Committed to Nuclear Meence Palisades Nuclear Plant Operated by Nuclear Management Company, LLC March 13, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 DOCKET 50-255 - LICENSE DPR PALISADES NUCLEAR PLANT LICENSEE REPORT OF MONTHLY OPERATING DATA
_-J--.-ched are the Monthly Operating Data and Summary of Operating Experience for th* Palisades Nuclear Plant for the month of February 2002.
If you have any questions, please contact Mr. Rich Schmidt at (616) 764-2185.
Laurie A. Lahti Manager, Licensing CC Regional Administrator, USNRC, Region III NRC Resident Inspector, Palisades LBrandon, Michigan Department of Environmental Quality RJAben, Michigan Department of Labor RDWhale, Michigan Public Service Commission Records Center, INPO SMMcIntyre, P-26-204 Attachment 27780 Blue Star Memorial Highway 0 Covert, MI 49043 Telephone: 616.764.2000
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 3/05/02 COMPLETED BY SFPierce TELEPHONE (616)764-2239 MONTH February 2002 DAY AVERAGE DAILY POWER LEVEL (MWe Net)
- 1.
796
- 2.
797
- 3.
796
- 4.
796
- 5.
797
- 6.
797
- 7.
797
- 8.
797
- 9.
797
- 10.
797
- 11.
796
- 12.
793
- 13.
797
- 14.
796
- 15.
796
- 16.
797 DAY AVERAGE DAILY POWER LEVEL (MWe Net)
- 17.
797
- 18.
797
- 19.
796
- 20.
798
- 21.
810
- 22.
811
- 23.
811
- 24.
809
- 25.
809
- 26.
810
- 27.
810
- 28.
810
- 29.
N/A
- 30.
N/A
- 31.
N/A INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.
Compute to the nearest whole megawatt.
SUMMARY
OF OPERATING EXPERIENCE FOR FEBRUARY 2002 The plant operated at full power for the entire month.
OPERATING DATA REPORT DOCKET NO:
50-255 DATE (Mo-Da-Yr): 03-04-02 COMPLETED BY: SFPierce TELEPHONE (616) 764-2239 OPERATING STATUS:
NOTES:
- 1. UNIT NAME Palisades
- 2. REPORTING PERIOD (YrMoDa-YrMoDa):
020201-020228
- 3. LICENSED THERMAL POWER (Mwt) 2530
- 4. NAMEPLATE RATING (GROSS Mwe) 811.7
- 5. DESIGN ELECTRICAL RATING (NET Mwe) 805
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS Mwe) 770
- 7. MAXIMUM DEPENDABLE CAPACITY (NET Mwe) 730
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEM NUMBERS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
This Month Yr-to-Date Cumulative
- 11.
HOURS IN REPORTING PERIOD 672.0 1416.0 264711.0
- 12.
NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1024.4 162251.1
- 13.
REACTOR RESERVE SHUTDOWN HOURS
- 14.
HOURS GENERATOR ON-LINE 672.0 930.6 156721.1
- 15.
UNIT RESERVE SHUTDOWN HOURS
- 16.
GROSS THERMAL ENERGY GENERATED (MWH) 1699451 2274515 353399092
- 17.
GROSS ELECTRICAL ENERGY GENERATED (MWH) 563142 749736 112508764
- 18.
NET ELECTRICAL ENERGY GENERATED (MWH) 537832 714814 106408629
- 19.
UNIT SERVICE FACTOR 100.0%
65.7%
59.2%
- 20.
UNIT AVAILABILITY FACTOR 100.0%
65.7%
59.2%
- 21.
UNIT CAPACITY FACTOR (USING MDC NET)
- 109.6%
69.2%
58.1%
- 22.
UNIT CAPACITY FACTOR (USING DER NET) 99.4%
62.7%
49.9%
- 23.
UNIT FORCED OUTAGE RATE 0.0%
34.3%
26.2%
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
Forecast Achieved INITIAL CRITICALITY INITIAL'ELECTRICITY COMMERCIAL OPERATION
- Based on condenser backpressure
- Weighted Average (635 MWe used as MDC Net prior to October 1985)
REPORT MONTH February 2002 DOCKET NO 50-255 UNIT Palisades DATE(Mo/Da/Yr) 03/05/02 COMPLETED BY SFPierce TELEPHONE 616-764-2239 UNIT SHUTDOWNS AND POWER REDUCTIONS No.
Date (YrMoDa)
Type1 Duration (Hours)
Reason2 Method of Shutting Down Reactor2 Licensee Event Report #
System Component Code 4 Code5 Cause & Corrective Action to Prevent Recurrence NONE
- 2.
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
- 3.
Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Other (Explain)
- 4.
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
- 5.
Exhibit I - Same Source
- 1.
F: Forced S: Scheduled