PAC IPIC CvA.S A.ND ZLZC TB.ZC C'O2ZPA KT'(p
~
~
P. O. BOX 7442
~
77 BEALE STREET. 31ST FLOOR, SAN FRANCISCO. CALIFORNIA94106 TELEPHONE 1415) 781-4211 TELECOPIER (415) 540)7813 March 2, 1982 Mr. R.
H. Engelken, Regional Administrator Office of Inspection and Enforcement Region V
U. S. Nuclear Regulatory Commission 1450 Maria Lane,, Suite 210 Walnut Creek, CA 94596 Re:
Docket No. 50-275 Docket No. 50-323 License No. DPR-76 Diablo Canyon Units 1 and 2
Dear Mr. Engelken:
Iy RQQ p>> 7/gal gP g~ >98<m,
~g(~+%(ggf In: accordance with Section V, "Implementing Procedures" of 10 CFR 50, Appendix E, we are submitting three copies of each of the updates to the detailed Implementing, Procedures for the Diablo Canyon Power Plant Units 1
and 2 Emergency-Plan as, listed on the attached..
Concurrently, ten copies of each update are being submitted; to Mr. Harold R. Denton, Director of Nuclear Reactor Regulation.
within 'Procedure RB-8, Revision 1, there is proprietary information.
This occurs on page 3 of 39 and has been bracketed. in accordance with NRC Generic Letter No. 81-27.
8203iiOi52.820305 PDR ADOCK'5000275 F...'.
'<<PDR...,~
'I
T
(,,i
.4
Mr. R.
H. Engelken, March 2, 1982 Kin41y acknowledge receipt of the above material on the enclosed copy of'this letter and return it to me in the enclosed addressed envelope.
'L Very truly yours, Philip A. Crane, Jr.
Enclosures cc (w/enc.):
cc, (w/o enc.):
cc (w/enc.):
Mr.- Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mashington,, D.C.,
20555 Mr. F.
J Miraglia, Jr.
Licensi.ng Branch No.
3 Division of Licensing U.. S'.. Nuclear Regulatory Coaeission Mashington, D. C. 20555 Service List
,r
UPDATES TO DCPP IMPLEMENTING PROCEDURES Procedure Revisions Volume 3A OP-15, OP-19, OP-20, OP-30, OP-32, OP-33, OP-39,.
OP-44, G-l, Revision 4 Revision 2
Revision 2
Revision 1
Revision 1
Revision 1
Revision 1
Revision 2
Revision 2
Volume 3B RB-7',, Revision 1
RB-8, Revision 1
On-the-Spot Change Volume 38 RB-6, Add Table-3 Table of Contents Volume 3A Volume 3B
0 WA.CIP'XW C"A.K MM'Z) MIMC~~rC Qc>M~~
P 0 BOX 7442
~
77 SEALE STREET~ 31ST FLOORS SAN FRANCISCO'ALIFORNIA94195 TELEPHONE (415) 781-4211 TELECOPIER (415) 5~7813 March 2, 1982 Mr. R.
H. Engelken, Regional Administrator Office of Inspection and Enforcement Region V
U. S. Nuclear Regulatory Commission 1450 ffaria Lane, Suite 210 Walnut Creek, CA 94596 Re:
Docket No. 50-275 Docket No. 50-323 License No.
DPR-76 Diablo Canyon Units 1
and 2
Dear Mr. Engelken:
FI~-.Pr-)yrg MaR 08 1987.t 6
HC Jg In accordance with Section V, "Implementing Procedures".
of 10 CFR 50, Appendix E, we are submitting three copies of each of the updates to the detailed Implementing procedures for the Diablo Canyon power plant Units 1
and 2 Emergency Plan as listed on the attached.
Concurrently, ten copies of each update are being submitted to Mr. Harold R. Denton, Director of Nuclear Reactor Regulation.
Within Procedure RB-8, Revision 1, there is proprietary information.
This occurs on page 3 of 39 and has been bracketed in accordance with NRC Generic Letter No. 81-27.
~o t ~C'gq)) p )
~ I'l.%
f '~
~
+e
.sf Q ~4'C4:rl V'L '0 g.g
~
Hr. R.
H. Engelken, March 2, 1982 Kindly acknowledge receipt of the above material on the enclosed copy of'this letter and return it to ne in the enclosed addressed envelope.
Yery truly your s, Philip A. Crane, Jr.
Enclosures cc (w/enc.):
cc (w/o enc.):
cc (w/enc.):
Hr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Comission Washington, D.C.
20555 Hr. F. J. Hiraglia, Jr.
Licensing Branch No.
3 Division of Licensing U. S. Nuclear Regulatory Comission Washington, D. C.
20555 Service List
'0
UPDATES TO DCPP IMPLEMENTING PROCEDURES Procedure Revisions Volume 3A OP-15, OP-19, OP-20, OP-30, OP-32, OP-33, OP-39, OP-44, G-l, Pevision 4
Revision 2
Revision 2
Revision 1
Revision 1
Revision 1
Revision 1
Revision 2
Revision 2
Volume 3B RB-7, Revision 1
RB-S, Revision 1
On-the-Spot Change Volume 3B RB-6, Add Table 3
Table oi'ontents Volume 3A Volume 3B