Palisades Nuclear Plant Operated by Nuclear Management Company, LLC February 11, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 DOCKET 50-255 LICENSE DPR-20 PALISADES NUCLEAR PLANT LICENSEE REPORT OF MONTHLY OPERATING DATA Attached are the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of January 2003.
If you have any questions, please contact Mr. Scott Hawn at (269) 764-3179.
Douglas-E. Cooper Palisades Site Vice President CC Regional Administrator, USNRC, Region III NRC Resident Inspector, Palisades LBrandon, Michigan Department of Environmental Quality RJAben, Michigan Department of Labor '
RDWhale, Michigan Public Service Commission Records Center, INPO SMMclntyre, P-26-204 Attachments 27780 Blue Star Memorial Highway 0 Covert, MI 49043 Telephone: 616.764.2000
-*694
-i
SUMMARY
OF OPERATING EXPERIENCE FOR JANUARY 2003 The plant operated at essentially full power (at greater than 99%) until January 15, 2003, when power was reduced to approximately 62% due to a problem with Steam Generator Level Instrument setpoints. The problem was corrected and the plant was returned to essentially full power on January 17th. The plant completed the month at essentially full power.
"-i OPERATING DATA REPORT DOCKET NO.
50-255 DATE (Mo-Da-Yr) 02-05-03 COMPLETED BY: HAReyner TELEPHONE (269) 764-2057 OPERATING STATUS NOTES:
- 1. UNIT NAME Palisades 2 REPORTING PERIOD (YrMoDa-YrMoDa) 030101-030131 3 LICENSED THERMAL POWER (Mwt) 2530
- 4. NAMEPLATE RATING (GROSS Mwe) 811.7
- 5. DESIGN ELECTRICAL RATING (NET Mwe) 805
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS Mwe) 770
- 7. MAXIMUM DEPENDABLE CAPACITY (NET Mwe) 730 8 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEM NUMBERS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS 9 POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe)"
10 REASONS FOR RESTRICTIONS, IF ANY.
This Month Yr-to-Date Cumulative
- 11.
HOURS IN REPORTING PERIOD 7440 7440 2727990 12 NUMBER OF HOURS REACTOR WAS CRITICAL 7440 7440 1702722
- 13.
REACTOR RESERVE SHUTDOWN HOURS
- 14.
HOURS GENERATOR ON-LINE 744.0 7440 164723.0
- 15.
UNIT RESERVE SHUTDOWN HOURS
- 16.
GROSS THERMAL ENERGY GENERATED (MWH) 1858313 1858313 373306780
- 17.
GROSS ELECTRICAL ENERGY GENERATED (MWH) 619012 619012 119057047
- 18.
NET ELECTRICAL ENERGY GENERATED (MWH) 591649 591649 112654835 19 UNIT SERVICE FACTOR 100 0%
100 0%
604%
20 UNIT AVAILABILITY FACTOR 1000%
1000%
604%
- 21.
UNIT CAPACITY FACTOR (USING MDC NET)-
1089%
1089%
59.5%
- 22.
UNIT CAPACITY FACTOR (USING DER NET) 988%
988%
51 3%
23 UNIT FORCED OUTAGE RATE 0.0%
00%
252%
- Based on condenser backpressure
- Weighted Average (635 MWe used as MDC Net prior to October 1985)
REPORT MONTH January 2003 DOCKET NO 50-255 UNIT NAME Palisades DATE(MoIDaIYr) 02/05/03 COMPLETED BY HAReyner TELEPHONE 269-764-2057 UNIT SHUTDOWNS No Date (YrMoDa)
Type F: Forced S" Scheduled Duration (Hours)
Reason' Method of Shutting Down 2
Cause / Corrective Actions Comments NONE
- 1.
Reason A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
- 2.
Method:
1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Other (Explain)
I