Letter Sequence Draft RAI |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement
|
MONTHYEARML12118A1392012-04-20020 April 2012 Units 2 & 3 Components, Portions Outside of Scope Project stage: Request ML12285A2672012-10-0101 October 2012 Attachment 4: SG Tube Wear Analysis for Unit-2/3 Project stage: Request ML12285A2652012-10-0101 October 2012 Attachment 4 - MHI Document L5-04GA564 - Tube Wear of Unit-3 RSG, Technical Evaluation Report Project stage: Request ML12285A2662012-10-0101 October 2012 Attachment 4: Appendix-2 Attachment-1, Tube-to-TSP Wear Depth Diagram for Unit-2/3 Project stage: Request ML12285A2642012-10-0101 October 2012 Attachment 3 - Areva Document 51-9180143-001 - SONGS Unit 3 February 2012 Leaker Outage Steam Generator Condition Monitoring Report Project stage: Request ML12285A2682012-10-0202 October 2012 Attachment 6 - Appendix B: SONGS U2C17 - Steam Generator Operational Assessment for Tube-to-Tube Wear Project stage: Request ML12285A2692012-10-0202 October 2012 Attachment 6: Appendix a: Estimates of FEI-Induced Ttw Rates Project stage: Request ML12285A2632012-10-0303 October 2012 Confirmatory Action Letter - Actions to Address Steam Generator Tube Degradation Project stage: Request ML12335A2972012-11-28028 November 2012 LTR-12-0728 - Ltr. Ricardo Nicol Concerns Restart of San Onofre Nuclear Generating Station Project stage: Request ML12338A1102012-11-30030 November 2012 Email, Request for Additional Information Southern California Edisons Response to NRCs Confirmatory Action Letter (CAL) 4-12-001 Dated March 27, 2012 Project stage: RAI ML12341A1122012-12-0707 December 2012 Notice of Meeting with Southern California Edison to Discuss Its Response to NRCs Confirmatory Action Letter and Return to Service Report for San Onofre Nuclear Generating Station, Unit 2 Project stage: Meeting ML12347A0662012-12-0707 December 2012 Revised Notice of 12/18/12 Meeting with Southern California Edison to Discuss Its Response to NRCs Confirmatory Action Letter and Return to Service Report for San Onofre Nuclear Generating Station, Unit 2 Project stage: Meeting ML12345A4272012-12-10010 December 2012 Revised Email, Request for Additional Information Review of Southern California Edisons Response to NRCs 3/27/2012 Confirmatory Action Letter (CAL) 4-12-001 and Return to Service Report Project stage: RAI ML12353A0972012-12-13013 December 2012 LTR-12-0795 - E-mail Don Leichtling Concerns Media Alert - Nuclear News - NRR Forthcoming Meeting with Southern California Edison Company Project stage: Meeting ML12352A3852012-12-18018 December 2012 Licensee Slides for 12/18/12 Public Meeting Project stage: Meeting ML12352A4112012-12-18018 December 2012 NRC Slides for 12/18/12 Meeting with Southern California Edison Project stage: Meeting ML12356A1982012-12-20020 December 2012 Email, Request for Additional Information, Round 3, Review of Southern California Edisons Response to NRCs 3/27/2012 Confirmatory Action Letter (CAL) 4-12-001 and Return to Service Report Project stage: RAI ML12361A0652012-12-26026 December 2012 Request for Additional Information Regarding Response to Confirmatory Action Letter Project stage: RAI ML13009A3492013-01-0808 January 2013 Response to Request for Additional Information Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13014A2492013-01-0909 January 2013 Response to Request for Additional Information (RAI 15) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13014A2512013-01-0909 January 2013 Response to Request for Additional Information (RAI 30) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13015A0042013-01-10010 January 2013 Response to Request for Additional Information (RAI 16), Regarding Confirmatory Action Letter Response (TAC No. Me 9727) Project stage: Response to RAI ML13022A0882013-01-16016 January 2013 Response to Request for Additional Information (RAI 19) Regarding Confirmatory Action Letter