ML041680382
| ML041680382 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 06/09/2004 |
| From: | Domonique Malone Nuclear Management Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML041680382 (3) | |
Text
-
CommNfttedof r
Palisades Nuclear Plant Operated by Nuclear Management Company, LLC June 9, 2004 Technical Specification 5.6.4 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Monthly Operating Report In accordance with Technical Specification 5.6.4, attached is the Monthly Operating Report for May 2004, for the Palisades Nuclear Plant.
Summary of Commitments This let contains no new commitments and no revisions to existing commitments.
Daniel J. Malone Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC Enclosure (1)
CC Administrator, Region IlIl, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC LBrandon, Michigan Department of Environmental Quality RJAben, Michigan Department of Labor RDWhale, Michigan Public Service Commission Records Center, INPO TLShillair, P-26-305 27780 Blue Star Memorial Highway
- Covert, Michigan 49043-9530 Telephone: 269.764.2000
ENCLOSURE OPERATING DATA REPORT DOCKET NO: 50-255 DATE:
06-01-04 COMPLETED BY: SFPierce TELEPHONE (269) 764-2239 NOTES:
Operating Data:
UNIT NAME REPORTING PERIOD:
Palisades May 2004
- 1. DESIGN ELECTRICAL RATING (NET Mwe)
- 2. MAXIMUM DEPENDABLE CAPACITY (NET Mwe) -
805 730 This Month
- 3.
NUMBER OF HOURS REACTOR WAS CRITICAL
- 4.
HOURS GENERATOR ON-LINE
- 5.
UNIT RESERVE SHUTDOWN HOURS
- 6.
NET ELECTRICAL ENERGY GENERATED (MWH) 744.0 744.0 0
Yr-to-Date 3647.0 3647.0 0
2883113 Cumulative 181118.5 175540.8 0
121104453 583466
' Based on condenser backpressure Page 1 of 2
ENCLOSURE OPERATING DATA REPORT REPORT MONTH May 2004 DOCKET NO.
50-255 UNIT NAME -Palisades DATE(Mo/Da/Yr) _ 06/01104 COMPLETED BY-SFPierce TELEPHONE 269-764-2239 UNIT SHUTDOWNS No.
Date (YrMoDa)
Type F: Forced S: Scheduled Duration Reason' (Hours)
Method of Shutting Down2 Cause / Corrective Actions Comments NONE
- 1. Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination
- 2. Method:
1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Other (Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
SUMMARY
- The plant operated at essentially full power for the entire month.
Page 2 of 2