November 2003 Monthly Operating Report for Palisades Nuclear Plant
ML033570401
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/11/2003
From: Domonique Malone
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML033570401 (3)


Text

CommitedMto C

Palisades Nuclear Plant Operated by Nuclear Management Company, LLC December 11, 2003 Technical Specification 5.6.4 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Monthly Operating Reiort - Palisades Nuclear Plant In accordance with Technical Specification 5.6.4, attached is the Monthly Operating Report for November 2003, for the Palisades Nuclear Plant.

Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.

Daniel J. Malone Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC Enclosure (1)

CC Administrator, Region ll, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC LBrandon, Michigan Department of Environmental Quality RJAben, Michigan Department of Labor RDWhale, Michigan Public Service Commission Records Center, INPO TLShillair, P-26-305 27780 Blue Star Memorial Highway

  • Covert, Michigan 49043-9530 Telephone: 269.764.2000
s ENCLOSURE OPERATING DATA REPORT DOCKET NO: 50-255 DATE:

12-03-03 COMPLETED BY: SFPierce TELEPHONE (269) 764-2239 NOTES:

Operating Data:

UNIT NAME REPORTING PERIOD:

Palisades November 2003

1. DESIGN ELECTRICAL RATING (NET Mwe)
2. MAXIMUM DEPENDABLE CAPACITY (NET Mwe)
  • 805 730 This Month
3.

NUMBER OF HOURS REACTOR WAS CRITICAL

4.

HOURS GENERATOR ON-LINE

5.

UNIT RESERVE SHUTDOWN HOURS

6.

NET ELECTRICAL ENERGY GENERATED (MWH) 720.0 720.0 0

Yr-to-Date 7199.3 7170.8 0

5560880 Cumulative 176727.5 171149.8 0

117624066 553522

  • Based on condenser backpressure Page 1 of 2

2*

ENCLOSURE OPERATING DATA REPORT REPORT MONTH November 2003 DOCKET NO.

50-255 UNIT NAME Palisades DATE(Mo/DaIYr) 12/03/03 COMPLETED BY SFPierce TELEPHONE 269-71;4-2239 UNIT SHUTDOWNS No. Date Type F: Forced S: Scheduled Duration Reason' (Hours)

Method of Shutting Down2 Cause / Corrective Actions Comments NONE

1. Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

2. Method:

1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Other (Explain)

SUMMARY

The plant began the month at essentially full power (greater than 99%). The plant reduced power to approximately 84%

on November 8 to conduct turbine valve testing. During testing, a heater drain system level control valve stuck partially open requiring a further reduction in power to 72 percent on November 9. Following test completion and level control valve repairs, power escalation to 90 percent reactor power occurred November 10. Power was maintained at about 90% until November 13, when repairs to a heater drain pump discharge check valve were completed. On November 13, power was increased to full power, and the plant completed the month operating at full power (greater than 99%).

Page 2 of 2