Text

SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION WARNING: Violation of Section 147 of the Atomic Energy Act, Safeguards Information is subject to Civil and Criminal Penalties June 24, 2004 Mr. Dwight E. Nunn Vice President Southern California Edison Company P.O. Box 128 San Clemente, CA 92674-0128 c/o Mr. John Todd

SUBJECT:

SAN ONOFRE NUCLEAR STATION, UNITS 2 AND 3 - REQUEST FOR ADDITIONAL INFORMATION RE: SECURITY PLAN SECTIONS 1-9 (TAC NOS. MC2895 AND MC2896)

Dear Mr. Nunn:

In response to the April 29, 2003, Orders revising the design basis threat, you submitted revised physical security plans, safeguards contingency plans, and guard training and qualification plans, including an implementation schedule, for San Onofre Nuclear Station, Units 2 and 3.

The Nuclear Regulatory Commission staff is reviewing your submission and has determined that a request for additional information (RAI) is necessary in order to complete its evaluation based on its review of Sections 1 through 9 of your physical security plan. Please respond to the enclosed RAI within 10 days from the date of this letter. If circumstances result in the need to revise the target response date, please contact me at (301) 415-3498.

Sincerely,

/RA/

Brian Benney, Project Manager Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-361 and 50-362

Enclosure:

As stated cc w/o encl: See next page NOTICE: The enclosed information contains Safeguards Information. Upon separation from the enclosure, this letter is DECONTROLLED.

June 24, 2004 Mr. Gregg R. Overbeck Senior Vice President Arizona Public Service Company P.O. Box 52034 Pheonix, AZ 85072-2034

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -

REQUEST FOR ADDITIONAL INFORMATION RE: SECURITY PLAN SECTIONS 1-9 (TAC NOS. MC2895 AND MC2896)

Dear Mr. Overbeck:

In response to the April 29, 2003, Orders revising the design basis threat, you submitted revised physical security plans, safeguards contingency plans, and guard training and qualification plans, including an implementation schedule, for Palo Verde Nuclear Generating Station, Units 1, 2, and 3.

The Nuclear Regulatory Commission staff is reviewing your submission and has determined that a request for additional information (RAI) is necessary in order to complete its evaluation based on its review of Sections 1 through 9 of your physical security plan. Please respond to the enclosed RAI within 10 days from the date of this letter. If circumstances result in the need to revise the target response date, please contact me at (301) 415-3498.

Sincerely,

/RA/

Brian Benney, Project Manager Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-528, 50-529, and 50-530

Enclosure:

As stated cc w/o encl: See next page DISTRIBUTION:

PUBLIC SPRT R/F OGC ACRS ADAMS Accession Number: ML041810224 C:\\ORPCheckout\\FileNET\\ML041810224.wpd OFFICE SPRT/NRR/PM SPRT/NSIR SPRT/NRR/SC NAME JPeralta JNakoski DATE 06/24/04 06/24/04 06/24/04 OFFICIAL RECORD COPY

December 2003 San Onofre Nuclear Generating Station, Units 2 and 3 cc:

Mr. Raymond Waldo, Plant Manager Nuclear Generation Southern California Edison Company San Onofre Nuclear Generating Station P. O. Box 128 San Clemente, CA 92674-0128 Mr. Douglas K. Porter Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, CA 91770 Mr. David Spath, Chief Division of Drinking Water and Environmental Management P. O. Box 942732 Sacramento, CA 94234-7320 Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, CA 92101 Eileen M. Teichert, Esq.

Supervising Deputy City Attorney City of Riverside 3900 Main Street Riverside, CA 92522 Mr. Gary L. Nolff Power Projects/Contracts Manager Riverside Public Utilities 2911 Adams Street Riverside, CA 92504 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Mr. Michael Olson San Diego Gas & Electric Company P.O. Box 1831 San Diego, CA 92112-4150 Mr. Ed Bailey, Chief Radiologic Health Branch State Department of Health Services Post Office Box 997414 (MS7610)

Sacramento, CA 95899-7414 Resident Inspector/San Onofre NPS c/o U.S. Nuclear Regulatory Commission Post Office Box 4329 San Clemente, CA 92674 Mayor City of San Clemente 100 Avenida Presidio San Clemente, CA 92672 Mr. Dwight E. Nunn, Vice President Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 Mr. James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 31)

Sacramento, CA 95814 Mr. Joseph J. Wambold, Vice President Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92764-0128 Mr. Steve Hsu Department of Health Services Radiologic Health Branch MS 7610, P.O. Box 997414 Sacramento, CA 95899 Mr. Harold B. Ray Executive Vice President Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128, Mail Stop: D-3-F San Clemente, CA 92674-0128