ML050190251

From kanterella
Jump to navigation Jump to search

December 2004 Monthly Operating Report Palisades Nuclear Plant
ML050190251
Person / Time
Site: Palisades Entergy icon.png
Issue date: 01/12/2005
From: Domonique Malone
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML050190251 (3)


Text

_4 M

4 NNCmeto Palisades Nuclear Plant Commited to Nuclar Excel Operated by Nuclear Management Company, LLC January 12, 2005 Technical Specification 5.6.4 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Monthly Operating Report In accordance with Technical Specification 5.6.4, attached is the Monthly Operating Report for December 2004, for the Palisades Nuclear Plant.

Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.

Daniel J. Malone Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC Enclosure (1)

CC Administrator, Region l1l, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC LBrandon, Michigan Department of Environmental Quality RJAben, Michigan Department of Labor RDWhale, Michigan Public Service Commission Records Center, INPO TLShillair, P-26-305 27780 Blue Star Memorial Highway. Covert, Michigan 49043-9530 Telephone: 269.764.2000

ENCLOSURE OPERATING DATA REPORT DOCKET NO: 50-255 DATE:

01-03-05 COMPLETED BY: SDCheatom TELEPHONE (269) 764-2103 NOTES:

Operating Data:

UNIT NAME REPORTING PERIOD:

Palisades December 2004

1. DESIGN ELECTRICAL RATING (NET MWe)
2. MAXIMUM DEPENDABLE CAPACITY (NET MWe) -

805" 730" This Month

3.

NUMBER OF HOURS REACTOR WAS CRITICAL

4.

HOURS GENERATOR ON-LINE

5.

UNIT RESERVE SHUTDOWN HOURS

6.

NET ELECTRICAL ENERGY GENERATED (MWH) 744.0 744.0 Yr-to-Date 7228.0 7166.2 0

5346140 Cumulative 184699.5 179060.0 0

123567480 0

597732

  • Based on condenser backpressure
  • - To be determined based on power uprate implemented August 6, 2004 Page 1 of 2

l1 ENCLOSURE OPERATING DATA REPORT REPORT MONTH December 2004 DOCKET NO. _

50-255 UNIT NAME Palisades DATE(Mo/Da/Yr) 01/03104 COMPLETED BY SDCheatom TELEPHONE 269-7fl4-2103 UNIT SHUTDOWNS No.

Date Type Duration Reason' (Hours)

Method of Shutting Down2 Cause I Corrective Actions / Comments (YrMoDa)

F: Forced S: Scheduled

1. Reason:
2. Method:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Other (Explain)

SUMMARY

The plant operated at essentially full power this month.

Page 2 of 2