Request for Additional Information Security Plan Sections 1-9 (TAC Nos. MC2895 and MC2896)
ML041810224
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/24/2004
From: Brian Benney
NRC/NRR/DLPM/LPD2
To: Nunn D
Southern California Edison Co
Benney B, NRR/DLPM, 415-3764
References
TAC MC2895, TAC MC2896
Download: ML041810224 (5)


Text

SAFEGUARDS INFORMATION June 24, 2004 Mr. Dwight E. Nunn Vice President Southern California Edison Company P.O. Box 128 San Clemente, CA 92674-0128 c/o Mr. John Todd

SUBJECT:

SAN ONOFRE NUCLEAR STATION, UNITS 2 AND 3 - REQUEST FOR ADDITIONAL INFORMATION RE: SECURITY PLAN SECTIONS 1-9 (TAC NOS. MC2895 AND MC2896)

Dear Mr. Nunn:

In response to the April 29, 2003, Orders revising the design basis threat, you submitted revised physical security plans, safeguards contingency plans, and guard training and qualification plans, including an implementation schedule, for San Onofre Nuclear Station, Units 2 and 3.

The Nuclear Regulatory Commission staff is reviewing your submission and has determined that a request for additional information (RAI) is necessary in order to complete its evaluation based on its review of Sections 1 through 9 of your physical security plan. Please respond to the enclosed RAI within 10 days from the date of this letter. If circumstances result in the need to revise the target response date, please contact me at (301) 415-3498.

Sincerely,

/RA/

Brian Benney, Project Manager Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-361 and 50-362

Enclosure:

As stated cc w/o encl: See next page WARNING: Violation of Section 147 of the Atomic Energy Act, NOTICE: The enclosed information contains Safeguards Safeguards Information is subject to Information. Upon separation from the enclosure, this Civil and Criminal Penalties letter is DECONTROLLED.

SAFEGUARDS INFORMATION

June 24, 2004 Mr. Gregg R. Overbeck Senior Vice President Arizona Public Service Company P.O. Box 52034 Pheonix, AZ 85072-2034

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -

REQUEST FOR ADDITIONAL INFORMATION RE: SECURITY PLAN SECTIONS 1-9 (TAC NOS. MC2895 AND MC2896)

Dear Mr. Overbeck:

In response to the April 29, 2003, Orders revising the design basis threat, you submitted revised physical security plans, safeguards contingency plans, and guard training and qualification plans, including an implementation schedule, for Palo Verde Nuclear Generating Station, Units 1, 2, and 3.

The Nuclear Regulatory Commission staff is reviewing your submission and has determined that a request for additional information (RAI) is necessary in order to complete its evaluation based on its review of Sections 1 through 9 of your physical security plan. Please respond to the enclosed RAI within 10 days from the date of this letter. If circumstances result in the need to revise the target response date, please contact me at (301) 415-3498.

Sincerely,

/RA/

Brian Benney, Project Manager Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-528, 50-529, and 50-530

Enclosure:

As stated cc w/o encl: See next page DISTRIBUTION: PUBLIC SPRT R/F OGC ACRS ADAMS Accession Number: ML041810224 C:\ORPCheckout\FileNET\ML041810224.wpd OFFICE SPRT/NRR/PM SPRT/NSIR SPRT/NRR/SC NAME JPeralta JNakoski DATE 06/24/04 06/24/04 06/24/04 OFFICIAL RECORD COPY

San Onofre Nuclear Generating Station, Units 2 and 3 cc:

Mr. Raymond Waldo, Plant Manager Nuclear Generation Mr. Ed Bailey, Chief Southern California Edison Company Radiologic Health Branch San Onofre Nuclear Generating Station State Department of Health Services P. O. Box 128 Post Office Box 997414 (MS7610)

San Clemente, CA 92674-0128 Sacramento, CA 95899-7414 Mr. Douglas K. Porter Resident Inspector/San Onofre NPS Southern California Edison Company c/o U.S. Nuclear Regulatory Commission 2244 Walnut Grove Avenue Post Office Box 4329 Rosemead, CA 91770 San Clemente, CA 92674 Mr. David Spath, Chief Mayor Division of Drinking Water and City of San Clemente Environmental Management 100 Avenida Presidio P. O. Box 942732 San Clemente, CA 92672 Sacramento, CA 94234-7320 Mr. Dwight E. Nunn, Vice President Chairman, Board of Supervisors Southern California Edison Company County of San Diego San Onofre Nuclear Generating Station 1600 Pacific Highway, Room 335 P.O. Box 128 San Diego, CA 92101 San Clemente, CA 92674-0128 Eileen M. Teichert, Esq. Mr. James D. Boyd, Commissioner Supervising Deputy City Attorney California Energy Commission City of Riverside 1516 Ninth Street (MS 31) 3900 Main Street Sacramento, CA 95814 Riverside, CA 92522 Mr. Joseph J. Wambold, Vice President Mr. Gary L. Nolff Southern California Edison Company Power Projects/Contracts Manager San Onofre Nuclear Generating Station Riverside Public Utilities P.O. Box 128 2911 Adams Street San Clemente, CA 92764-0128 Riverside, CA 92504 Mr. Steve Hsu Regional Administrator, Region IV Department of Health Services U.S. Nuclear Regulatory Commission Radiologic Health Branch 611 Ryan Plaza Drive, Suite 400 MS 7610, P.O. Box 997414 Arlington, TX 76011-8064 Sacramento, CA 95899 Mr. Michael Olson Mr. Harold B. Ray San Diego Gas & Electric Company Executive Vice President P.O. Box 1831 Southern California Edison Company San Diego, CA 92112-4150 San Onofre Nuclear Generating Station P.O. Box 128, Mail Stop: D-3-F San Clemente, CA 92674-0128 December 2003