ML041680382

From kanterella
Revision as of 12:59, 17 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
May 2004 Monthly Operating Report for Palisades Nuclear Plant
ML041680382
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/09/2004
From: Domonique Malone
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML041680382 (3)


Text

-

CommNfttedof r Palisades Nuclear Plant Operated by Nuclear Management Company, LLC June 9, 2004 Technical Specification 5.6.4 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Monthly Operating Report In accordance with Technical Specification 5.6.4, attached is the Monthly Operating Report for May 2004, for the Palisades Nuclear Plant.

Summary of Commitments This let contains no new commitments and no revisions to existing commitments.

Daniel J. Malone Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC Enclosure (1)

CC Administrator, Region IlIl, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC LBrandon, Michigan Department of Environmental Quality RJAben, Michigan Department of Labor RDWhale, Michigan Public Service Commission Records Center, INPO TLShillair, P-26-305 27780 Blue Star Memorial Highway

  • Covert, Michigan 49043-9530 Telephone: 269.764.2000

ENCLOSURE OPERATING DATA REPORT DOCKET NO: 50-255 DATE: 06-01-04 COMPLETED BY: SFPierce TELEPHONE (269) 764-2239 NOTES:

Operating Data:

UNIT NAME Palisades REPORTING PERIOD: May 2004

1. DESIGN ELECTRICAL RATING (NET Mwe) 805
2. MAXIMUM DEPENDABLE CAPACITY (NET Mwe) - 730 This Month Yr-to-Date Cumulative
3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3647.0 181118.5
4. HOURS GENERATOR ON-LINE 744.0 3647.0 175540.8
5. UNIT RESERVE SHUTDOWN HOURS 0 0 0
6. NET ELECTRICAL ENERGY GENERATED (MWH) 583466 2883113 121104453

' Based on condenser backpressure Page 1 of 2

ENCLOSURE OPERATING DATA REPORT REPORT MONTH May 2004 DOCKET NO. 50-255 UNIT NAME -Palisades DATE(Mo/Da/Yr) _ 06/01104 COMPLETED BY- SFPierce TELEPHONE 269-764-2239 UNIT SHUTDOWNS No. Date Type Duration Reason' Method of Cause / Corrective 2

(YrMoDa) F: Forced (Hours) Shutting Down Actions Comments S: Scheduled NONE

1. Reason: 2. Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Other (Explain)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

The plant operated at essentially full power for the entire month.

Page 2 of 2