ML20081G321

From kanterella
Revision as of 18:05, 20 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures GO-EIP-115 Re Deescalation of Emergency classification,GO-EIP-135 Re Emergency Plan Review & Rev & GO-EIP-137 Re Siren Sys Testing
ML20081G321
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 10/24/1983
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
Shared Package
ML20081G319 List:
References
NUDOCS 8311040197
Download: ML20081G321 (1)


Text

.- .

. Metling Address ,

, ,Atacama Power Comoany .

600 North 18tti Street Post Office Box 2641 . -

- Birmingham. Alabama 35291 Telennone 205 783-6081 F. L Clayton, Jr, Senior Vice President Flintndge Building AlabamaPower tN soutw ee:tnc system October 24, 1983 Docket No. 50-348 Docket No. 50-364 I

Document Control Desk
U. S. Nuclear Regulatory Comission Washington, D.C. 20555

Dear Sir:

Enclosed in accordance with 10CFR50, Appendix E requirements are two copies each of Emergency Implementing Procedures G0-EIP-115, Rev. 1, G0-EIP-135, Rev. 1 and GO-EIP-137, Rev. 1. Also enclosed are three Document Transmittal Acknowledgement Forms which we request that you sign

and return so that we may verify your receipt of these documents in accordance with our document control procedures. If you have any questions, please advise.

Yours very truly, SF. L.hClayton,5 0!10 Jr. K r FLCJr/KWM:sm

Enclosures:

G0-EIP-115 (2) l G0-EIP-135 (2) l G0-EIP-137 (2) l ReceiptAcknowledgement(3) xc: Mr. K. W. McCracken

~

'Mr. C. H. Mudd, Jr.

File A-27.9.1 f.

~

8311'040197 831102 ."

PDR ADOCK 05000348 F PDR- llll

REGULATaRf NPORMATION DISTHIdVIIGN SYSTEM (RIDS)

DUC.DATE: 83/10/24 NOTARIZED: NO DOCKET c ACCESST # eor *a' .

1, AlaDama Power v5900348 FACIL:50-348 Joseon M. Farley Nuclear Plant, Unit 05000364 50-3o4 Joseon M. Forley Nuclear Plant, unit 2, Alaoama Power AUTH.NAME AUTHUR AFFILIATION CLAYTON,F.L. Alaoama Power Co.

PECIP.NA"E RECIPIENT AFFILIATION NRC - No detaileo Affiliation Given

SUBJECT:

Forwards Certral Files version of revised Emergency P1'an Implementing Procedures GO*EIP-115 re deescalation of emergency classification GO-EIP-135 ee emergency plan revien

& rev i GO-EIP-137 re siren sys testing.

DISTRIBUTION CODE: X0023 COPIES RECEIVED:LTk _ ENCLf__ SIZE:___ j }

IITLE: Emerg :lan (CF Avail)

NOTES:

HECIPIENT COPIES RECIPIENT COPIES Iv C00E/NAME LTTR ENCL ID CODE /NAME LTTA ENCL NPR ORd1 BC 1 0 REEVES,E. 01 1 1 Od 1 FEMA TECH HAZu9 1 1 INTERNAL:{ADM/UPk)

TE/DEPER/EPB 03 1

d 2 IE/0EPER/IRd 1 1 NRR/DSI/RAB 1 0 NRR/DSI/AEB 1 1 REG FILES 07 1 1 I

f I

TOTAL NUMBED 0F COPIES 4E2VIRED: LTTP 10 ENCL 6 l

. y.

l

  • l ALABAMA POWER COMPANY NUCLEAR GENERATION DEPARTMENT GENERAL OFFICE NUCLEAR GENERATION PROCEDURES DOCUMENT TRANSMITIAL ACKNOWLEDGEMENT To: Alabama Power Company 600 North 18th Street P. O. Box 2641 Birmingham, Alabama 35791 Attention: Nuclear Generation Department Document Control B-300 Flintridge Building Icknowledge the receipt of procedure / revision O- - //T .

The superceded procedure was destroyed.

12 e s. I Comments:

I Copy Number: O t-i -

5I Assigned to: tb>-d as]~/ L

'/

Date Signature ,

'^'

j+Mg'((r.iin A'e

.. .. . ..-. = - . -

-.. - _ . - .. . . -