Response (TAC No. Me 9727) Project stage: Response to RAI ML13022A4132013-01-17017 January 2013 Response to Request for Additional Information (RAIs 10 and 17) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13022A4812013-01-18018 January 2013 Response to Request for Additional Information (RAI 13), Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13022A4082013-01-18018 January 2013 Response to Request for Additional Information (RAI 12), Regarding Confirmatory Action Letter Response (TAC No. Me 9727) Project stage: Response to RAI ML13018A4452013-01-18018 January 2013 Natural Resources Defense Councils Amicus Response in Support of Friends of the Earth Opening Brief Project stage: Request ML13022A4052013-01-21021 January 2013 Response to Request for Additional Information (RAI 28), Regarding Confirmatory Action Letter Response (TAC No. Me 9727) Project stage: Response to RAI ML13022A4112013-01-21021 January 2013 Response to Request for Additional Information (RAI 11) Regarding Confirmatory Action Letter Response (TAC Me 9727) Project stage: Response to RAI ML13028A0982013-01-24024 January 2013 Response to Request for Additional Information (RAI 18) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13028A4742013-01-25025 January 2013 Response to Request for Additional Information (RAIs 5, 7, and 9) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13028A4752013-01-25025 January 2013 Response to Request for Additional Information (RAI 27) Regarding Confirmatory Action Letter Project stage: Response to RAI ML13032A0092013-01-29029 January 2013 Response to Request for Additional Information (RAI 14) Regarding Confirmatory Action Letter Response (TAC No. Me 9727) Project stage: Response to RAI ML13037A1122013-01-31031 January 2013 Response to Request for Additional Information (RAI 29) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13053A3672013-02-0101 February 2013 E-mail, Draft Request for Additional Information Southern California Edisons Response to NRCs Confirmatory Action Letter Project stage: Draft RAI ML13038A0102013-02-0404 February 2013 Response to Request for Additional Information (RAI 8) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13038A0092013-02-0404 February 2013 Response to Request for Additional Information (RAI 6) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13039A2782013-02-0606 February 2013 Response to Request for Additional Information (RAIs 20, 21, 22, 23, 24, 26 & 31), Confirmatory Action Letter Project stage: Response to RAI ML13039A3172013-02-0707 February 2013 Response to Request for Additional Information (RAI 25) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13050A1892013-02-14014 February 2013 Supplemental Document Submittal Regarding Confirmatory Action Letter Response, Concerning Steam Generator Tubes Project stage: Supplement ML13051A1992013-02-15015 February 2013 Enclosure 6, LTR-SGDA-12-36, Rev. 3, Flow-Induced Vibration and Tube Wear Analysis of the San Onofre Nuclear Generating Station Unit 2 Replacement Steam Generators Supporting Restart. Page 228 of 415 Through End Project stage: Other ML13046A1232013-02-15015 February 2013 2/27/2013 Notice of Forthcoming Meeting with Southern California Edison Company to Discuss Confirmation Action Letter Project stage: Meeting ML13051A1972013-02-15015 February 2013 Enclosure 6, LTR-SGDA-12-36, Rev. 3, Flow-Induced Vibration and Tube Wear Analysis of the San Onofre Nuclear Generating Station Unit 2 Replacement Steam Generators Supporting Restart. Cover Through Page 227 of 415 Project stage: Other ML13051A1902013-02-18018 February 2013 Supplemental Document Submittal Regarding Confirmatory Action Letter Response to Address Steam Generator Tube Degradation Project stage: Supplement ML13051A1922013-02-18018 February 2013 Enclosure 4, L5-04GA567, Rev. 6, Evaluation of Stability Ratio for Return to Service Project stage: Other