ML040760700

From kanterella
Jump to navigation Jump to search

February 2004 Monthly Operating Report for Palisades Nuclear Plant
ML040760700
Person / Time
Site: Palisades 
Issue date: 03/08/2004
From: Domonique Malone
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML040760700 (3)


Text

Committed to Nu !x'ce¶?ce Palisades Nuclear Plant Operated by Nuclear Management Company, LLC March 8, 2004 Technical Specification 5.6.4 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Monthly Operating Report In accordance with Technical Specification 5.6.4, attached is the Monthly Operating Report for February 2004, for the Palisades Nuclear Plant.

Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.

Daniel J. Malone Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC Enclosure (1)

CC Administrator, Region IlIl, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC LBrandon, Michigan Department of Environmental Quality RJAben, Michigan Department of Labor RDWhale, Michigan Public Service Commission Records Center, INPO TLShillair, P-26-305 27780 Blue Star Memorial Highway. Covert, Michigan 49043-9530 Telephone: 269.764.2000

ENCLOSURE OPERATING DATA REPORT DOCKET NO: 50-255 DATE:

03-02-04 COMPLETED BY: SDCheatom TELEPHONE (269) 764-2103 NOTES:

Operating Data:

UNIT NAME REPORTING PERIOD:

1. DESIGN ELECTRICAL RATING (NET Mwe)
2. MAXIMUM DEPENDABLE CAPACITY (NET Mwe) ^

Palisades February 2004 805 730 This Month 3.

4.

5.

6.

NUMBER OF HOURS REACTOR WAS CRITICAL HOURS GENERATOR ON-LINE UNIT RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED (MWH) 696.0 696.0 Yr-to-Date 1440.0 1440.0 0

1134278 Cumulative 178911.5 173333.8 0

119355618 0

537116

^ Based on condenser backpressure Page 1 of 2

ENCLOSURE OPERATING DATA REPORT REPORT MONTH February 2004 DOCKET NO.

50-255 UNIT NAME Palisades DATE(MoJDaIYr) 03102104 COMPLETED BY SDCheatom TELEPHONE 269-764-2103 UNIT SHUTDOWNS No.

Date (YrMoDa)

Type F: Forced S: Scheduled Duration Reason' (Hours)

Method of Shutting Down' Cause / Corrective Actions Comments NONE

1. Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

2. Method:

1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Other (Explain)

SUMMARY

The plant operated at essentially full power until February 18, 2004, when power was reduced to 72% for main feed pump repairs. On February 19. 2004, power was reduced to 59% to complete repairs and testing. While at reduced power. Heater Drain Pump P-1 OA was repacked and turbine valve testing was completed. Full power was restored on February 22, 2004, and the plant operated at essentially full power for the remainder of the month.

Page 2 of 2