MONTHYEARML20054E4971982-06-0404 June 1982 Forwards Addl Info Documenting Compliance w/NUREG-0737,Item II.E.1.2, Auxiliary Feedwater Sys Automatic Initiation & Flow Indication. Submittal Documents 820603 Conversation W/E Reeves Clarifying Util 820416 Ltr Project stage: Request ML20070M2031983-01-14014 January 1983 Nonproprietary Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SER (F-11 & B-60),JM Farley Nuclear Power Plant,Unit 1, Technical Evaluation Rept Project stage: Other 1982-06-04
[Table View] |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARL-99-035, Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld1999-10-18018 October 1999 Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld ML20217G0801999-10-0707 October 1999 Informs That on 990930,staff Conducted mid-cycle PPR of Farley & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Will Conduct Regional Insps Associated with SG Removal & Installation ML20217P0661999-10-0606 October 1999 Requests Withholding of Proprietary Rept NSD-SAE-ESI-99-389, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217B1891999-10-0404 October 1999 Submits Clarification Re Development of Basis for Determining Limiting Internal Pressure Loads Re Review of NRC SE for Cycle 16 Extension Request.Util Intends to Use Guidelines When Evaluating SG Tube Structural Integrity ML20212J8391999-09-30030 September 1999 Forwards RAI Re Request for Amends to Ts.Addl Info Needed to Complete Review to Verify That Proposed TS Are Consistent with & Validate Design Basis Analysis.Request Discussed with H Mahan on 990930.Info Needed within 10 Days of This Ltr ML20212J8801999-09-30030 September 1999 Discusses GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps. Util 980731,990607 & 03 Ltrs Provided Requested Info in Subj Gl.Nrc Considers Subj GL to Be Closed for Unit 1 L-99-032, Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 21999-09-23023 September 1999 Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 2 L-99-034, Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 21999-09-23023 September 1999 Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 2 ML20212F8861999-09-23023 September 1999 Forwards Revised Relief Request Number 32 for NRC Approval. Approval Requested by 991231 to Support Activities to Be Performed During Unit 1 Refueling Outage Scheduled for Spring of 2000 ML20212E7031999-09-23023 September 1999 Responds to GL 98-01, Year 2000 Readiness of Computer Sys at Npps. Util Requested to Submit Plans & Schedules for Resolving Y2K-related Issues ML20212F1111999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals ML20212C2351999-09-16016 September 1999 Submits Corrected Info Concerning Snoc Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20212D0101999-09-15015 September 1999 Informs That Submittal of clean-typed Copy of ITS & ITS Bases Will Be Delayed.Delay Due to Need for Resolution of Two Issues Raised by NRC staff.Clean-typed Copy of ITS Will Be Submitted within 4 Wks Following Resolution of Issues ML20212C4641999-09-13013 September 1999 Forwards Info Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams L-99-031, Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed1999-09-13013 September 1999 Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed ML20212C8041999-09-10010 September 1999 Responds to to D Rathbun Requesting Review of J Sherman Re Y2K Compliance.Latest NRC Status Rept on Y2K Activities Encl ML20212D4581999-09-10010 September 1999 Responds to to D Rathbun,Requesting Review of J Sherman Expressing Concerns That Plant & Other Nuclear Plants Not Yet Y2K Compliant ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211N8041999-09-0808 September 1999 Informs That on 990930 NRC Issued GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Condition, to Holders of Nuclear Plant Operating Licenses ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20212C0071999-09-0202 September 1999 Forwards Insp Repts 50-348/99-05 & 50-364/99-05 on 990627- 0807.No Violations Noted.Licensee Conduct of Activities at Farley Plant Facilities Generally Characterized by safety-conscious Operations & Sound Engineering ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20211K2131999-08-31031 August 1999 Informs That Snoc Has Conducted Review of Reactor Vessel Integrity Database,Version 2 (RVID2) & Conclude That Latest Data Submitted for Farley Units Has Not Been Incorporated Into RVID2 ML20211K4101999-08-31031 August 1999 Resubmits Relief Requests Q1P16-RR-V-5 & Q2P16-RR-V-5 That Seek to Group V661 Valves from Each Unit Into Sample Disassembly & Insp Group,Per 990525 Telcon with NRC L-99-030, Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS1999-08-30030 August 1999 Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS ML20211G6851999-08-26026 August 1999 Informs That During Insp,Technical Issues Associated with Design,Installation & fire-resistive Performance of Kaowool Raceway fire-barriers Installed at Farley Nuclear Plant Were Identified L-99-029, Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 07271999-08-19019 August 1999 Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 0727 ML20211B9431999-08-17017 August 1999 Forwards Fitness for Duty Performance Data for six-month Reporting Period 990101-990630,IAW 10CFR26.71(d).Rept Covers Employees at Jm Farley Nuclear Plant & Southern Nuclear Corporate Headquarters ML20211B9211999-08-17017 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-348/99-09 & 50-364/99-09.Corrective Actions:Security Response Plan Was Revised to Address Vulnerabilities Identified During NRC Insp ML20210R5101999-08-12012 August 1999 Forwards Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16 