ML13051A1932013-02-18018 February 2013 Enclosure 5, L5-04GA585, Rev. 2, Analytical Evaluations for Operational Assessment Project stage: Other ML13056A0922013-02-20020 February 2013 Email, Draft Request for Additional Information Nos. 38-52, Southern California Edisons Response to NRCs Confirmatory Action Letter Project stage: Draft RAI ML13053A1842013-02-21021 February 2013 Draft Request for Additional Information, Nos. 53-67, Southern California Edisons Response to NRCs Confirmatory Action Letter Project stage: Draft RAI ML13053A1732013-02-21021 February 2013 Email, Draft Request for Additional Information, Nos. 53-67, Southern California Edisons Response to NRCs Confirmatory Action Letter Project stage: Draft RAI ML13056A6012013-02-25025 February 2013 Response to Request for Additional Information (RAI 32) Regarding Confirmatory Action Letter Response Project stage: Response to RAI 2013-01-21
[Table View] |
Text
Hall, Randy From:
Hall, Randy Sent:
Friday, February 01, 20132:32 PM To:
'Ryan.Treadway@sce.com' Cc:
'joseph.bashore@sce.com'; 'John.Brabec@sce.com'; 'Mark.Morgan@sce.com';
'Lee.Kelly@sce.com'; Broaddus, Doug; Jackson, Christopher; Kulesa, Gloria; Elliott, Robert; Pelton, David; Paige, Jason; Murphy, Emmett; Karwoski, Kenneth; Thurston, Carl; Hoxie, Chris; Grover, Ravinder; Beaulieu, David; Parks, Benjamin; Clifford, Paul; Schulten, Carl; Lantz, Ryan; Werner, Greg; Taylor, Nick; Rahn, David; Thorp, John; Benney, Brian; Andersen, James fr\\
Subject:
- PROPRIETARY INFORMATIO~ Draft Request for Additional Information on SCE's Response to NRC's Confirmatory Action Letter for San Onofre Nuclear Generating Station Unit 2 (ME9727)
Attachments:
Prop RAls 33 to 37.docx February 1, 2013 Mr. Ryan Treadway Manager, Nuclear Regulatory Affairs San Onofre Nuclear Generating Station Southern California Edison Company Ryan:
By letter dated October 3, 2012, (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML122850320) Southern California Edison (SCE) submitted its response to the NRC Confirmatory Action Letter (CAL) dated March 27,2012, for San Onofre Nuclear Generating Station (SONGS),
Unit 2. In support of that response, SCE submitted proprietary versions of several reports by letter dated November 28,2012 (ADAMS Accession No. ML12348A287).
The CAL, as it relates to Unit 2, specifies in part that SCE will provide to NRC the results of your assessment of the replacement steam generator tube wear identified at SONGS, the actions taken to prevent loss of tube integrity in Unit 2, and the basis for SCE's conclusion that there is reasonable assurance that the unit can be operated safely. The CAL further stipulates that it will remain in effect until the NRC has reviewed SCE's response to the actions specified therein, including responses to staffs questions and the results of your evaluations; and the NRC staff communicates to SCE in writing that it has concluded that Unit 2 can be operated without undue risk to public health and safety, and the environment.
The NRC staff is continuing its detailed review of SCE's CAL response and supporting information for SONGS*
Unit 2 in order to reach a conclusion regarding the CAL actions and the proposed restart of Unit 2. The staff has determined that further additional information is needed in order to complete our evaluation. The NRC staff previously provided draft requests for additional information (RAls) regarding the CAL response to you on November 30, December 10 and December 20,2012 (ADAMS Accession Nos. ML12338A110, ML12345A427, and ML12356A198, respectively). The 32 questions in these draft RAls were formally sent to SCE by letter dated December 26,2012 (ADAMS Accession No. ML12361A065).
The staff's latest draft RAI is attached. Please note that the NRC staff has deSignated several of the attached questions as proprietary, based on the requests for withholding provided in your October 3, 2012, letter.
