August 2002 Monthly Operating Report for Palisades
ML022620221
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/11/2002
From: Lahti L
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML022620221 (4)


Text

Ncle C Committed to Nuclear Excellen Palisades Nuclear Plant Operated by Nuclear Management Company, LLC September 11, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Wa-sin-ton, DC-20555:0001 DOCKET 50-255 - LICENSE DPR PALISADES NUCLEAR PLANT LICENSEE REPORT OF MONTHLY OPERATING DATA Attached are the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of August 2002.

If you have any questions, please contact Mr. Scott Hawn at (616) 764-3179.

Laurie A. Lahti Manager, Licensing CC Regional Administrator, USNRC, Region III NRC Resident Inspector, Palisades LBrandon, Michigan Department of Environmental Quality RJAben,.Michigan -Department ktLabor....

RDWhale, Michigan Public Service Commission Records Center, INPO SMMclntyre, P-26-204 Attachment 27780 Blue Star Memorial Highway

  • Covert, Ml 49043 Telephone-616.764 2000

SUMMARY

OF OPERATING EXPERIENCE FOR AUGUST 2002 The plant operated at essentially full power (at greater than 99%) until August 26, when power was reduced to about 87% for repairs to the "B" Heater Drain Pump (P-103B). Power was further reduced to about 50% on August 27 to allow an oil addition to the "D" Primary Coolant Pump (P-50D). After the oil addition, power was increased to about the 88% power level on August 28, where power was held pending repair to Heater Drain Pump P-10B. These repairs were completed on August 29, and power was restored to essentially full power on August 30. The plant completed the month at essentially full power.

OPERATING DATA REPORT DOCKET NO 50-255 DATE (Mo-Da-Yr) 09-05-02 COMPLETED BY: SFPierce TELEPHONE (616) 764-2239 OPERATING STATUS:

NOTES:

1. UNIT NAME Palisades
2. REPORTING PERIOD (YrMoDa-YrMoDa) 020801-020831
3. LICENSED THERMAL POWER (Mwt) 2530
4. NAMEPLATE RATING (GROSS Mwe) 811.7
5. DESIGN ELECTRICAL RATING (NET Mwe) 805
6. MAXIMUM DEPENDABLE CAPACI1Y (GROSS Mwe) 770
7. MAXIMUM DEPENDABLE CAPACIIY (NET Mwe) 730 871IF CHANGES OCCUR IN CAPACITY RATINGS (ITEM NUMBERS 3 'THROUGH 7) SINCE LAST REPORT,-GIVE REASONS-.
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe)'

10 REASONS FOR RESTRICTIONS, IF ANY' This Month Yr-to-Date Cumulative

11.

HOURS IN REPORTING PERIOD 7440 5831.0 269126.0

12.

NUMBER OF HOURS REACTOR WAS CRITICAL 7440 5439.4 166666.1

13.

REACTOR RESERVE SHUTDOWN HOURS

14.

HOURS GENERATOR ON-LINE 7440 5345.6 161136.1

15.

UNIT RESERVE SHUTDOWN HOURS

16. GROSS THERMAL ENERGY GENERATED (MWH) 1837173 13258705 364383282
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 594345 4360525 116119553
18.

NET ELECTRICAL ENERGY GENERATED (MWH) 565950 4158397 109852212

19.

UNIT SERVICE FACTOR 100.0%

91.7%

599%

20 UNITAVAILABILITY FACTOR 1000%

91.7%

599%

21.

UNIT CAPACITY FACTOR (USING MDC NET)

  • 104.2%

97.7%

589%

22.

UNIT CAPACITY FACTOR (USING DER NET) 94.5%

886%

50.7%

23 UNIT FORCED OUTAGE RATE 0.0%

8 3%

256%

Based on condenser backpressure Weighted Average (635 MWe used as MDC Net prior to Wober 1985)

REPORT MONTH August 2002 DOCKET NO.

50-255 UNIT NAME Pahsades DATE(MolDa/Yr).

09/05102 COMPLETED BY_ SFPierce TELEPHONE 616-764-2239 UNIT SHUTDOWNS No.

Date Type (YrMoDa)

F: Forced S: Scheduled NO SHUTDOWNS THIS McNTH Duration (Houirs)

1.

1 Reason:

A-Equipment Failure (E~plain)

B-Maintenance or Test C-Refueling I

'I D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Reason' Method of Shutting Down 2

2.

Method:

I-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Other (Explain) dCause / Corrective Actions Comments I

i p

.1