Only,Based on risk- Informed Approach for Evaluation of SG Tube Structural Integrity,As Result of Staff Comments ML20212C8141999-08-0909 August 1999 Forwards Correspondence Received from Jm Sherman.Requests Review of Info Re Established Policies & Procedures ML20210T2021999-08-0606 August 1999 Forwards Draft SE Accepting Licensee Proposed Conversion of Plant,Units 1 & 2 Current TSs to Its.Its Based on Listed Documents ML20210Q4641999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr to La Reyes,As Listed,With List of Individuals to Take exam,30 Days Before Exam Date ML20210J8341999-07-30030 July 1999 Forwards Second Request for Addl Info Re Util 990430 Amend Request to Allow Util to Operate Unit 1,for Cycle 16 Based on risk-informed Probability of SG Tube Rupture & Nominal accident-induced primary-to-second Leakage ML20210G4901999-07-30030 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, Issued 990603.Ltr Contains NRC License Commitment to Utilize ASTM D3803-1989 with Efficiency Acceptance Criteria Utilizing Safety Factor of 2 L-99-028, Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines1999-07-30030 July 1999 Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines L-99-027, Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.51999-07-27027 July 1999 Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.5 ML20210G8181999-07-26026 July 1999 Forwards Insp Repts 50-348/99-04 & 50-364/99-04 on 990516- 0626.One Violation Identified & Being Treated as Noncited Violation IR 05000348/19990091999-07-23023 July 1999 Discusses Insp Repts 50-348/99-09 & 50-364/99-09 on 990308- 10 & Forwards Notice of Violation Re Failure to Intercept Adversary During Drills,Contrary to 10CFR73 & Physical Security Plan Requirements ML20210E4071999-07-22022 July 1999 Responds to NRC 990702 RAI Re Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described in NEI 97-06, SG Program Guidelines L-99-026, Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments1999-07-19019 July 1999 Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments L-99-264, Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 20011999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 ML20209H4721999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 ML20196J6191999-07-0202 July 1999 Forwards Final Dam Audit Rept of 981008 of Category 1 Cooling Water Storage Pond Dam.Requests Response within 120 Days of Date of Ltr 05000364/LER-1999-001, Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed1999-07-0202 July 1999 Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed ML20196J7471999-07-0202 July 1999 Forwards RAI Re Cycle 16 Extension Request.Response Requested within 30 Days of Date of Ltr ML20196J5781999-07-0202 July 1999 Forwards RAI Re 981201 & s Requesting Amend to TS Associated with Replacing Existing Westinghouse Model 51 SG with Westinghouse Model 54F Generators.Respond within 30 Days of Ltr Date ML20196J6571999-07-0202 July 1999 Discusses Closure to TAC MA0543 & MA0544 Re GL 92-01 Rev 1, Suppl 1,RV Structural Integrity.Nrc Has Revised Rvid & Releasing It as Rvid,Version 2 as Result of Review of Responses ML20196J3591999-06-30030 June 1999 Forwards SE of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARL-99-035, Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld1999-10-18018 October 1999 Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld ML20217P0661999-10-0606 October 1999 Requests Withholding of Proprietary Rept NSD-SAE-ESI-99-389, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217B1891999-10-0404 October 1999 Submits Clarification Re Development of Basis for Determining Limiting Internal Pressure Loads Re Review of NRC SE for Cycle 16 Extension Request.Util Intends to Use Guidelines When Evaluating SG Tube Structural Integrity L-99-034, Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 21999-09-23023 September 1999 Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 2 L-99-032, Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 21999-09-23023 September 1999 Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 2 ML20212F8861999-09-23023 September 1999 Forwards Revised Relief Request Number 32 for NRC Approval. Approval Requested by 991231 to Support Activities to Be Performed During Unit 1 Refueling Outage Scheduled for Spring of 2000 ML20212C2351999-09-16016 September 1999 Submits Corrected Info Concerning Snoc Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20212D0101999-09-15015 September 1999 Informs That Submittal of clean-typed Copy of ITS & ITS Bases Will Be Delayed.Delay Due to Need for Resolution of Two Issues Raised by NRC staff.Clean-typed Copy of ITS Will Be Submitted within 4 Wks Following Resolution of Issues L-99-031, Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed1999-09-13013 September 1999 Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed ML20212C4641999-09-13013 September 1999 Forwards Info Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211K2131999-08-31031 August 1999 Informs That Snoc Has Conducted Review of Reactor Vessel Integrity Database,Version 2 (RVID2) & Conclude That Latest Data Submitted for Farley Units Has Not Been Incorporated Into RVID2 ML20211K4101999-08-31031 August 1999 Resubmits Relief Requests Q1P16-RR-V-5 & Q2P16-RR-V-5 That Seek to Group V661 Valves from Each Unit Into Sample Disassembly & Insp Group,Per 990525 Telcon with NRC L-99-030, Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS1999-08-30030 August 1999 Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS L-99-029, Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 07271999-08-19019 August 1999 Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 0727 ML20211B9431999-08-17017 August 1999 Forwards Fitness for Duty Performance Data for six-month Reporting Period 990101-990630,IAW 10CFR26.71(d).Rept Covers Employees at Jm Farley Nuclear Plant & Southern Nuclear Corporate Headquarters ML20211B9211999-08-17017 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-348/99-09 & 50-364/99-09.Corrective Actions:Security Response Plan Was Revised to Address Vulnerabilities Identified During NRC Insp ML20210R5101999-08-12012 August 1999 Forwards Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16 Only,Based on risk- Informed Approach for Evaluation of SG Tube Structural Integrity,As Result of Staff Comments ML20212C8141999-08-0909 August 1999 Forwards Correspondence Received from Jm Sherman.Requests Review of Info Re Established Policies & Procedures ML20210G4901999-07-30030 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, Issued 990603.Ltr Contains NRC License Commitment to Utilize ASTM D3803-1989 with Efficiency Acceptance Criteria Utilizing Safety Factor of 2 L-99-028, Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines1999-07-30030 July 1999 Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines L-99-027, Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.51999-07-27027 July 1999 Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.5 ML20210E4071999-07-22022 July 1999 Responds to NRC 990702 RAI Re Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described in NEI 97-06, SG Program Guidelines L-99-026, Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments1999-07-19019 July 1999 Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments L-99-264, Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 20011999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 ML20209H4721999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 05000364/LER-1999-001, Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed1999-07-0202 July 1999 Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed L-99-024, Responds to NRC RAI Re Conversion to ITS for Chapters 3.4, 3.5,3.6,3.7,3.9 & 5.0,per 990419-20 Meetings with NRC1999-06-30030 June 1999 Responds to NRC RAI Re Conversion to ITS for Chapters 3.4, 3.5,3.6,3.7,3.9 & 5.0,per 990419-20 Meetings with NRC L-99-025, Forwards Rev 2 to Jfnp Security plan,FNP-0-M-99,IAW 10CFR50.4(b)(4).Attachment 1 Contains Summary of Changes & Amended Security Plan Pages.Encl Withheld from Public Disclosure Per 10CFR73.211999-06-30030 June 1999 Forwards Rev 2 to Jfnp Security plan,FNP-0-M-99,IAW 10CFR50.4(b)(4).Attachment 1 Contains Summary of Changes & Amended Security Plan Pages.Encl Withheld from Public Disclosure Per 10CFR73.21 ML20196J8631999-06-30030 June 1999 Submits Correction to Errors Contained in to NRC Re TS Changes Re Control Room,Penetration Room & Containment Purge Filtration Systems & Radiation Monitoring Instrumentation.Errors Do Not Require Rev of SA L-99-249, Submits Correction to Errors Contained in to NRC Re TS Changes Re Control Room,Penetration Room & Containment Purge Filtration Systems & Radiation Monitoring Instrumentation.Errors Do Not Require Rev of SA1999-06-30030 June 1999 Submits Correction to Errors Contained in to NRC Re TS Changes Re Control Room,Penetration Room & Containment Purge Filtration Systems & Radiation Monitoring Instrumentation.Errors Do Not Require Rev of SA L-99-224, Submits Rev to Unit 2 SG Tube voltage-based Repair Criteria Data Rept.Ltr Contains No Commitments1999-06-0707 June 1999 Submits Rev to Unit 2 SG Tube voltage-based Repair Criteria Data Rept.Ltr Contains No Commitments ML20195F1731999-06-0707 June 1999 Forwards Proprietary & non-proprietary Responses to NRC RAIs Re W TR WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs. W Proprietary Notice,Affidavit & Copyright Notice,Encl.Proprietary Info Withheld L-99-217, Forwards Proprietary & non-proprietary Responses to NRC RAIs Re W TR WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs. W Proprietary Notice,Affidavit & Copyright Notice,Encl.Proprietary Info Withheld1999-06-0707 June 1999 Forwards Proprietary & non-proprietary Responses to NRC RAIs Re W TR WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs. W Proprietary Notice,Affidavit & Copyright Notice,Encl.Proprietary Info Withheld L-99-225, Responds to GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants1999-06-0707 June 1999 Responds to GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants ML20195F0621999-06-0707 June 1999 Submits Rev to Unit 2 SG Tube voltage-based Repair Criteria Data Rept.Ltr Contains No Commitments ML20195E9581999-06-0707 June 1999 Responds to GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants ML20195C6941999-05-28028 May 1999 Forwards Response to NRC RAI Re GL 96-05 for Farley Nuclear Plant.Farley Is Committing to Implement Phase 3 of JOG Program L-99-021, Forwards Response to RAI Re Conversion to ITSs for Chapter 3.3.Attachment II Includes Proposed Revs to Previously Submitted LAR Re Rais,Grouped by RAI number.Clean-typed Copies of Affected ITS Pages Not Included1999-05-28028 May 1999 Forwards Response to RAI Re Conversion to ITSs for Chapter 3.3.Attachment II Includes Proposed Revs to Previously Submitted LAR Re Rais,Grouped by RAI number.Clean-typed Copies of Affected ITS Pages Not Included L-99-203, Forwards Response to NRC RAI Re GL 96-05 for Farley Nuclear Plant.Farley Is Committing to Implement Phase 3 of JOG Program1999-05-28028 May 1999 Forwards Response to NRC RAI Re GL 96-05 for Farley Nuclear Plant.Farley Is Committing to Implement Phase 3 of JOG Program ML20195F2101999-05-24024 May 1999 Requests That Farley Nuclear Plant Proprietary