Please review NRC's designation of proprietary information in the attached RAI and provide any comments or revisions if you do not agree with our designation. We intend to issue a redacted, non-proprietary version of this RAI to be made publicly available, so we request that you provide any comments promptly.
1
The NRC staff may develop additional questions, which we will transmit to SCE as they become available.
Please provide an estimated date for your response to this draft RAI, and let me know if SCE would like additional clarification on any of these questions.
Sincerely, Randy Hall, Senior Project Manager San Onofre Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation USNRC (301) 415-4032 Randy. Hall@nrc.gov 2
Attachment to February 1, 2013, electronic mail from Randy Hall, USNRC, to Ryan Treadway, Southern California Edison OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR ADDITIONAL INFORMATION SOUTHERN CALIFORNIA EDISON SAN ONOFRE NUCLEAR GENERATING STATION, UNIT 2 RESPONSE TO MARCH 27, 2012, NRC CONFIRMATORY ACTION LETTER DOCKET NO. 50-361 TAC NO. ME9727 (Redacted)
Redacted information is identified by blank space enclosed within double brackets
PROPRI&TARY INFORMATION (f~
OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR ADDITIONAL INFORMATION SOUTHERN CALIFORNIA EDISON SAN ONOFRE NUCLEAR GENERATING STATION, UNIT 2 RESPONSE TO MARCH 27,2012, NRC CONFIRMATORY ACTION LETTER DOCKET NO. 50-361 TAC NO. ME9727 By letter dated October 3, 2012, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML122850320) Southern California Edison (SCE) submitted its response to the NRC Confirmatory Action Letter (CAL) dated March 27, 2012, for San Onofre Nuclear Generating Station (SONGS), Unit 2. By letter dated November 28, 2012 (ADAMS Accession No. ML12348A287), SCE submitted proprietary versions of several reports enclosed with the October 3,2012 CAL response.
The NRC staff is continuing its detailed review of SCE's CAL response for SONGS Unit 2 and has determined that additional information is needed in order to complete our evaluation. This draft request for additional information (RAI) addresses some of the proprietary information submitted by SCE on November 28, 2012, and will be withheld from public disclosure as marked, pending the NRC staff's final determination on SCE's request for withholding under 10 CFR 2.390.
The NRC transmitted previous RAI questions to SCE by letter dated December 26,2012 (ADAMS Accession No. ML12361A065). For continuity, the numbering scheme for these additional questions begins where the NRC's previous RAI questions ended.
- 33. Reference 1, Figure 5-5: ((
))
- 34. Reference 1, Section 6.4.2, page 60 of 129: ((
))
- 35. Reference 1, Section 7.3, page 98 of 129: The "upper bound contact forces" shown in Figure 7-2 are average values. Clarify whether these "average values" are averages of the upper bound contact forces for each tube in the bundle at each AVB. Why is it acceptable that the calculated upper bound contact force prevents motion for only 97.7 percent of the force spectrum from turbulence? Finally, why has only turbulence excitation been considered in the development of these upper bound contact forces?
- 36. Reference 1, Section 7.4, page 98 of 129: ((
PROPRI&TARY INFORMATION t~
PROPRIETARY INFORMATION r
- 2
))
- 37. Reference 1, Section 8.0, page 107 of 129, and Figure 8-3 indicate that Unit 2 can be operated for 8 months after BOC 17 before exceeding the 5% probability limit. What is the sensitivity of this estimate to a higher assumed value of median contact force for support effectiveness?
REFERENCES
- 1. Letter from Richard J. St. Onge, SCE, to Document Control Desk, USNRC, "Docket No.
50-361, Confirmatory Action Letter Response - Proprietary Documents, San Onofre Nuclear Generating Station, Unit 2," November 28, 2012. (ADAMS Accession No. ML12348A287); Enclosure 6, "SONGS U2C17 Steam Generator Operational Assessment for Tube-to-Tube Wear," prepared by Areva NP Inc., Document No. 51 9187230-000.
PROPRIETARY INFORMATION r