MONTHYEARML0417400152004-06-21021 June 2004 Request for Additional Information Security Plan Sections 10-19 (Tacs Nos. MC2895 and MC2896) Project stage: RAI ML0419404322004-06-24024 June 2004 Request for Additional Information Security Plans Sections 1-9 Project stage: RAI ML0418102242004-06-24024 June 2004 Request for Additional Information Security Plan Sections 1-9 (TAC Nos. MC2895 and MC2896) Project stage: RAI ML0418102522004-06-24024 June 2004 Request for Additional Information Security Plan Section 1-9 Project stage: RAI ML0419504372004-06-25025 June 2004 Request for Additional Information Security Plan Sections 1-9 (TAC Nos. MC2895 and MC2896) Project stage: RAI ML0419504262004-07-0909 July 2004 Request for Additional Information Training and Qualification Plan Project stage: RAI ML0421100992004-07-23023 July 2004 RAI, Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan (TAC Nos. MC2895 and MC2896) Project stage: RAI ML0431200152004-10-28028 October 2004 Administrative Change to Facility Operating License in Conjunction with the Commission Order EA-03-086 Regarding Revised Design Basis Threat... Project stage: Other ML0520903282005-08-0101 August 2005 Corrections to Operating License Nos. DPR-071 and DPR-062 in Conjunction W/Commission Order EA-03-086 (Tac No. MC2895, MC2896) Project stage: Other 2004-06-25
[Table View] |
|
---|
Category:Letter
MONTHYEARML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23157A1292023-06-0101 June 2023 Annual Report of Guarantee of Payment of Deferred Premium ML23144A3722023-05-24024 May 2023 Response to Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23122A1912023-04-29029 April 2023 Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23089A4002023-03-30030 March 2023 Consolidated Decommissioning Funding Status Report - 2022 ML23088A4012023-03-30030 March 2023 Project Manager Assignment IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) ML23080A3002023-03-21021 March 2023 Present Levels of Financial Protection 2024-01-19
[Table view] |
Text
SAFEGUARDS INFORMATION June 25, 2004 Mr. Gregg R. Overbeck Senior Vice President Arizona Public Service Company P.O. Box 52034 Pheonix, AZ 85072-2034
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -
REQUEST FOR ADDITIONAL INFORMATION RE: SECURITY PLAN SECTIONS 1-9 (TAC NOS. MC2895 AND MC2896)
Dear Mr. Overbeck:
In response to the April 29, 2003, Orders revising the design basis threat, you submitted revised physical security plans, safeguards contingency plans, and guard training and qualification plans, including an implementation schedule, for Palo Verde Nuclear Generating Station, Units 1, 2, and 3.
The Nuclear Regulatory Commission staff is reviewing your submission and has determined that a request for additional information (RAI) is necessary in order to complete its evaluation based on its review of Sections 1 through 9 of your physical security plan. Please respond to the enclosed RAI within 10 days from the date of this letter. If circumstances result in the need to revise the target response date, please contact me at (301) 415-3498.
Sincerely,
/RA/
Brian Benney, Project Manager Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-528, 50-529, and 50-530
Enclosure:
As stated cc w/o encl: See next page WARNING: Violation of Section 147 of the Atomic Energy Act, NOTICE: The enclosed information contains Safeguards Safeguards Information is subject to Information. Upon separation from the enclosure, this Civil and Criminal Penalties letter is DECONTROLLED.
SAFEGUARDS INFORMATION
June 25, 2004 Mr. Gregg R. Overbeck Senior Vice President Arizona Public Service Company P.O. Box 52034 Pheonix, AZ 85072-2034
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -
REQUEST FOR ADDITIONAL INFORMATION RE: SECURITY PLAN SECTIONS 1-9 (TAC NOS. MC2895 AND MC2896)
Dear Mr. Overbeck:
In response to the April 29, 2003, Orders revising the design basis threat, you submitted revised physical security plans, safeguards contingency plans, and guard training and qualification plans, including an implementation schedule, for Palo Verde Nuclear Generating Station, Units 1, 2, and 3.
The Nuclear Regulatory Commission staff is reviewing your submission and has determined that a request for additional information (RAI) is necessary in order to complete its evaluation based on its review of Sections 1 through 9 of your physical security plan. Please respond to the enclosed RAI within 10 days from the date of this letter. If circumstances result in the need to revise the target response date, please contact me at (301) 415-3498.
Sincerely,
/RA/
Brian Benney, Project Manager Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-528, 50-529, and 50-530
Enclosure:
As stated cc w/o encl: See next page DISTRIBUTION: PUBLIC SPRT R/F OGC ACRS ADAMS Accession Number: ML041950437 C:\ORPCheckout\FileNET\ML041950437.wpd OFFICE SPRT/NRR/PM SPRT/NSIR SPRT/NRR/SC NAME BBenney JPeralta JNakoski DATE 6/24/04 6/24/04 6/24/04 OFFICIAL RECORD COPY
Palo Verde Generating Station, Units 1, 2, and 3 cc:
Mr. Steve Olea Ms. Cheryl Adams Arizona Corporation Commission Southern California Edison Company 1200 W. Washington Street 5000 Pacific Coast Hwy Bldg DIN Phoenix, AZ 85007 San Clemente, CA 92672 Douglas Kent Porter Mr. Robert Henry Senior Counsel Salt River Project Southern California Edison Company 6504 East Thomas Road Law Department, Generation Resources Scottsdale, AZ 85251 P.O. Box 800 Rosemead, CA 91770 Mr. Jeffrey T. Weikert Assistant General Counsel Senior Resident Inspector El Paso Electric Company U.S. Nuclear Regulatory Commission Mail Location 167 P. O. Box 40 123 W. Mills Buckeye, AZ 85326 El Paso, TX 79901 Regional Administrator, Region IV Mr. John Schumann U.S. Nuclear Regulatory Commission Los Angeles Department of Water & Power Harris Tower & Pavillion Southern California Public Power Authority 611 Ryan Plaza Drive, Suite 400 P.O. Box 51111, Room 1255-C Arlington, TX 76011-8064 Los Angeles, CA 90051-0100 Chairman Brian Almon Maricopa County Board of Supervisors Public Utility Commission 301 W. Jefferson, 10th Floor William B. Travis Building Phoenix, AZ 85003 P. O. Box 13326 1701 North Congress Avenue Mr. Aubrey V. Godwin, Director Austin, TX 78701-3326 Arizona Radiation Regulatory Agency 4814 South 40 Street David B. Raskin, Esq.
Phoenix, AZ 85040 Steptoe & Johnson LLP 1330 Connecticut Avenue, NW Mr. M. Dwayne Carnes, Director Washington, DC 20036 Regulatory Affairs/Nuclear Assurance Palo Verde Nuclear Generating Station Mr. Gregg R. Overbeck P.O. Box 52034 Senior Vice President, Nuclear Phoenix, AZ 85072-2034 Arizona Public Service Company P. O. Box 52034 Mr. Hector R. Puente Phoenix, AZ 85072-2034 Vice President, Power Generation El Paso Electric Company 310 E. Palm Lane, Suite 310 Phoenix, AZ 85004 Mr. John Taylor Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, NM 87107-4224 November 2003