Responses to NRC RAI Re W WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs, Be Withheld from Public Disclosure Per 10CFR2.790 L-99-180, Forwards Responses to NRC RAI Questions for Chapter 3.8 of Ts.Proposed Revs to TS Previously Submitted with LAR Related to RAI1999-04-30030 April 1999 Forwards Responses to NRC RAI Questions for Chapter 3.8 of Ts.Proposed Revs to TS Previously Submitted with LAR Related to RAI ML20206F4321999-04-30030 April 1999 Forwards Responses to NRC RAI Questions for Chapter 3.8 of Ts.Proposed Revs to TS Previously Submitted with LAR Related to RAI L-99-017, Forwards Responses to NRC RAI Questions for Chapters 3.1, 3.2,3.5,3.7 & 3.9 of Ts.Attached Pages Include Proposed Revs Previously Submitted LAR to Rais,Grouped by Chapters & RAI Numbers1999-04-30030 April 1999 Forwards Responses to NRC RAI Questions for Chapters 3.1, 3.2,3.5,3.7 & 3.9 of Ts.Attached Pages Include Proposed Revs Previously Submitted LAR to Rais,Grouped by Chapters & RAI Numbers ML20206C8021999-04-26026 April 1999 Forwards 1998 Annual Rept, for Alabama Power Co.Encls Contain Financial Statements for 1998,unaudited Financial Statements for Quarter Ending 990331 & Cash Flow Projections for 990101-991231 05000348/LER-1998-007, Forwards SG-99-04-001, Farley-1:Final Cycle 16 Freespan ODSCC Operational Assessment, as Committed to in Licensee & LER 98-007-00.Util Is Revising Plant Administrative SG Operating Leakage Requirements as Listed1999-04-23023 April 1999 Forwards SG-99-04-001, Farley-1:Final Cycle 16 Freespan ODSCC Operational Assessment, as Committed to in Licensee & LER 98-007-00.Util Is Revising Plant Administrative SG Operating Leakage Requirements as Listed L-99-015, Forwards Rev 1 to Jfnp Security plan,FNP-O-M-99,resulting from Implementation of Biometrics Sys.Changes Incorporate Changes Previously Submitted to NRC as Rev 28 by Licensee .Encl Withheld,Per 10CFR73.211999-04-21021 April 1999 Forwards Rev 1 to Jfnp Security plan,FNP-O-M-99,resulting from Implementation of Biometrics Sys.Changes Incorporate Changes Previously Submitted to NRC as Rev 28 by Licensee .Encl Withheld,Per 10CFR73.21 ML20206B4391999-04-21021 April 1999 Forwards Corrected ITS Markup Pages to Replace Pages in 981201 License Amend Requests for SG Replacement L-99-172, Forwards FNP Annual Radioactive Effluent Release Rept for 1998, IAW TSs Sections 6.9.1.8 & 6.9.1.9.Changes to ODCM Revs 16,17 & 18 Are Encl,Iaw TS Section 6.14.21999-04-21021 April 1999 Forwards FNP Annual Radioactive Effluent Release Rept for 1998, IAW TSs Sections 6.9.1.8 & 6.9.1.9.Changes to ODCM Revs 16,17 & 18 Are Encl,Iaw TS Section 6.14.2 ML20205S9501999-04-21021 April 1999 Forwards FNP Annual Radioactive Effluent Release Rept for 1998, IAW TSs Sections 6.9.1.8 & 6.9.1.9.Changes to ODCM Revs 16,17 & 18 Are Encl,Iaw TS Section 6.14.2 ML20205R0431999-04-13013 April 1999 Forwards Correction to 960212 GL 95-07 180 Day Response. Level 3 Evaluation for Pressure Locking Utilized Analytical Models.Encl Page Has Been Amended to Correct Error 1999-09-23
[Table view] Category:UTILITY TO NRC
MONTHYEARML20064A7131990-09-17017 September 1990 Advises That Due to Reassignment,Jj Clark No Longer Needs to Maintain Senior Reactor Operator Licenses ML20059J2811990-09-14014 September 1990 Forwards List of Key Radiation Monitors Which Will Be Used as Inputs to Top Level Radioactivity Status Bar Re Spds.List Identifies Monitors Which Would Provide Concise & Meaningful Info About Radioactivity During Accidents ML20065D5961990-09-13013 September 1990 Responds to Violations Noted in Insp Repts 50-348/90-19 & 50-364/90-19.Response Withheld ML20059J1661990-09-13013 September 1990 Forwards Monthly Operating Rept for Aug 1990 for Jm Farley Nuclear Plant & Rev 10 to ODCM ML20059L0751990-09-12012 September 1990 Forwards Revised Pages to Rev 3 to, Second 10-Yr Interval Inservice Insp Program for ASME Code Class 1,2 & 3 Components ML20059J2911990-09-12012 September 1990 Forwards Operator Licensing Natl Exam Schedules for FY91 Through FY94,per Generic Ltr 90-07.Requalification Schedules & Estimated Number of Candidates Expected to Participate in Generic Fundamental Exam,Also Encl ML20064A7111990-09-12012 September 1990 Forwards Rev 1 to Relief Request RR-1, Second 10-Yr Interval Inservice Insp Program for ASME Code Class 1,2 & 3 Components ML20059J2891990-09-12012 September 1990 Confirms Rescheduling of Response to Fitness for Duty Program Notice of Violation 90-18-02,per 900907 Telcon ML20065D6621990-09-12012 September 1990 Forwards NPDES Permit AL0024619 Effective 900901.Limits for Temp & Residual Chlorine Appealed & Stayed ML20064A3431990-08-28028 August 1990 Forwards Corrected Insertion Instructions to Rev 8 to Updated FSAR for Jm Farley Nuclear Plant ML20059D4711990-08-22022 August 1990 Forwards Fitness for Duty Performance Data for Jan-June 1990 ML20059B5101990-08-22022 August 1990 Forwards Semiannual Radioactive Effluent Release Rept for Jan-June 1990.No Changes to Process Control Program for First Semiannual Period of 1990 Exists ML20056B2751990-08-20020 August 1990 Forwards Relief Requests from Second 10-yr Interval Inservice Testing Program for Class 1,2 & 3 Pumps & Valves. Request Incorporates Commitments in 891222 Response to Notice of Violation ML20056B2741990-08-20020 August 1990 Forwards Rev 2 to Unit Inservice Testing Program,For Review & Approval.Rev Incorporates Commitments Addressed in Util 891222 Response to Notice of Violation & Other Editorial & Technical Changes ML20058Q1481990-08-15015 August 1990 Forwards Rev 3 to FNP-1-M-043, Jm Farley Nuclear Plant Unit 1 Second 10-Yr Inservice Insp Program,Asme Code Class 1,2 & 3 Components