ML16340C378

From kanterella
Revision as of 22:44, 18 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP OP-15 Re Loss of Feedwater Flow & EP OP-20 Re Excessive RCS Leakage. Privacy & Proprietary Info Deleted Per Generic Ltr 81-27
ML16340C378
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/02/1982
From: Crane P
PACIFIC GAS & ELECTRIC CO.
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML16340C377 List:
References
GL-81-27, NUDOCS 8203110152
Download: ML16340C378 (12)


Text

PAC IP I C CvA.S A.ND ZLZC TB.ZC C'O2ZPA

~

KT'(p

~ P. O. BOX 7442 ~ 77 BEALE STREET. 31ST FLOOR, SAN FRANCISCO. CALIFORNIA 94106 TELEPHONE 1415) 781-4211 TELECOPIER (415) 540)7813 March 2, 1982 Mr. R. H. Engelken, Regional Administrator Office of Inspection and Enforcement Iy Region V U. S. Nuclear Regulatory Commission RQQ p>> 7

/gal 1450 Maria Lane,, Suite 210 gP g~ >9 Walnut Creek, CA 94596 8<m,

~g(~+%(ggf Re: Docket No. 50-275 Docket No. 50-323 License No. DPR-76 Diablo Canyon Units 1 and 2

Dear Mr. Engelken:

In: accordance with Section V, "Implementing Procedures" of 10 CFR 50, Appendix E, we are submitting three copies of each of the updates to the detailed Implementing, Procedures for the Diablo Canyon Power Plant Units 1 and 2 Emergency- Plan as, listed on the attached.. Concurrently, ten copies of each update are being submitted; to Mr. Harold R. Denton, Director of Nuclear Reactor Regulation.

within 'Procedure RB-8, Revision 1, there is proprietary information.

This occurs on page 3 of 39 and has been bracketed. in accordance with NRC Generic Letter No. 81-27.

PDR F... '.

8203iiOi52 .820305 ADOCK'5000275

'<<PDR...,

'I

~

(,,i T

.4

Mr. R. H. Engelken, March 2, 1982 Kin41y acknowledge receipt of the above material on the enclosed copy of'this letter

'L and return it to me in the enclosed addressed envelope.

Very truly yours, Philip A. Crane, Jr.

Enclosures cc (w/enc.): Mr.- Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mashington,, D.C., 20555 cc, (w/o enc.): Mr. F. J Miraglia, Jr.

Licensi.ng Branch No. 3 Division of Licensing U.. S'.. Nuclear Regulatory Coaeission Mashington, D. C. 20555 cc (w/enc.): Service List

,r UPDATES TO DCPP IMPLEMENTING PROCEDURES Procedure Revisions Volume 3A OP-15, Revision 4 OP-19, Revision 2 OP-20, Revision 2 OP-30, Revision 1 OP-32, Revision 1 OP-33, Revision 1 OP-39,. Revision 1 OP-44, Revision 2 G-l, Revision 2 Volume 3B RB-7',, Revision 1 RB-8, Revision 1 On-the-Spot Change Volume 38 RB-6, Add Table-3 Table of Contents Volume 3A Volume 3B

0 WA.CIP'XW C" A.K MM'Z) MI MC~~rC Qc>M~~

P 0 BOX 7442 ~ 77 SEALE STREET~ 31ST FLOORS SAN FRANCISCO'ALIFORNIA94195 TELEPHONE (415) 781-4211 TELECOPIER (415) 5~7813 March 2, 1982 Mr. R. H. Engelken, Regional Administrator Office of Inspection and Enforcement Region V U. S. Nuclear Regulatory Commission FI~-.Pr-)yrg 1450 ffaria Lane, Suite 210 Walnut Creek, CA 94596 08 MaR 1987.t 6 Re: Docket No. 50-275 Docket No. 50-323 HC Jg License No. DPR-76 Diablo Canyon Units 1 and 2

Dear Mr. Engelken:

In accordance with Section V, "Implementing Procedures". of 10 CFR 50, Appendix E, we are submitting three copies of each of the updates to the detailed Implementing procedures for the Diablo Canyon power plant Units 1 and 2 Emergency Plan as listed on the attached. Concurrently, ten copies of each update are being submitted to Mr. Harold R. Denton, Director of Nuclear Reactor Regulation.

Within Procedure RB-8, Revision 1, there is proprietary information.

This occurs on page 3 of 39 and has been bracketed in accordance with NRC Generic Letter No. 81-27.

~o t

+e

~C'gq)) .sf p ) ~ I'l.% f '~

~ Q ~4'C4:rl V'L '0 g.g

~

Hr. R. H. Engelken, March 2, 1982 Kindly acknowledge receipt of the above material on the enclosed copy of'this letter and return it to ne in the enclosed addressed envelope.

Yery truly your s, Philip A. Crane, Jr.

Enclosures cc (w/enc.): Hr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Comission Washington, D.C. 20555 cc (w/o enc.): Hr. F. J. Hiraglia, Jr.

Licensing Branch No. 3 Division of Licensing U. S. Nuclear Regulatory Comission Washington, D. C. 20555 cc (w/enc.): Service List

'0 UPDATES TO DCPP IMPLEMENTING PROCEDURES Procedure Revisions Volume 3A OP-15, Pevision 4 OP-19, Revision 2 OP-20, Revision 2 OP-30, Revision 1 OP-32, Revision 1 OP-33, Revision 1 OP-39, Revision 1 OP-44, Revision 2 G-l, Revision 2 Volume 3B RB-7, Revision 1 RB-S, Revision 1 On-the-Spot Change Volume 3B RB-6, Add Table 3 Table oi'ontents Volume 3A Volume 3B