MONTHYEARML1002102002010-01-14014 January 2010 Submittal of Amendment Applications 258 and 244, Technical Specifications Applicable to Movement of Fuel Assemblies Project stage: Other ML1009704892010-04-0707 April 2010 Acceptance Review E-mail, License Amendment Request, Revise Technical Specification Limiting Conditions for Operation Applicable to Movement of Fuel Assemblies (TACs ME3136 and ME3137) Project stage: Acceptance Review ML1022404532010-08-11011 August 2010 Draft Request for Additional Information LAR on Fuel Assembly Movement Project stage: Draft RAI ML1102803802011-01-27027 January 2011 Withdrawal of Amendment Applications 258 and 244 Proposed Change Number (PCN) 593 Technical Specifications Applicable to Movement of Fuel Assemblies Project stage: Withdrawal ML1102802442011-01-31031 January 2011 Letter, Withdrawal of License Amendment Request to Revise Technical Specification Limiting Conditions for Operation Applicable to Movement of Fuel Assemblies Project stage: Withdrawal ML1102802462011-01-31031 January 2011 Withdrawal of License Amendment Request to Revise Technical Specification Limiting Conditions for Operation Applicable to Movement of Fuel Assemblies Project stage: Withdrawal 2010-08-11
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML21117A3492021-03-30030 March 2021 March 30, 2021, Email from Public Watchdogs on Providing New Information to Its October 13, 2020, 2.206 Petition ML21068A2722021-03-0909 March 2021 SONGS Endangered Species Act Additional Information Request ML20343A1292020-12-0808 December 2020 NRR E-mail Capture - Request for Additional Information ML18193A2002018-07-19019 July 2018 SONGS ISFSI Only Dqap RAI ML15083A4552015-03-27027 March 2015 and Independent Spent Fuel Storage Installation - Request for Additional Information Decommissioning Quality Assurance Program Review ML15071A1842015-03-19019 March 2015 Independent Spent Fuel Storage Installation - Request for Additional Information Regarding the 10 CFR 50.54(p) Changes to the Security Plans ML15042A3942015-01-23023 January 2015 NRR E-mail Capture - SONGS - Draft RAI Permanently Defueled Technical Specifications License Amendment Request ML15033A0522014-12-11011 December 2014 NRR E-mail Capture - SONGS - Draft RAI Permanently Defueled Technical Specifications License Amendment Request ML14248A5902014-09-18018 September 2014 Independent Spent Fuel Storage Installation - Request for Additional Information, Amendment Request to Revise Emergency Plan to Support Permanently Defueled Condition ML14248A5602014-09-18018 September 2014 Independent Spent Fuel Storage Installation - Request for Additional Information, Amendment Request to Revise Emergency Action Level Scheme to Support Permanently Defueled Condition ML14258A0172014-09-11011 September 2014 NRR E-mail Capture - SONGS - Revised Draft RAI Concerning TS Section 5 Administrative Controls License Amendment Request (TACs MF2954 and MF2955) ML14209A0052014-08-27027 August 2014 Request for Additional Information, Exemption Request from 10 CFR 50.47 and 10 CFR Part 50 Appendix E, Discontinue Offsite Emergency Planning Activities and Reduce Scope of Onsite Emergency Planning (TAC MF3835-MF3837) ML14139A4782014-06-0505 June 2014 Request for Additional Information, License Amendment Request to Revise Technical Specifications 5.1, 5.2, and 5.3 to Reflect Reduced Staffing/Training in Permanently Shutdown and Defueled Condition ML14093A6772014-05-0101 May 2014 SONGS - Request for Additional Information Concerning Pre-Emption Authority ML13352A0912013-12-30030 December 2013 Decommissioning Funding Status Report - Request for Additional Information ML13191A8372013-09-12012 September 2013 Request for Additional Information, Review of Decommissioning Funding Status Report ML13154A4312013-06-0404 June 2013 Rai'S Following Ifib Analysis of Edison'S 2013 Decommissioning