ML20058P6201990-08-15015 August 1990 Forwards Rev 1 to FNP-2-M-068, Ten-Yr Inservice Insp Program for ASME Code Class 1,2 & 3 Components, Per 891207 & 900412 Responses to NRC Request for Addl Info ML20055G7701990-07-18018 July 1990 Updates 900713 Response to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount ML20055F7411990-07-11011 July 1990 Forwards Monthly Operating Rept for June 1990 & Corrected Monthly Operating Repts for Nov 1989 Through May 1990.Repts Revised to Correct Typo on Value of Cumulative Number of Hours Reactor Critical ML20055F3781990-07-10010 July 1990 Submits Final Response to Generic Ltr 83-28,Items 4.2.3 & 4.2.4.Util Position That Procedures Currently Utilized by Plant Constitute Acceptable Ongoing Life Testing Program for Reactor Trip Breakers & Components ML20055D4861990-07-0202 July 1990 Requests Authorization to Use Encl ASME Boiler & Pressure Vessel Code Case N-395 Re Laser Welding for Sleeving Process Described by Oct 1990,per 10CFR50.55a,footnote 6 ML20055D1001990-06-26026 June 1990 Responds to Violations Noted in Insp Repts 50-348/90-12 & 50-364/90-12 on 900411-0510.Corrective Actions:Electrolyte Level Raised in Lights Identified by Inspector to Have Low Electrolyte Level ML20044A6191990-06-26026 June 1990 Suppls 900530 Ltr Containing Results of SPDS Audit,Per Suppl 1 to NUREG-0737.One SPDS Console,Located in Control Room,Will Be Modified So That Only SPDS Info Can Be Displayed by Monitor.Console Will Be Reconfigured ML20043G4741990-06-11011 June 1990 Submits Addl Info Re 900219 Worker Respiratory Protection Apparatus Exemption Rev Request.Proposed Exemption Rev Involves Features Located Entirely within Restricted Area as Defined in 10CFR20 ML20043C1851990-05-29029 May 1990 Forwards Proposed Schedules for Submission & Requested Approval of Licensing Items ML20043B5941990-05-25025 May 1990 Provides Rept of Unsatisfactory Performance Testing,Per 10CFR26,App A.Error Caused by Olympus Analyzer Which Allowed Same Barcode to Be Assigned to Two Different Samples. Smithkline Taken Action to Prevent Recurrence of Scan Error ML20042G7461990-05-10010 May 1990 Certifies That Plant Licensed Operator Requalification Program Accredited & Based Upon Sys Approach to Training,Per Generic Ltr 87-07.Program in Effect Since 890109 ML20042F0831990-05-0101 May 1990 Forwards Rev 18 to Security Plan.Rev Withheld ML20042G3081990-04-25025 April 1990 Forwards Alabama Power Co Annual Rept 1989, Unaudited Financial Statements for Quarter Ending 900331 & Cash Flow Projections for 1990 ML20042E4121990-04-12012 April 1990 Provides Addl Info Re Review of Second 10-yr Inservice Insp Program,Per NRC 890803 Request.Relief Request RR-30 Requested Reduced Holding Time for Hydrostatically Testing Steam Generator Secondary Side ML20012E9571990-03-27027 March 1990 Forwards Annual Diesel Generator Reliability Data Rept,Per Tech Spec 6.9.1.12.Rept Provides Number of Tests (Valid or Invalid),Number of Failures for Each Diesel Generator at Plant for 1989 & Info Identified in Reg Guide 1.108 ML20012D9661990-03-22022 March 1990 Forwards Annual ECCS Evaluation Model Changes Rept,Per Revised 10CFR50.46.Info Includes Effect of ECCS Evaluation Model Mods on Peak Cladding Temp Results & Summary of Plant Change Safety Evaluations ML20012D8901990-03-20020 March 1990 Clarifies 891130 Response to Generic Ltr 83-28,Item 2.2.1 Re Use of Q-List at Plant,Per NRC Request.Fnpims Data Base Utilized as Aid for Procurement,Maint,Operations & Daily Planning ML20012C4701990-03-15015 March 1990 Responds to NRC 900201 Ltr Re Emergency Planning Weaknesses Identified in Insp Repts 50-348/89-32 & 50-364/89-21. Corrective Actions:Cited Procedures Revised.Direct Line Network Notification to State Agencies Being Implemented ML20012C6241990-03-14014 March 1990 Informs of Resolution of USI A-47,per Generic Ltr 89-19 ML20012C4651990-03-13013 March 1990 Provides Verification of Nuclear Insurance Reporting Requirements Specified in 10CFR50.54 w(2) ML20012C2051990-03-0505 March 1990 Forwards SPDS Critical Function Status Trees,Per G West Request During 900206 SPDS Audit at Plant.W/O Encl ML20012A1621990-03-0202 March 1990 Forwards Addl Info Inadvertently Omitted from Jul-Dec 1989 Semiannual Radioactive Effluent Release Rept,Including Changes to Process Control Program ML20012A1301990-03-0101 March 1990 Responds to Generic Ltr 90-01 Re Request for Voluntary Participation in NRC Regulatory Impact Survey.Completed Questionnaire Encl ML20043A7481990-02-0202 February 1990 Forwards Util Exam Rept for Licensed Operator Requalification Written Exams on 900131 ML20006D2311990-01-31031 January 1990 Responds to NRC Bulletin 89-003 Re Potential Loss of Required Shutdown Margin During Refueling Operations. Refueling Procedures Will Be Revised to Incorporate Guidance That Will Preclude Inadvertent Loss of Shutdown ML20006A9091990-01-23023 January 1990 Forwards Response to Generic Ltr 89-13 Re Svc Water Sys Problems Affecting safety-related Equipment.Util Has Program to Perform Visual Insps & Cleanings of Plant Svc Water Intake Structure by Means of Scuba Divers ML20005E4931989-12-28028 December 1989 Provides Certification That fitness-for-duty Program Meets 10CFR26 Requirements.Testing Panel & cut-off Levels in Program Listed in Encl ML20005E3681989-12-28028 December 1989 Responds to Violations Noted in Insp Repts 50-348/89-28 & 50-364/89-28 on 891002-06.Corrective Actions:All Piping Preparation for Inservice Insp Work in Containment Stopped & All Participants Assembled to Gather Facts on Incident ML20005E1971989-12-27027 December 1989 Responds to Violations Noted in Insp Repts 50-348/89-22 & 50-364/89-22 on 890911-1010.Corrective Actions:Steam