ML043220391
| ML043220391 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 11/04/2004 |
| From: | Domonique Malone Nuclear Management Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML043220391 (3) | |
Text
Palisades Nuclear Plant Committed to Nuclear Excellence
-- Operated by Nuclear Management Company, LLC November 4, 2004 Technical Specification 5.6.4 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Monthly Operating Report In accordance with Technical Specification 5.6.4, attached is the Monthly Operating Report for October 2004, for the Palisades Nuclear Plant.
Summarv of Commitments This letter contains no new commitments and no revisions to existing commitments.
Daniel Malone Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC Enclosure (1)
CC Administrator, Region IlIl, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC LBrandon, Michigan Department of Environmental Quality RJAben, Michigan Department of Labor RDWhale, Michigan Public Service Commission Records Center, INPO TLShillair, P-26-305 27780 Blue Star Memorial Highway
- Covert, Michigan 49043-9530 Telephone: 269.764.2000
ENCLOSURE OPERATING DATA REPORT DOCKET NO: 50-255 DATE:
11-01-04 COMPLETED BY: SDCheatom TELEPHONE (269) 764-2103 NOTES:
Operating Data:
UNIT NAME Palisades REPORTING PERIOD:
October 2004
- 1. DESIGN ELECTRICAL RATING (NET MWe) 805"
- 2. MAXIMUM DEPENDABLE CAPACITY (NET MWe) 730'*
This Month Yr-to-Date Cumulative
- 3.
NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 6123.4 183594.8
- 4.
HOURS GENERATOR ON-LINE 0.0 6103.3 177997.1
- 5.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
- 6.
NET ELECTRICAL ENERGY GENERATED (MWH) 0 4530084 122751424 Based on condenser backpressure
" To be determined based on power uprate Implemented August 6, 2004 Page 1 of 2
a?.
ENCLOSURE OPERATING DATA REPORT REPORT MONTH October 2004 DOCKET NO.
50-255 UNIT NAME Palisades DATE(Mo/DaIYr) 1f01/04 COMPLETED BY SDCheatom TELEPHONE 269-7(;4-2103 UNIT SHUTDOWNS No.
Date Type Duration Reason' Method of Cause / Corrective Actions I Comments (YrMoDa)
F: Forced S: Scheduled (Hours)
Shutting Down2 3
040919 S
745.0 C
4 The plant remained off-line for Refueling Outage 17 and reactor head Inspection and repairs.
- 1. Reason:
- 2. Method:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Other (Explain)
SUMMARY
- The plant remained off-line for the entire month due to Refueling Outage 17 and reactor head Inspection and repair.
Page 2of2 I