Funding Status Report for San Onofre Units 2 and 3 ML13113A2562013-05-10010 May 2013 Request for Additional Information No. 73 Regarding Response to Confirmatory Action Letter ML13072A0542013-03-18018 March 2013 Redacted, Request for Additional Information, Nos. 33-67, Southern California Edison'S Response to Nrc'S Confirmatory Action Letter ML13074A6872013-03-15015 March 2013 Email, Draft Request for Additional Information, Nos. 68-72, Southern California Edison'S Response to Nrc'S Confirmatory Action Letter ML13053A1842013-02-21021 February 2013 Draft Request for Additional Information, Nos. 53-67, Southern California Edison'S Response to Nrc'S Confirmatory Action Letter ML13056A0922013-02-20020 February 2013 Email, Draft Request for Additional Information Nos. 38-52, Southern California Edison'S Response to Nrc'S Confirmatory Action Letter ML13053A3672013-02-0101 February 2013 E-mail, Draft Request for Additional Information Southern California Edison'S Response to Nrc'S Confirmatory Action Letter ML12356A1982012-12-20020 December 2012 Email, Request for Additional Information, Round 3, Review of Southern California Edison'S Response to Nrc'S 3/27/2012 Confirmatory Action Letter (CAL) 4-12-001 and Return to Service Report ML12345A4272012-12-10010 December 2012 Revised Email, Request for Additional Information Review of Southern California Edison'S Response to Nrc'S 3/27/2012 Confirmatory Action Letter (CAL) 4-12-001 and Return to Service Report ML12338A1102012-11-30030 November 2012 Email, Request for Additional Information Southern California Edison'S Response to Nrc'S Confirmatory Action Letter (CAL) 4-12-001 Dated March 27, 2012 ML12313A4752012-11-0808 November 2012 Request for Additional Information Email, Relief Request IST-4-P-2, ASME OM Code Requirements for Testing CSS and LPSI Pumps, Fourth 10-Year Inservice Inspection Interval ML12297A3972012-10-23023 October 2012 Request for Additional Information Email, Relief Request ISI-3-36, Reactor Coolant Pressure Boundary Testing, Third 10-Year Inservice Inspection Interval ML12283A2302012-10-0909 October 2012 Request for Additional Information Email, Round 3 W/Corrected Due Date, Request to Revise Technical Specification (TS) 2.1.1.2, TS 4.2.1, and TS 5.7.1.5, to Support Unrestricted Use of Areva Fuel ML12283A2252012-10-0909 October 2012 Request for Additional Information Email, Round 3, Request to Revise Technical Specification (TS) 2.1.1.2, TS 4.2.1, and TS 5.7.1.5, to Support Unrestricted Use of Areva Fuel ML12220A0492012-08-0707 August 2012 Request for Additional Information Email, Round 2, License Amendment Request to Revise Technical Specification (TS) 2.1.1.2, TS 4.2.1, and TS 5.7.1.5, to Support Unrestricted Use of Areva Fuel ML12207A2612012-08-0101 August 2012 Redacted, Request for Additional Information, License Amendment Request to Revise Technical Specification (TS) 2.1.1.2, TS 4.2.1, and TS 5.7.1.5, to Support Unrestricted Use of Areva Fuel ML12201A1552012-07-19019 July 2012 R. Onge Ltr Request for Additional Information Decommissioning Funding ML12056A0502012-03-12012 March 2012 Enclosure 4 - Recommendation 2.3: Flooding ML12056A0512012-03-12012 March 2012 Enclosure 5 - Recommendation 9.3: Emergency Preparedness ML12056A0482012-03-12012 March 2012 Enclosure 2 - Recommendation 2.1: Flooding ML12056A0472012-03-12012 March 2012 Enclosure 1 - Recommendation 2.1: Seismic ML12056A0492012-03-12012 March 2012 Enclosure 3 - Recommendation 2.3: Seismic ML1200603242012-01-19019 January 2012 Fleet, RAI, Proposed Alternative to Use American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-789 (N-789) ML1126604602011-10-14014 October 2011 Request for Additional Information Regarding Use of American Concrete Institute Reports for Restoration of Unit 3 Containment ML11182C0322011-06-30030 June 2011 Notification of Inspection (Inspection Report 05000361; 