Generator Atmospheric Relief Valve Closed & Core Operations Suspended.Shift Supervisor Involved in Event Counseled ML20011D5041989-12-22022 December 1989 Responds to Violations Noted in Insp Repts 50-348/89-26 & 50-364/89-26.Corrective Actions:Personnel Involved in Preparation of Inservice Test Procedures Counseled. Violation B Re Opening of Pressurizer PORV Denied ML19332F2111989-12-0707 December 1989 Forwards Final Response to NRC 890803 Request for Addl Info Re Review of Updated Inservice Insp Program,Summarizing Results of Addl Reviews & Providing Exam Listing Info ML19332F0791989-12-0707 December 1989 Responds to Violations Noted in Insp Repts 50-348/89-22 & 50-364/89-22.Corrective Actions:All Managers Retrained on Intent of Overtime Procedures & Sys Established to Provide Independent Check of All Time Sheets Each Pay Period ML19332F1141989-12-0707 December 1989 Forwards Description of Instrumentation Sys Selected in Response to Generic Ltr 88-17, Loss of DHR, Per Licensee 890127 Commitment.Hardware Changes Will Be Implemented During Unit 1 Tenth & Unit 2 Seventh Refueling Outages ML19332F1241989-12-0707 December 1989 Forwards Response to NRC 890803 Request for Addl Info Re Review of Second 10-yr Inservice Insp Program,Per 891005 Ltr ML19353B0071989-12-0606 December 1989 Forwards Rev 1 to Safeguards Security Contingency Plan.Rev Withheld 1990-09-17
[Table view] |
Text
Malling Address
'* AI bama Power Company 600 Horth 18th Strset
. Post Of fice Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L. Clayton, Jr. b U C C "' 7 "' AlabamaPower ne souven chac syuem June 4, 1982 Docket Nos. 50-348 50-364 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Mr. S. A. Varga Gentlemen:
Joseph M. Farley Nuclear Plant - Units 1 and 2 NUREG-0737, Item II.E.1.2 and Unit 2 License Condition 2.C(21)(e)
This letter is submitted to document conversations with Mr.
Ed Reeves of June 3,1982 clarifying Alabama Power Company's letter of April 16, 1982 as related to auxiliary feedwater system initiation and indication. It has been determined that Alabama Power Company meets the requirements of NUREG-0737, Item II.E.1.2. Attachment 1 provides an item by item response to each of the nine (9) specific NUREG-0737, Item II.E.1.2, requirements showing that the current design complies with these criteria.
During the Unit 2 licensing review, auxiliary feedwater systems design enhancements were identified by the NRC. These enhancements were d7cumented by NRC letter dated November 5, 1980. Alabama Power Company, in its December 4, 1980 letter to the NRC, committed to implement these modifications on both Units 1 and 2. This commitment was subsequently incorporated into the Unit 2 license as condition 2.C.(21)(e). In accordance with this license condition, Alabama fower Company submitted its design for these auxiliary feedwater system enhancements on July 1,1981 and received NRC approval of this design by letter dated August 7, 1981, t/h Attachment 2 is a brief summary of the NRC concerns identified in the NRC November 5,1980 letter with an explanation of the modifications to be made by Alabama Power Company. Al abama Power Company does not consider these modifications to be necessary for the requirements of NUREG-0737 Item II.E.1.2 and therefore considers itself to have complied with all of the NUREG-0737, Item II.E.1.2 requirements. As indicated in the OhKOhhohfg PDR
Mr. S. A. Varga .Page 2 Director of Nuclear Reactor Regulation June 4, 1982 April 16, 1982 letter, Alabama Power Company is nevertheless pursuing installation of these modifications on both units in accordance with the Unit 2 license condition and the Alabama Power Company letter of December 22, 1981.
If you have any questions, please advise.
Yours very truly,
',/ - /
. L. Clay o r ,
FLCJr/CLB:lsh-D9 Attachments cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford
Attachment 1 II.E.1.2 AUXILIARY FEEDWATER SYSTEM AUTOMATIC INITIATION AND FLOW INDICATION PART 1: Auxiliary Feedwater System Automatic Initiation Position Consistent with satisfying the requirements of General Design Criterion 20 of Appendix A to 10 CFR Part 50 with respect to the timely initiation of the auxiliary feedwater system (AFWS), the following requirements shall be implemented in the short term:
(1) The design shall provide for the automatic initiation of the AFWS.
(2) The automatic initiation signals and circuits shall be designed so that a single failure will not result in the loss of AFWS function.
(3) Testability of the initiating signals and circuits shall be a feature of the design.
(4) The initiating signals and circuits shall be powered from the emergency buses.
(5) Manual capability to initiate the AFWS from the control room shall be retained and shall be implemented so that a single failure in the manual circuits will not result in the loss of system function.
(6) The ac motor-driven pumps and valves in the AFWS shall be included in the automatic actuation (simultaneous and/or sequential) of the loads onto the emergency buses.
(7) The automatic initiating signals and circuits shall be designed so that the failure will not result in the loss of n.anual capability to initiate the AFWS from the control room.
f In the long term, the automatic initiation signals and circuits shall be upgraded in accordance with safety-grade requirements.
Response
(1) With the control switches in the auto position, the motor-driven auxiliary feedwater pumps will automatically start on any of the following signals:
m
l 4
Attachment 1 NUREG-0737, Item II.E.1.2 Page 2 A. Low-low water level signals from two-out-of-three level transmitters on any one steam generator.
