ML20083G806

From kanterella
Revision as of 00:55, 19 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Repts for Nov 1983
ML20083G806
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 11/30/1983
From: Dugstad D, Musolf D
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8401120240
Download: ML20083G806 (9)


Text

, __ _ ._ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _

sg l NGBRGIIVE_SUddeBY_DE_DEEBoIING_EXEEBIEUCE DGCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE DECEMBER 3, 1903 COMPLETED DY DALE PUGSTAD TELEPHONE 612-388-1121 MONTH: NOVEMBER 1983 THE UNIT WAS BASE LOADED THIS MONTH; NO SHUTDOWNS.

8401120240 83133o DR ADDCK 05000gg2 PDR

r D61LY_UNII_EDWER_QUIEUI DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.i DATE DECEMBER 3, 1983 COMPLETED BY DALE DUGSTAD

, TELEPHONE 612-388-1121 MONTH NOVEMBER 1983 l

j DoY eVEBaGE_LO6D__dWE:NEI

! 1 525 2 524 3 526 4 524

. 5 526 6 522 7 524 8 525 9 525

'io 524 11 525 i2 524 13 523 14 524 15 524 16 523 17 523 18 526 19 438 20 525 21 525 22 520 23 516 24 536 25 523 26 526 27 527 28 526 29 523 30 523 AVERAGE LOADS ABOVE 503 MWE-NET ARE DUE TO COOLER CONDENSER CIRCULATING UATER I

i 0EEBoIING_DGIe_BEEQ8I .

l-DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.i DATE DECEMBER 3, 1983 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121 QEE8eIING_SIeIUS

1. UNIT NAME; PRAIRIE ISLAND NO. 1 ______________________
2. REPORTING PERIOD: NOVEMBER 1983 'l NOTES: I 3.. LICENSED THERMAL POWER (HWT): 1650 l l
4. NAMEPLATE RATING (GROSS MWE): 593 l l
5. DESIGN. ELECTRICAL RATING (NET MWE)* 530 l l
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 534 I i

'7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 503 1____________________1-

8. IF CHANGES 0CCUR IN-CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT GIVE' REASON: N/A

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET'MWE): N/A
10. REASONS FOR RESTRICTIONS, IF ANY: N /:A THIS MONTH- YR-TO-DATE CUMULATIVE

'11. HOURS IN REPORTING PERIOD 720 8016 67288

12. NUMBEP. OF HOURS REACTOR WAS CRITICAL 720.0 7631.8 71o47.4

.i3. REACTOR RESERVE ~ SHUTDOWN HOURS 0.0 0.0 5571.1 14, HOURS GENERATOR ON LINE 720.0- 7600.1 70356.9

^15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0

16. GROSS THERMAL : ENERGY GENERATED- (MWH) 1172808 12329520 110272498 174' GROSS ELECTRICAL ENERGY GENERATED (MWH) 396320 4115540 ~35866960

' i lB . NET: ELECTRICAL ENERGY GENERATED (MWH) 375430 3878623 33581199

19. UNIT SERVICE FACTOR -100.0 94.0 80.6
20. UNIT AVAILABILITY FACTOR 100.0 94.8 80.6 21.= UNIT CAPACITY FACTOR-(USING MDC NET) 103.7 96.2 76.5
22. UNIT CAPACITY FACTOR (USING DER NET) 98.4 91.3 72.6

-23. UNIT FORCED OUTAGF RATE 0.0 0.5 8.6

-24.-SHUTDOWNS SCHEDULED OVER NEXT 12 MONTHS (TYPE, DATE AND DURATION OF EACH). l REFUELING DECEMBER 2, 1983 5 WEEKS

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

.. .- .~

UNIT SHUTDOWNS AND /ER REDUCTIONS DOCKET NO. 50-282 REPORT MONTH November _ 1983 UNIT NAME Prairie Island No. 1

  • DATE December 5,1983 COMPLETED BY Dale Dunstad ]

TELEPHONE 612-388-1121 c u u ec % Licensee o Cause & Corrective Date E. O7 E 38 Event ug .

,,$ @n Action to M N$ $ 3 I$ N -Report # EO E .$ Prevent Recurrence YE

  • " N 0EN *

$0 *

  • $" go 0 E

11-19-83

. S 0.0 B N/A N/A N/A N/A Turbine Tests. Overspeed & Valves i O

d 11-22-83 S 0.0 B N/A N/A N/A N/A NIS Pwr Range Axial Offset Cal.

