April 2003 Monthly Operating Report for Palisades Nuclear Plant
ML031400558
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/12/2003
From: Cooper D
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML031400558 (4)


Text

_j -

N Committed to Nuclear Excellence Palisades Nuclear Plant Operated by Nuclear Management Company, LLC May 12, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 DOCKET 50-255 LICENSE DPR-20 PALISADES NUCLEAR PLANT LICENSEE REPORT OF MONTHLY OPERATING DATA Attached are the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of April 2003.

If you have any questions, please contact Mr. Scott Hawn at (269) 764-3179.

Dougla E. Cooper Palisades Site Vice President CC Regional Administrator, USNRC, Region IlIl NRC Resident Inspector, Palisades LBrandon, Michigan Department of Environmental Quality RJAben, Michigan Department of Labor RDWhale, Michigan Public Service Commission Records Center, INPO SMMcintyre, P-26-204 Attachments 27780 Blue Star Memorial Highway

  • Covert, Ml 49043

':j c Telephone: 616.764.2000

SUMMARY

OF OPERATING EXPERIENCE FOR APRIL, 2003 The plant began the month shutdown for Refueling Outage 16. After refueling work was completed, the reactor was brought critical on April 19, 2003, at 08:06. The plant was synchronized to the power grid on April 20, 2003, at 12:35. Power was escalated and the plant returned to essentially full power (at greater than 99%) on April 25, 2003.

The plant completed the month at essentially full power.

J *tY1 OPERATING DATA REPORT DOCKET NO: 50-255 DATE (Mo-Da-Yr): 05-06-03 COMPLETED BY: HAReyner TELEPHONE (269) 764-2057 OPERATING STATUS: NOTES:

1. UNIT NAME Palisades
2. REPORTING PERIOD (YrMoDa-YrMoDa): 030401-030430
3. LICENSED THERMAL POWER (Mwt) 2530
4. NAMEPLATE RATING (GROSS Mwe) 811.7
5. DESIGN ELECTRICAL RATING (NET Mwe) 805
6. MAXIMUM DEPENDABLE CAPACITY (GROSS Mwe) 770
7. MAXIMUMDEPENDABLECAPACITY(NETMwe) ** 730
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEM NUMBERS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
10. REASONS FOR RESTRICTIONS, IF ANY:

This Month Yr-to-Date Cumulative

11. HOURS IN REPORTING PERIOD 719.0 2879.0 274934.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 279.9 2062.3 171590.5
13. REACTOR RESERVE SHUTDOWN HOURS - - -
14. HOURS GENERATOR ON-LINE 251.4 2033.8 166012.8
15. UNIT RESERVE SHUTDOWN HOURS - - -
16. GROSS THERMAL ENERGY GENERATED (MWH) 512425 4956498 376404965
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 165349 1638873 120076908
18. NET ELECTRICAL ENERGY GENERATED (MWH) 156044 1564082 113627268
19. UNIT SERVICE FACTOR 35.0% 70.6% 60.4%
20. UNIT AVAILABILITY FACTOR 35.0% 70.6% 60.4%
21. UNIT CAPACITY FACTOR (USING MDC NET)^ 29.7% 74.4% 59.5%
22. UNIT CAPACITY FACTOR (USING DER NET) 27.0% 67.5% 51.3%
23. UNIT FORCED OUTAGE RATE 0.0% 0.0% 25.1%

^^ Based on condenser backpressure Weighted Average (635 MWe used as MDC Net prior to October 1985)

C REPORT MONTH April 2003 DOCKET NO. 50-255 UNIT NAME Palisades DATE(Mo/DalYr) 05/06/03 COMPLETED BY HAReyner TELEPHONE 269-764-2057 UNIT SHUTDOWNS No. Date Type Duration Reason' Method of Cause / Corrective 2

(YrMoDa) F: Forced (Hours) Shutting Down Acions Comments S: Scheduled 2 030401 S 467.6 C 1 End of Cycle 16 Refueling

1. 2.

Reason: Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Tnp/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Other (Explain)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)