-10-14014 October 1999 Revised Positions for DBNPS & PNPP QA Program ML20212J2011999-09-30030 September 1999 Safety Evaluation Supporting Transfer of Dl Ownership Interest in PNPP to Ceico PY-CEI-NRR-2437, Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With 05000440/LER-1999-003-01, :on 990218,post-accident Dose Limits Were Exceeded.Caused by Relief Valve Leakage Outside of Containment.Removed Relief Valve on 990913,by Design Change Package Implemented Under 10CFR50.59.With1999-09-27027 September 1999
- on 990218,post-accident Dose Limits Were Exceeded.Caused by Relief Valve Leakage Outside of Containment.Removed Relief Valve on 990913,by Design Change Package Implemented Under 10CFR50.59.With
PY-CEI-NRR-2429, Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With ML20212A6881999-08-31031 August 1999 Safety Evaluation Supporting Amend 106 to License NPF-58 PY-CEI-NRR-2424, Monthly Operating Rept for July 1999 for Perry Npp.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Perry Npp.With ML20210J3851999-07-28028 July 1999 PNPP - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval PY-CEI-NRR-2416, Monthly Operating Rept for June 1999 for Perry Nuclear Power Plant,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Perry Nuclear Power Plant,Unit 1.With ML20196A1951999-06-17017 June 1999 Instrument Drift Analysis ML20207G2741999-06-0707 June 1999 Safety Evaluation Concluding That Firstenergy Flaw Evaluation Meets Rules of ASME Code & That IGSCC & Thermal Fatigue Crack Growth Need Not Be Considered in Application PY-CEI-NRR-2409, Monthly Operating Rept for May 1999 for Perry Nuclear Power Plant,Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Perry Nuclear Power Plant,Unit 1.With PY-CEI-NRR-2393, Special Rept Update:On 990327 Refueling Outage 7 Began & Troubleshooting Efforts Began.Troubleshooting of Affected Calbe Confirmed Fault in Drywell Section of Cable.Determined That Installation of Newer Technology Should Be Explored1999-05-12012 May 1999 Special Rept Update:On 990327 Refueling Outage 7 Began & Troubleshooting Efforts Began.Troubleshooting of Affected Calbe Confirmed Fault in Drywell Section of Cable.Determined That Installation of Newer Technology Should Be Explored ML20206G6451999-05-0303 May 1999 Safety Evaluation Authorizing Requests for Relief IR-032 to IR-035 & IR-037 to IR-040 Re Implementation of Subsections IWE & Iwl of ASME Section XI for Containment Insp PY-CEI-NRR-2399, Monthly Operating Rept for Apr 1999 for Perry Nuclear Power Plant,Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Perry Nuclear Power Plant,Unit 1.With ML20206E2261999-04-29029 April 1999 Safety Evaluation Concluding That Proposed Alternatives Will Result in Acceptable Level of Quality & Safety.Authorizes Use of Code Case N-504 for Weld Overlay Repair of FW Nozzle Weld at PNPP & Use of Table IWB-3514 05000440/LER-1999-002-01, :on 990327,RHR a Pump Failed to Start & LCO 3.0.3 Was Entered Due to TS Bases Misinterpretation.Caused by Failed Optical Isolator That Provided Signal to Pump Start Permissive Circuitry.Subject Circuitry Was Replaced1999-04-26026 April 1999
- on 990327,RHR a Pump Failed to Start & LCO 3.0.3 Was Entered Due to TS Bases Misinterpretation.Caused by Failed Optical Isolator That Provided Signal to Pump Start Permissive Circuitry.Subject Circuitry Was Replaced
ML20206D7911999-04-23023 April 1999 Rev 6 to PDB-F0001, COLR for Pnpp Unit 1 Cycle 8,Reload 7 05000440/LER-1999-001-01, :on 990317,discovered That Control Complex Bldg Architectural Walls Were Not Included in Tornado Dp Loading Design.Caused by Failure to Consider Tornado Dp Loads. Compensatory Measures Were Implemented.With1999-04-16016 April 1999
- on 990317,discovered That Control Complex Bldg Architectural Walls Were Not Included in Tornado Dp Loading Design.Caused by Failure to Consider Tornado Dp Loads. Compensatory Measures Were Implemented.With
