ML20086T440

From kanterella
Revision as of 20:15, 14 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Second Interim Significant Const Deficiency Rept 95 Re HPSI Pumps A/Ab Failing to Start on Safety Injection Actuation Signal.Final Rept Will Be Submitted by 840330
ML20086T440
Person / Time
Site: Waterford Entergy icon.png
Issue date: 02/24/1984
From: Gerrets T
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
95, 95-22, W3K84-0397, W3K84-397, NUDOCS 8403060339
Download: ML20086T440 (2)


Text

_ _ _ .

e I

l OUISIANA 242 OctAnONoe S1nm POWER & L1GHT P O BOX 6008 + NEW ORLEANS. tOUIS1ANA 70174 * (504) 366-2345 M100LE south unuTits sysnM February 24, 1984 W3K84-0397 Q-3-A35.07.95 Mr. John T. Collins Regional Administrator, Region IV /

U. S. Nuclear Regulatory Commission J- ((M M i 611 Ryan Plaza Drive, Suite 1000 l .g Arlington, Texas 76012 LJ

REFERENCE:

LP&L letter W3K84-0028 dated January 5, 1984

Dear Mr. Collins:

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 95.

"HPSI Pumps A/AB Failed to Start on SIAS" Second Interim Report The above referenced letter indicated submittal of an update or Final Report to the USNRC on February 24, 1984 At the present time, all 4.16KV Magna Blast Breakers are being inspected for proper shimming of the spring release interlock support. Corrective action and verification of supporting documentation is scheduled to be completed in mid March 1984.

The Final Report will be submitted to the USNRC on March 30, 1984.

Very truly yours, T. F. Gerrets Corporate Quality Assurance Manager TFC:CNH:VBR cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 8403060339 840224 PDR ADOCK 05000302 S PDR st o 1.VX] I

f E .

, r Mr. John T. Collins February. 24, 1984 W3K84-0397 Page 2 cc: - Lirector Office of Management

-Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.- 20555

.Mr. E. L. Blake Shaw, Pittman, Potts, & Trowbridge 1800 M Street, N.W.

Washington, D.C. 20036 Mr. W. M. Stevenson Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Ceorgia 30339 l

t i

s

~

a 8

- - - - ' + vw, ww,- -ave r, , - +. ~<rna w - -- - p- ~ , ,w, -m,..,3-g wq----r-or.w-y-p -w.r,--m--m,pm---am ,- -

yn-~