NMC Palisades Nuclear Plant Committed to Nuclear Excell Operated by Nuclear Management Company, LLC February 10, 2005 Technical Specification 5.6.4 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Monthly Operating Report In accordance with Technical Specification 5.6.4, attached is the Monthly Operating Report for January 2005, for the Palisades Nuclear Plant.
Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.
Daniel J. Malone Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC Enclosure (1)
CC Administrator, Region l1l, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC LBrandon, Michigan Department of Environmental Quality RJAben, Michigan Department of Labor RDWhale, Michigan Public Service Commission Records Center, INPO TLShillair, P-26-305 27780 Blue Star Memorial Highway. Covert, Michigan 49043-9530 Telephone: 269.764.2000
ENCLOSURE OPERATING DATA REPORT DOCKET NO: 50-255 DATE:
02-02-05 COMPLETED BY: SDCheatom TELEPHONE (269) 764-2103 NOTES:
Operating Data:
UNIT NAME REPORTING PERIOD:
Palisades January 2005
- 1. DESIGN ELECTRICAL RATING (NET MWe)
- 2. MAXIMUM DEPENDABLE CAPACITY (NET MWe)
- 805" 730'*
This Month Yr-to-Date Cumulative
- 3.
NUMBER OF HOURS REACTOR WAS CRITICAL
- 4.
HOURS GENERATOR ON-LINE
- 5.
UNIT RESERVE SHUTDOWN HOURS
- 6.
NET ELECTRICAL ENERGY GENERATED (MWH) 623.53 509.00 0
397709.00 623.53 509.00 0
397709.00 185323.01 179569.01 0
123965189.00
- Based on condenser backpressure
- To be determined based on power uprate implemented August 6, 2004 Page 1 of 2
V I
ENCLOSURE OPERATING DATA REPORT REPORT MONTH January 2005 DOCKET NO.
50-255 UNIT NAME Palisades DATE(MoIDaIYr) 02/02/05 COMPLETED BY__SDCheatom TELEPHONE 269-76i4-2103 UNIT SHUTDOWNS No.
Date Type Duration Reason' (Hours)
Method of Shutting Down2 Cause / Corrective Actions / Comments (YrMoDa)
F: Forced S: Scheduled 1
050109 F
235.00 A
2 Rapid loss of main condenser vacuum
- 1. Reason:
- 2. Method:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Other (Explain)
SUMMARY
- The plantbegan the month at essentiallyfull power. On 01/09/05 at 1127 hour0.013 days <br />0.313 hours <br />0.00186 weeks <br />4.288235e-4 months <br />sthe reactorwas manuallytripped dueto lowering main condenservacuum. Aleak path to the condenser was identified and repaired. On 01/14/05 at 1155 hours0.0134 days <br />0.321 hours <br />0.00191 weeks <br />4.394775e-4 months <br /> the plant achieved criticality. During turbine roll-up the turbine rotor to low pressure turbine casing differential expansion limit was reached and the turbine was manually tripped, resulting In a delay to power production. The plant was returned to service on 01/19/05 at 06:27 hours, with steady-state full power achieved on 01/21/05. The plant ended the month at essentially full power.