ML20205P4371999-04-15015 April 1999 Safety Evaluation Concluding That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking or Thermal Binding ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected PY-CEI-NRR-2389, Monthly Operating Rept for Mar 1999 for Perry Nuclear Power Plant,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Perry Nuclear Power Plant,Unit 1.With ML20205G4221999-03-31031 March 1999 Safety Evaluation Accepting Second 10-yr Interval IST Program Releif Requests for Plant,Unit 1 ML20206D8461999-03-31031 March 1999 Rev 1 to J11-03371SRLR, Supplemental Reload Licensing Rept for Pnpp,Unit 1 Reload 7 Cycle 8 ML20205S0601999-03-31031 March 1999 Rept on Status of Public Petitions Under 10CFR2.206 with Status Change from Previous Update,990331 ML20205E0591999-03-26026 March 1999 Safety Evaluation Supporting Amend 105 to License NPF-58 ML20205D3101999-03-26026 March 1999 Safety Evaluation Supporting Amend 103 to License NPF-58 ML20205D6921999-03-26026 March 1999 Safety Evaluation Supporting Amend 104 to License NPF-58 ML20205C3761999-03-26026 March 1999 Safety Evaluation Supporting Request for Proposed Exemption to 10CFR50,app a GDC 19 ML20204C0711999-03-11011 March 1999 Safety Evaluation Supporting Amend 102 to License NPF-58 ML20207F4361999-03-0303 March 1999 Safety Evaluation Supporting Amend 101 to License NPF-58 PY-CEI-NRR-2369, Special Rept:On 990127,PAMI Was Declared Inoperable.Caused by Low Resistance Reading Existing in Circuit That Goes to Drywell.Troubleshooting of Affected Cable Will Commence During RFO on 9902271999-03-0303 March 1999 Special Rept:On 990127,PAMI Was Declared Inoperable.Caused by Low Resistance Reading Existing in Circuit That Goes to Drywell.Troubleshooting of Affected Cable Will Commence During RFO on 990227 PY-CEI-NRR-2372, Monthly Operating Rept for Feb 1999 for Perry Nuclear Power Plant,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Perry Nuclear Power Plant,Unit 1.With ML20207L4881999-02-24024 February 1999 Safety Evaluation Supporting Amend 100 to License NPF-58 ML20203F8381999-02-0808 February 1999 Safety Evaluation Supporting Amend 97 to License NPF-58 ML20203A5961999-02-0202 February 1999 Safety Evaluation Accepting Licensee Proposed Revs to Responsibilities of Plant Operations Review Committee as Described in Chapter 17.2 of USAR ML20203A5211999-01-27027 January 1999 Safety Evaluation Accepting Licensee Calculations Showing That Adequate NPSH Will Be Available for HPCS Pumps ML20198R8921999-01-0707 January 1999 SER Accepting Licensee Proposed Amend to TSs to Delete Reference to NRC Policy Re Plant Staff Working Hours & Require Administrative Controls to Limit Working Hours to Be Acceptable ML20206B0101998-12-31031 December 1998 1998 Annual Rept for Firstenergy Corp, for Perry Nuclear Power Plant & Davis-Besse Nuclear Power Station.Form 10-K Annual Rept to Us Securities & Exchange Commission for Fiscal Yr Ending 981231,encl ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 PY-CEI-NRR-2356, Monthly Operating Rept for Dec 1998 for Perry Nuclear Power Plant,Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Perry Nuclear Power Plant,Unit 1.With ML20198J0031998-12-22022 December 1998 SER Accepting Licensee Response to GL 92-08,ampacity Derating Issues for Perry Nuclear Power Plant,Unit 1 ML20198K9071998-12-21021 December 1998 Safety Evaluation Supporting Amend 96 to License NPF-58 ML20196J4731998-12-0202 December 1998 Safety Evaluation Supporting Amend 95 to License NPF-58 PY-CEI-NRR-2346, Monthly Operating Rept for Nov 1998 for Perry Nuclear Power Plant,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Perry Nuclear Power Plant,Unit 1.With ML20196D2751998-11-23023 November 1998 Safety Evaluation Supporting Amend 94 to License NPF-58 ML20195F6891998-11-0505 November 1998 Safety Evaluation Accepting Proposed Reduction in Commitment in Quality Assurance Program to Remove Radiological Assessor Position 05000440/LER-1998-003, :on 981001,missed TS SR on H Igniters Was Noted.Caused by Personnel Error.Missed Surveillance Was Performed on Day of Discovery of Item & Function of H Igniters Were Verified.With1998-11-0202 November 1998
- on 981001,missed TS SR on H Igniters Was Noted.Caused by Personnel Error.Missed Surveillance Was Performed on Day of Discovery of Item & Function of H Igniters Were Verified.With
PY-CEI-NRR-2335, Monthly Operating Rept for Oct 1998 for Perry Nuclear Power Plant,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Perry Nuclear Power Plant,Unit 1.With 1999-09-30
[Table view] |