ML033280025

From kanterella
Jump to navigation Jump to search
October 2003 Monthly Operating Report for Palisades Nuclear Plant
ML033280025
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/11/2003
From: Domonique Malone
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML033280025 (3)


Text

-

i Com mitted to ouler x e Palisades Nuclear Plant Operated by Nuclear Management Company, LLC November 11, 2003 Tech Spec 5.6.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Monthly Operating Report - Palisades Nuclear Plant In accordance with Technical Specification 5.6.4, attached is the Monthly Operating Report for October 2003, for the Palisades Nuclear Plant.

Summary of Commitments This letter makes no new commitments.

Daniel M

Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC Enclosure cc:

Administrator, USNRC, Region IlIl NRC Resident Inspector, Palisades, USNRC LBrandon, Michigan Department of Environmental Quality RJAben, Michigan Department of Labor RDWhale, Michigan Public Service Commission Records Center, INPO TLShillair, P-26-305 27780 Blue Star Memorial Highway

  • Covert, Michigan 49043-9530 Telephone: 269.764.2000

ENCLOSURE OPERATING DATA REPORT DOCKET NO: 50-255 DATE: 11-03-03 COMPLETED BY: SFPierce TELEPHONE (269) 764-2239 NOTES:

Operating Data:

1. UNIT NAME Palisades
2. REPORTING PERIOD:

October 2003

3. LICENSED THERMAL POWER (Mwt) 2530
4. NAMEPLATE RATING (GROSS Mwe) 811.7
5. DESIGN ELECTRICAL RATING (NET Mwe) 805
6. MAXIMUM DEPENDABLE CAPACITY (GROSS Mwe) 770
7. MAXIMUM DEPENDABLE CAPACITY (NET Mwe) 730
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEM NUMBERS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
10. REASONS FOR RESTRICTIONS, IF ANY:

This Month Yr-to-Date Cumulative

11.

HOURS IN REPORTING PERIOD 745.0 7296.0 279351.0

12.

NUMBEROF HOURS REACTOR WAS CRITICAL 745.0 6479.3 176007.5

13.

REACTOR RESERVE SHUTDOWN HOURS

14.

HOURS GENERATOR ON-LINE 745.0 6450.8 170429.8

15.

UNIT RESERVE SHUTDOWN HOURS

16.

GROSS THERMAL ENERGY GENERATED (MWH) 1881742 16084757 387533225

17.

GROSS ELECTRICAL ENERGY GENERATED (MWH) 617122 5249790 123687825

18.

NET ELECTRICAL ENERGY GENERATED (MWH) 588899 5007358 117070544

19.

UNIT SERVICE FACTOR 100.0%

88.4%

61.0%

20.

UNIT AVAILABILITY FACTOR 100.0%

88.4%

61.0%

21.

UNIT CAPACITY FACTOR (USING MDC NET)-

108.3%

94.0%

60.3%-

22.

UNIT CAPACITY FACTOR (USING DER NET) 98.2%

85.3%

52.1%

23.

UNIT FORCED OUTAGE RATE 0.0%

0.0%

24.6%

- Based on condenser backpressure

  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

Page 1 of 2

III ENCLOSURE OPERATING DATA REPORT REPORT PERIOD: October 2003 DOCKET NO.: 50-255 UNIT NAME: Palisades DATE: 11/03/03 COMPLETED BY: SFPierce TELEPHONE: 269-764-2239 UNIT SHUTDOWNS No. Date Type F: Forced S: Scheduled Duration Reason' Method of Shutting Down2 Cause / Corrective Actions Comments NONE

1. Reason A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

2. Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Other (Explain)

SUMMARY

The plant operated at essentially full power (at greater than 99%) for the entire month.

Page 2 of 2