SAFEGUARDS INFORMATION June 25, 2004 Mr. Gregg R. Overbeck Senior Vice President Arizona Public Service Company P.O. Box 52034 Pheonix, AZ 85072-2034

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -

REQUEST FOR ADDITIONAL INFORMATION RE: SECURITY PLAN SECTIONS 1-9 (TAC NOS. MC2895 AND MC2896)

Dear Mr. Overbeck:

In response to the April 29, 2003, Orders revising the design basis threat, you submitted revised physical security plans, safeguards contingency plans, and guard training and qualification plans, including an implementation schedule, for Palo Verde Nuclear Generating Station, Units 1, 2, and 3.

The Nuclear Regulatory Commission staff is reviewing your submission and has determined that a request for additional information (RAI) is necessary in order to complete its evaluation based on its review of Sections 1 through 9 of your physical security plan. Please respond to the enclosed RAI within 10 days from the date of this letter. If circumstances result in the need to revise the target response date, please contact me at (301) 415-3498.

Sincerely,

/RA/

Brian Benney, Project Manager Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-528, 50-529, and 50-530

Enclosure:

As stated cc w/o encl: See next page WARNING: Violation of Section 147 of the Atomic Energy Act, NOTICE: The enclosed information contains Safeguards Safeguards Information is subject to Information. Upon separation from the enclosure, this Civil and Criminal Penalties letter is DECONTROLLED.

SAFEGUARDS INFORMATION

June 25, 2004 Mr. Gregg R. Overbeck Senior Vice President Arizona Public Service Company P.O. Box 52034 Pheonix, AZ 85072-2034

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -

REQUEST FOR ADDITIONAL INFORMATION RE: SECURITY PLAN SECTIONS 1-9 (TAC NOS. MC2895 AND MC2896)

Dear Mr. Overbeck:

In response to the April 29, 2003, Orders revising the design basis threat, you submitted revised physical security plans, safeguards contingency plans, and guard training and qualification plans, including an implementation schedule, for Palo Verde Nuclear Generating Station, Units 1, 2, and 3.

The Nuclear Regulatory Commission staff is reviewing your submission and has determined that a request for additional information (RAI) is necessary in order to complete its evaluation based on its review of Sections 1 through 9 of your physical security plan. Please respond to the enclosed RAI within 10 days from the date of this letter. If circumstances result in the need to revise the target response date, please contact me at (301) 415-3498.

Sincerely,

/RA/

Brian Benney, Project Manager Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-528, 50-529, and 50-530

Enclosure:

As stated cc w/o encl: See next page DISTRIBUTION: PUBLIC SPRT R/F OGC ACRS ADAMS Accession Number: ML041950437 C:\ORPCheckout\FileNET\ML041950437.wpd OFFICE SPRT/NRR/PM SPRT/NSIR SPRT/NRR/SC NAME BBenney JPeralta JNakoski DATE 6/24/04 6/24/04 6/24/04 OFFICIAL RECORD COPY

Palo Verde Generating Station, Units 1, 2, and 3 cc:

Mr. Steve Olea Ms. Cheryl Adams Arizona Corporation Commission Southern California Edison Company 1200 W. Washington Street 5000 Pacific Coast Hwy Bldg DIN Phoenix, AZ 85007 San Clemente, CA 92672 Douglas Kent Porter Mr. Robert Henry Senior Counsel Salt River Project Southern California Edison Company 6504 East Thomas Road Law Department, Generation Resources Scottsdale, AZ 85251 P.O. Box 800 Rosemead, CA 91770 Mr. Jeffrey T. Weikert Assistant General Counsel Senior Resident Inspector El Paso Electric Company U.S. Nuclear Regulatory Commission Mail Location 167 P. O. Box 40 123 W. Mills Buckeye, AZ 85326 El Paso, TX 79901 Regional Administrator, Region IV Mr. John Schumann U.S. Nuclear Regulatory Commission Los Angeles Department of Water & Power Harris Tower & Pavillion Southern California Public Power Authority 611 Ryan Plaza Drive, Suite 400 P.O. Box 51111, Room 1255-C Arlington, TX 76011-8064 Los Angeles, CA 90051-0100 Chairman Brian Almon Maricopa County Board of Supervisors Public Utility Commission 301 W. Jefferson, 10th Floor William B. Travis Building Phoenix, AZ 85003 P. O. Box 13326 1701 North Congress Avenue Mr. Aubrey V. Godwin, Director Austin, TX 78701-3326 Arizona Radiation Regulatory Agency 4814 South 40 Street David B. Raskin, Esq.

Phoenix, AZ 85040 Steptoe & Johnson LLP 1330 Connecticut Avenue, NW Mr. M. Dwayne Carnes, Director Washington, DC 20036 Regulatory Affairs/Nuclear Assurance Palo Verde Nuclear Generating Station Mr. Gregg R. Overbeck P.O. Box 52034 Senior Vice President, Nuclear Phoenix, AZ 85072-2034 Arizona Public Service Company P. O. Box 52034 Mr. Hector R. Puente Phoenix, AZ 85072-2034 Vice President, Power Generation El Paso Electric Company 310 E. Palm Lane, Suite 310 Phoenix, AZ 85004 Mr. John Taylor Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, NM 87107-4224 November 2003