B. Any of the conditions as defined in FSAR Section 7.3 that cause a safety injection signal.
C. Loss of offsite power.
D. Trip of both main feedwater pumps.
Operation of the turbine-driven auxiliary feedwater pump is initiated by the opening of the steam supply valves to the turbine drive. Steam from the main steam header is automatically admitted to the turbine drive on either of the following signals:
A. Loss of power signal (2/3 reactor coolant pump bus undervoltage), or B. Low-low water level signals from two-out-of-three of the level transmitters of any two-out-of three steam generators.
Details of the emergency operation of the auxiliary feedwater systems are contained in FSAR Sections 6.5.2.2.5 and 6.5.2.3.3.
(2) The auxiliary feedwater system is designed to meet the single failure criteria so that no single failure will prevent the supply of sufficient feedwater to at least two of the three steam generators. A detailed design evaluation is contained l
l in FSAR Section 6.5.3. A failure analysis of the auxiliary feedwater system is provided in Table 6.5-2 of the FSAR.
l (3) In order to ensure the operability of the auxiliary feedwater i system, periodic testing of the system is performed in l accordance with the Farley Nuclear Plant Standard Technical Specifications, Section 3.7.1.2 for both units. These l technical specifications list the limiting conditions for operation and the surveillance requirements for the auxiliary l
feedwater system. These surveillance requirements ensure l
that both the motor-driven pumps and turbine-driven pumps are operable; that each valve in the flow path that is not locked, sealed, or otherwise secured in position is in its l
t _.
Attachment 1 NUREG-0737, Item II.E.1.2 Page 3 correct position; and that the motor driven and turbine-driven pumps start automatically upon receipt of a test signal which simulates emergency operation of the system.
(4) The initiating signals and circuits for the auxiliary feedwater system are powered f rom the emergency buses.
(5) The auxiliary feedwater system can be operated locally from the hot shutdown panel or remotely from the control room.
The operation of the system is described in FSAR Section 6.5.2.3. The system is designed to meet the single failure criteria and a failure analysis of the system is contained in FSAR Table 6.5-2.
(6) The AC motor-driven pumps and valves in the auxiliary feedwater system are included in the automatic actuation of the loads onto the emergency buses.
(7) The auxiliary feedwater system can be operated locally from the hot shutdown panel or remotely from the control room as detailed in FSAR Section 6.5.2.2.5.
The automatic-initiation signals and circuits assoicated with the auxiliary feedwater system satisfy safety grade requirements (i.e.,IEEE 279-1971 and seismic).
As part of the environmental qualification ef fort, Alabama Power Company has determined that six solenoid valves of the Unit 1 Auxiliary Feedwater System lack adequate qualification documentation. These six solenoids are to be replaced in conjunction with the design change for the Auxiliary Feedwater System to avoid duplication of ef fort upon the fourth refueling outage scheduled for the first quarter of 1983. Interim operation with these six solenoids has been justified based on a review of the post accident environmental conditions, the design features of the solenoids, and redundant equipment. This matter was addressed in letter dated March 8, 1982, " NRC Commitment Compliance Status."
The Auxiliary Feedwater System for Unit 2 is fully qualified as addressed by letter dated July 1, 1981, "NPF-8 License Condition 2.C.(18)(6).
Attachment 1 NUREG-0737, Item II.E.1.2 Page 4 Part 2: Auxiliary Feedwater System Flowrate Indication Position Consistent with satisfying the requirements set forth in General Design Criterion 13 to provide the capability in the control room to ascertain the actual performance of the AFWS when it is called to perform its intended function, the following requirements shall be implemented:
- 1. Safety-grade indication of auxiliary to each steam generator shall be provided in the control room.
- 2. The auxiliary feedwater flow instrument channels shall be powered from the emergency buses consistent with satisfying the emergency power diversity requirements of the auxiliary feedwater system set forth in Auxiliary Systems Branch Technical Position 10-1 of the Standard Review Plan, Section 10.4.9.
Response
(1) Auxiliary feedwater injection lines to each steam generator are provided with safety-grade flow indication. This flow indication is on the main contrcl board and is powered from the plant emergency power. These flow instrument loops are testable. Redundancy requirements are met by qualified steam generator level instrumentation (safety-grade). A description of the presently installed equipment is provided below.
Local and control room indication of auxiliary feedwater flow to each of the steam generators is provided by flow orifices in the auxiliary feedwater supply line, located just upstream of the auxiliary feedwater stop check valves. The auxiliary feedwater flow indication is backed up by three redundant safety-grade narrow range steam generator level channels and one safety grade wide range steam generator level channel per steam generator which have control room readouts.
Testing of this equipment is conducted in accordance with the Farley Nuclear Plant Technical Specifications. The auxiliary feedwater flow indication channels and steam generator wide range level channels are calibrated every 18 months. The steam generator narrow range level channels are functionally tested every 31 days and calibrated every 18 months.
l'
l Attachment 1 NUREG-0737, Item II.E.1.2 Page 5 The displays and controls associated with auxiliary feedwater system flowrate indication were considered as part of the human factor analysis conducted in response to NUREG-0737, Item I.D.1.
(2) The auxiliary feedwater flow instrumentation channels and the steam generator narrow range channels receive their power from the Class 1E vital instrument buses. The steam generator wide range channels also receive their power from vital instrument buses.
