-N Comimitted to ue Ecell ence Palisades Nuclear Plant Operated by Nuclear Management Company, LLC July 15, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 PALISADES NUCLEAR PLANT DOCKET 50-255 LICENSE No. DPR-20 LICENSEE REPORT OF MONTHLY OPERATING DATA Attached are the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of June 2003.
Please contact Mr. Scott Hawn at (269) 764-3179 with any questions.
a E.oCooper Site Vi resident, Palisades CC Regional Administrator, USNRC, Region IlIl NRC Resident Inspector, Palisades LBrandon, Michigan Department of Environmental Quality RJAben, Michigan Department of Labor RDWhale, Michigan Public Service Commission Records Center, INPO.
SMMcIntyre, P-26-204 Attachments
SUMMARY
OF OPERATING EXPERIENCE FOR JUNE 2003 The plant operated at essentially full power (at greater than 99%) for the entire month.
- 3 OPERATING DATA REPORT DOCKET NO
50-255 DATE (Mo-Da-Yr): 07-03.03 COMPLETED BY: HAReyner TELEPHONE (269) 764-2057 NOTES:
OPERATING STATUS:
- 1. UNIT NAME Palisades
- 2. REPORTING PERIOD (YrMoDa-YrMoDa):
030601-030630
- 3. LICENSED THERMAL POWER (Mwt) 2530
- 4. NAMEPLATE RATING (GROSS Mwe) 811.7
- 5. DESIGN ELECTRICAL RATING (NET Mwe) 805
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS Mwe) 770
- 7. MAXIMUM DEPENDABLE CAPACITY (NET Mwe) 730
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEM NUMBERS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
This Month
- 11.
HOURS IN REPORTING PERIOD
- 12.
NUMBER OF HOURS REACTOR WAS CRITICAL
- 13.
REACTOR RESERVE SHUTDOWN HOURS
- 14.
HOURS GENERATOR ON-LINE
- 15.
UNIT RESERVE SHUTDOWN HOURS
- 16.
GROSS THERMAL ENERGY GENERATED (MWH)
- 17.
GROSS ELECTRICAL ENERGY GENERATED (MWH)
- 18.
NET ELECTRICAL ENERGY GENERATED (MWH)
- 19.
UNIT SERVICE FACTOR
- 20.
UNIT AVAILABILITY FACTOR
- 21.
UNIT CAPACITY FACTOR (USING MDC NET)-
- 22.
UNIT CAPACITY FACTOR (USING DER NET)
- 23.
UNIT FORCED OUTAGE RATE 720.0 720.0 720.0 1821557 594254 566907 100.0%
100.0%
107.9%
97.8%
0.0%
Yr-to-Date 4343.0 3526.3 3497.8 8659446 2853123 2722716 80.5%
80.5%
85.9%
77.9%
0.0%
Cumulative 276398.0 173054.5 167476.8 380107914 121291158 114785902 60.6%
60.6%
59.8%*
51.6%
24.9%
Based on condenser backpressure
- Weighted Average (635 MWe used as MDC Net prior to October 1985)
),
REPORT MONTH June 2003 DOCKET NO.
50-255 UNIT NAME Palisades DATE(Mo/DatYr) 07/0303 COMPLETED BY HAR TELEPHONE 2697642057 UNIT SHUTDOWNS No.
Date (YrMoDa)
Type F: Forced S: Scheduled Duration Reason' Method of (Hours)
Shutting Down2 Cause / Corrective Actions Comments NONE 1.
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restiction E-Operator Training & Ucense Examination F-Administrative G-Operational Error (Explain)
H-Oer (Explain) 2.
Method:
1-Manual 2-Manual Trip/Scram 3-Automatic TriplScram 4-ther (Explain)