5

p. ,

l F: Forced Reason Method: Exhibit G-In-S: Scheduled A-Equipment Failure (Explain) 1-Manual structions for B-Maintenance or Test 2-Manual Trip Preparation of C-Refueling 3-Automatic Trip Data Entry Sheets D-Regulatory Restriction 4-Other (Explain) for Licensee Event E-Operator Training & License Examination Report (LER) File F-Administrative (NUREG-0161)

G-Operational Error (Explain) 5 Il-Other (Explain Exhibit 1 - Same Source 4

NeBBoIIVE_Sudd68Y_DE_DEEBoIING_EXEEEIENCE DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO.2 DATE DECEMBER 3, 1983 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121 MONTH NOVEMBER 1983 THE UNIT WAS BASE LOADED THIS MONTH; NO SHUTDOWNS.

l

DeILY_UNII_EDWE8_QUIEUI DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO.2 DATE DECEMBER 3, 1983 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121 MONTH NOVEMBER 1983 DeX eVEBeGE_LO6D__UWE:UEI i 523 g 2 523 3 525 4 525 5 527 6 524 7 524 8 526 9 524 10 528 11 526 12 524 13 523 14 523 15 523 16 523 17 523 18 524 19 521 20 523 21 520 22 521 23 529 24 526 25 524 26 526 27 525 28 526 29 528 30 528 t

AVERAGE LOADS ABOVE 500 MWE-NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER

L DEEEeIING_DaIo_ BEE 0BI f

f DOCKET NO. 50-306

) UNIT PRAIRIE ISLAND NO.2 DATE DECEMBER 3, 1983 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121 QEEBoIING_SIaIUS

1. UNIT NAME: PRAIRIE ISLAND NO. 2 ______________________
2. REPORTING PERIOD: NOVEMBER 1983 l NOTES: 1
3. LICENSED THERMAL POWER (MWT): 1650 l l
4. NAMEPLATE RATING (GROSS MWE); 593 l l
5. DESIGN ELECTRICAL RATING (NET MWE): 530 I i

'6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 53i l l

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE). 500 1____________________1
8. IF CH.ANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT GIVE REASON: N/A

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)- N/A
10. REASONS FOR RESTRICTIONS. IF ANY: N/A THIS MONTH YR-TO-DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 720 8016 78406
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 6899.6 67506.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1516.1
14. HOURS GENERATOR ON LINE 720.0 6834.1 66549 2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS ~ THERMAL ENERGY GENERATED (MWH) 1182251 10698622 104516410
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 397760 3196320 33363410
18. NET ELECTRICAL ENERGY GENERATED (MWH) 377601 3324848 31583511
19. UNIT SERVICE FACTOR 100.0 85.3 84.9
20. UNIT AVAILADILITY FACTOR 100.0 85.3 84.9 4
21. UNIT CAPACITY FACTOR (USING MDC NET) 104.9 83.0 80.6
22. UNIT CAPACITY FACTOR (USING DER NET) 99.0 78.3 76.0
23. UNIT FORCED OUTAGE RATE 0.0 0.1 4.6
24. SHUTDOWNS SCHEDULED OVER NEXT 12 MONTHS (TYPE, DATE AND DURATION OF EACH)

REFUELING OUTAGE IN AUGUST OF 1984.

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP N/A 4

UNIT SHUTDOWNS AND JER REDUCTIONS ',_

DOCKET NO. 50- 306 REPORT MONTH November 1983 UNIT NAME Prairie Island No. 2 DATE December 5.1983 COMPLETED BY Dale Dunstad TELEPHONE 612-388-1121 a c n w [s Licensee a ., o Cause & Corrective Date E. O7 8 30 Event 3 .$ @c Action to i

N N$ $ "E I$ E Report # EO E .S' Prevent Recurrence

  • ~

Y5 N $55 a 0

  • 5"go 0 5

"4 .

8 13 n.

I F: Forced Reason Method: Exhibit G-In-S: Scheduled A-Equipment Failure (Explain) 1-Manual structions for B-Maintenance or Test 2-Manual Trip Preparation of C-Refueling 3-Automatic Trip Data Entry Sheets ,

D-Regulatory Restriction 4-Other (Explain) for Licensee Event ]

E-Operator Training & License Examination Report (LER) File j F-Administrative (NUREG-0161)

C-Operational Error (Explain) 5 Il-Other (Explain Exhibit 1 - Same Source

0 Northem States Power Company 414 Nicollet Mall Minneapohs. Minnesota 55401 Telephone 1612) 330 5500 December 9, 1983 i

Director, Office of Resource Management U S Nuclear Regulatory Commission Uashington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLAtTr Docket No. 50-282 License No. DPR-42 50-306 DPR-60 Monthly Operating Report November, 1983 Attached are twelve copies of the Monthly Operating Report for November,1983 for the Prairie Island Nuclear Generating Plant.

Mw David Musolf Manager of Nuclear Suppor Services D}N/ dab cc: Regional Administrator-III, NRC NRR Project Manager, faC NRC Resident Inspector MPCA Attn: J W Ferman Attachment gs1GI' Cert 8>\'

s