ML041410301

From kanterella
Jump to navigation Jump to search
April 2004 Monthly Operating Report for Palisades Nuclear Plant
ML041410301
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/10/2004
From: Domonique Malone
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML041410301 (3)


Text

Comm to N1ted or Palisades Nuclear Plant Operated by Nuclear Management Company, LLC May 10, 2004 Technical Specification 5.6.4 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Monthly Operating Report In accordance with Technical Specification 5.6.4, attached is the Monthly Operating Report for April 2004, for the Palisades Nuclear Plant.

Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.

Daniel J. Malone Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC Enclosure (1)

CC Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC LBrandon, Michigan Department of Environmental Quality RJAben, Michigan Department of Labor RDWhale, Michigan Public Service Commission Records Center, INPO TLShillair, P-26-305 27780 Blue Star Memorial Highway

  • Covert, Michigan 49043-9530 Telephone: 269.764.2000

ENCLOSURE OPERATING DATA REPORT DOCKET NO: 50-255 DATE: 05-02-04 COMPLETED BY: SDCheatom TELEPHONE (269) 764-2103 NOTES:

Operating Data:

UNIT NAME Palisades REPORTING PERIOD: April 2004

1. DESIGN ELECTRICAL RATING (NET Mwe) 805
2. MAXIMUM DEPENDABLE CAPACITY (NET Mwe)
  • 730 This Month Yr-to-Date Cumulative
3. NUMBER OF HOURS REACTOR WAS CRITICAL 719.0 2903.0 180374.5
4. HOURS GENERATOR ON-LINE 719.0 2903.0 174796.8
5. UNIT RESERVE SHUTDOWN HOURS 0 0 0
6. NET ELECTRICAL ENERGY GENERATED (MWH) 569271 2299647 120520987 Based on condenser backpressure Page 1 of 2

ENCLOSURE OPERATING DATA REPORT REPORT MONTH Aoril 2004 DOCKET NO. 255 UNIT NAME Palisades DATE(MoIDalYr)_ 05/02/04 COMPLETED BY SOCheatom TELEPHONE 269-764-2103 UNIT SHUTDOWNS No. Date Type Duration Reason' Method of Cause / Corrective 2

(YrMoDa) F: Forced (Hours) Shutting Down Actions Comments S: Scheduled NONE

1. Reason: 2. Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Other (Explain)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

The plant operated at essentially full power until April 29, 2004, when power was reduced to 88% for turbine governor valve repairs. Power was eventually reduced to 87%

to complete repairs and testing. Full power was restored on April 30, 2004, and the plant completed the month at essentially full power.

Page 2 of 2