05000362/2011004) and Request for Information ML1113003952011-05-10010 May 2011 Email, Draft Request for Additional Information, Review of Biennial Decommissioning Funding Status Report ML1113004002011-05-10010 May 2011 Draft Request for Additional Information, Review of Biennial Decommissioning Funding Status Report ML1112307842011-05-0303 May 2011 Draft Request for Additional Information, Relief Requests ISI-3-32 Through ISI-3-34, Alternative to Requirements for Examinations of Welds and Core Support Structure Surfaces, Third 10-Year Inservice Inspection ML1106006612011-03-0101 March 2011 Draft Generic Request for Additional Information, License Amendment Request to Revise License Condition and Approve Cyber Security Plan ML1024301262010-08-31031 August 2010 Request for Additional Information Relief Request ISI-3-31 ML1022404532010-08-11011 August 2010 Draft Request for Additional Information LAR on Fuel Assembly Movement ML0933601212009-12-0202 December 2009 Request for Additional Information Relief Request ISI-3-30 ML0831705532008-12-0808 December 2008 Request for Additional Information, License Amendment Request to Support Replacement Steam Generators ML0831901202008-11-26026 November 2008 Request for Additional Information Test Protocol Used in the Testing at Vuez 2021-03-09
[Table view] |
Text
DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING MOVEMENT OF FUEL ASSEMBLIES TECHNICAL SPECIFICATION CHANGE SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 (TAC NOS. ME3136 and ME3137)
The Nuclear Regulatory Commission (NRC) staff has determined that additional information is needed to complete its review of the subject license amendment request (LAR) for San Onofre Nuclear Generating Station (SONGS), Units 2 and 3, sent by application dated January 14, 2010, (ML100210200) from Southern California Edison (SCE or the licensee). The following question constitutes our request for additional information.
- 1. In Section 3.2, Discussion of the LAR the licensee states, A new analysis, "Updated SONGS 2 & 3 Fuel Assembly Drop Analysis of Record" (AOR) (Reference 2) was performed and has subsequently replaced the Fuel Bundle Drop Fuel Rod Failure Evaluation for SCE Units 2 & 3 (Reference 1).
For fuel bundle drop scenarios in the fuel storage pool and core locations, the results of the updated analysis demonstrate that the maximum total number of fuel rods predicted to fail in the dropped and impacted fuel bundles is a total of 472 rods (this represents all fuel rods in both assemblies).
The control room and offsite dose consequences of 472 rods being failed were evaluated and determined to meet the 10 CFR 50.59 minimal dose increase criterion as defined in Regulatory Guide 1.187.
Based on the above statement, the licensee currently has a new fuel assembly drop analysis of record (AOR) that uses heavier bundle weights, and includes the weights of components, handling grapples, and a discretionary margin of 50 pounds, which have not been accounted for in previous fuel assembly drop analyses.
Although the new AOR was performed in accordance with Title 10 of the Code of Federal Regulation (10 CFR) 50.59, the evaluation provides the basis supporting the proposed technical specification changes. As such, the NRC staff cannot adequately evaluate the impact of the proposed changes without conducting a review of the analysis and results. Therefore, please submit the applicable new AOR and/or the corresponding 10 CFR 50.59 evaluation, in order for NRC staff to evaluate the impact of the changes on the control room and offsite doses associated with the fuel handling accident.
If providing the new AOR, please explain how the change impacts the frequency of occurrence of the fuel handling accident previously evaluated. Also, please explain how the change impacts the fuel handling accident previously evaluated.
Enclosure