1 P
A i
Attachment 2 November 5, 1980 NRC Letter Concerns
- 1. The current protection system logic is such that the motor driven auxiliary feedwater pump discharge valves are not automatically fully opened following a low steam generator level signal, or signal indicating trip of the main feedwater pumps of a blackout sequence signal if the valve operating mode switches are in the modulate position. (These signals will, however, start the motor driven auxiliary feedwater pumps). The low steam generator level signal is the primary Auxiliary Feedwater System actuation signal for loss of feedwater accidents that do not involve initiation of safety injection. The logic should be modified such that all automatic protective signals shown in Figure 7.2-14 of the Final Safety Analysis Report will automatically open the motor driven pump discharge valves regardless of the position of the valve operating mode switches.
APCo Modification The control-protection system logic will be modified to allow the motor driven auxiliary feedwater pump discharge valves to automatically open fully in reponse to all of the auxiliary feedwater system automatic initiation signals in Figure 7.2-14 of the FSAR, regardless of the position of the valve control swtiches.
- 2. The redundant solenoid valves in the control air lines to the auxiliary feedwater pump discharge valves are presently arranged to be " energized to close or modulate" the discharge valves and "de-energize to open" the discharge valves. When the auxiliary feedwater system is in use, the loss of a single power supply would, thus, open all of the auxiliary feedwater pump discharge valves resulting in full auxiliary feedwater flow to the ; team generators. Manual control of the discharge valves from the control room would be precluded by the loss of either of the power supplies for the redundant solenoid valves. While these failure modes cause undesirable transients resulting in inadvertent plant cooldown transients l during normal operations, we find that such failures are i
unacceptable with respect to the safety function of controlling auxiliary feedwater flow following its initiation c by the protection system. The logic and failure modes of the solenoid valves should be modified such that the loss of single power supply will not cause the pump discharge valves to open. Dependence on manual corrective actions which could be taken to limit auxiliary feedwater flow, e.g. , closure of block valves, control of turbine driven pump speed, tripping
Attachment 2 NUREG-0737 Item II.E.1.2 Page 2 pumps, etc., are not an acceptable alternative to resolve this concern in the long term.
APCo Modification The existing redundant solenoid valves in the control air lines of the motor driven pump discharge valves will be replaced with solenoid valves required to be " energized" to open and "de-energeized" to close or modulate.
The existing redundant solenoid valves in the control air line of each turbine driven pump discharge valve will be replaced with only one (1) solenoid valve required to
" energized" to open and "de-energized" to close or modulate.
The new solenoid valve, as well as the remaining existing solenoid valve in the air line of each discharge valve associated with the turbine driven pump, will be powered from an uninterruptible power supply (UPS), which also is the source of power for the turbine driven pump steam admission valves.
- 3. All manual control stations for both the motor and turbine driven pump discharge valves are presently powered from a single train power source. Loss of this power causes these valves to fail open and results in loss of the capability to modulate auxiliary feedwater flow using any of the pump discharge valves. The power distribution should be modified such that the turbine driven pump discharge valve manual control stations are powered from the power source used to derive power for the turbine driven pump steam admission valves and related controls.
APCo Modificaton The present power source for the manual control stations of the turbine driven pump discharge valves will be replaced with the UPS.
As a result of the above modifications, which make the entire operation of the turbine driven pump and its associated steam admission and discharge valves dependent on the UPS for power, the control selector switches for the turbine driven pump discharge valves will be relocated f rom the existing hot shutdown panel into a new hot shutdown panel dedicated to the turbine driven pump, and the manual control stations are to be relocated to the existing TDAFP hot shutdown Panel "D".
The existing control selector switches for the turbine driven pump steam admission valves will also be relocated to the new
Attachment 2 NUREG-0737 Item II.E.1.2 Page 3 hot shutdown panel dedicated to the turbine driven pump.
The electronics associated with the remote manual control of the turbine driven pump discharge valves and speed control loops will be procured from Westinghouse and will be installed in the new hot shutdown panel dedicated to the turbine driven pump.
- 4. Air accumulators are provided for the turbine driven auxiliary feedwater pump steam admission valves since air is required for their operation and the normal air supply is from the non-safety grade instrument air system. The Unit I design utilizes a check valve and a solenoid operated valve, which closes by action of a pressure switch on low pressure, to isolate the accumulator from the instrument air system and assure accumulator air availability. The Unit 2 design uses two series check valves to assure the availability of the accumulator ai r. There is presently no way to independently verify by testing the operability of each check valve. The advantage of the Unit 1 design, i.e., diversity and the fact that it is easier to verify its operability by testing, appears to make it a more reliable system to perform this safety function. The system design for this function should be the same for both units. Alabama Power Company should provide the design basis for this system. The design basis should address a rapid and a slow depressurization of the normal air system as well as the method of independently testing the redundant means for isolating the accumulators from the normal air supply. If a check valve is used as part of the isolation function, the concerns contained in IE Bulletin No. 80-01 related to the check valve seat material should be addressed.
APCo Modification The design uses a check valve and solenoid valve to provide diversity of isolation. The solenoid valve and check valve have been relocated outside the main steam room to improve accessibility for periodic testing. Test connections have been added to allow individual operability checks of check valve and solenoid valve. The check valve is soft seated as required by Bulletin 80-01. The check valve, pressure switches and solenoid valve are seismic Class I.
The design basis for the air accumulators is to provide
- uf ficient capacity to open the valves and allow turbine operation for two hours. The design basis for the accumulator air supply is to provide redundant backflow
e a."
Attachment 2 NUREG-0838, Item II.E.1.2 Page 4 prevention between the safety related air accumulator and non safety instrument air system. The spring loaded check valve provides isolation whenever instrument air pressure falls below accumulator pressure and is the primary protection for the rapid depressurization event. The solenoid valve provides isolation whenever instrument air pressure falls below the pressure switch setpoint. The pressure switch is to be set at 80 psig to provide isolation for the slow depressurization event. An alarm is provided to alert the operator to low pressure in the accumulators. The air isolation solenoid valve will be powered from a UPS.