Monthly Operating Repts for Nov 1981
ML20039B172
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/10/1981
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20039B170 List:
References
NUDOCS 8112220369
Download: ML20039B172 (9)


Text

- - - - , . -- - . .- , - .-. .-- - - .- .

OPERATING DATA REPORT DOCKET NO. 50-266 DATE December 10, 1981

! tw y COMPLETED B" C. U. FAY

>M 8$ TELEPHONE 41'4 277 2811 g OPERATING STATUS

<> .. ...................... ^

OtD 1. UNI' NAME: POINT BEACH NUCLEAR PLANT UNIT 1 . NOTES ..

@[ 2. REPORTING PERIOD: NOVEMBER 1981 . .

om 3. LICENSED THERMAL POWER (MWT): 1518. . .

NC 4. NAMEPLATE RATING (GPOSS MUE): 523.8 . .

  • / 5. DESIGN ELECTRICAL RATING (NET MWE): 497. . .
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 519. . .
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): ,495. ........................
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THRCdGH 7) SINCE LAST REPORT, GIVE REASONS:

NOT APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANT (NET MWE): 445.0
10. REASONS FOR RESTRICTIONS, (IF ANY): Maximum dependable capacity reduced because of self-imposed hot leg temperature limitation in an attempt to limit steam generator tube' corrosion.

THIS MONTH YR 10 DATE CUMULATIVE

, 11. HOURS,.IN REPORTING PERIOD 720 8,016 97,032 i 12. NUMBER OF HOURS' REACTOR UAS CRITICAL 0.0 6,368.5 7V,803.3

13. PEACTOR RESERVE SHUTDOWN HOURS 0.C 1.3 607.0
14. HOURS 6ENERATOR ON LINE 0.0 6,338.8 7/,475.7
15. UNIT RESERVE SHUIDOWN HOURS 0.0 0.0 764.3
16. GROSS THERMAL ENERGY GENERATED (MWH) 0 7,912,401 106,750,845
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 2,563,760 35,823,480
18. NET ELECTRICAL ENERGY GENERA 1ED (MUH) 0 2,428,146 34,095,432 .
  • 19.' UNIT SERVICE FACTOR 0.0 79.1 79.8
20. UNI! AVAILABILITY FACTOR. 0.0 79.1 80.6
21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 61.2 72.0
22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 60.9 70.7
23. UNIT FORCED OUTAGE RATE 0.0 0.2 3.1.
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

NONE

25. IF SHUT 00WN AT END'0F REPORT PERIOD, ESTIMATED DATE OF STARTUP: 12-07-81

. DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 l

i

, r . , , .

DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 DATE December 10, 1981 COMPLETED BY C. W. Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH November, 1981 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 -1 11 -1 21 -2 2 -1 12 -1 22 -2 3 -1 13 -1 23 -2 4 -1 14 -1 24 -2 5 -1 15 -1 25 -1 6 -1 16 26 -2 7 -1 17 -1 27 -2 8 -1 18 -1 28 -2 9 -1 19 -1 29 -2 10 1 20 -1 30 -2 31 N/A AD-28A (1-77)

( A 0D 1-2 N 78 o 8B .

)

1 D

SF a

: t e

SF co hr ec .

de ud ggo 4 l

e d .

Qagohc mgu HGFEDCBAR

- e Mogoc" a

OOAORRMEs .

tp dp e e a q o U h e m e g fiu n gajm w R N n r ir u u n i: msgeinJt c E I r a n a le tp .

P T titalem 8g yotou s O

( isotine R S eotronan T H xnr rgnt L U paaTy c i M T lltr eF c O D a iaR a Re N O iEvie oi en T W nrans rl ps H N

) r it u oe S o nr Tr re r gi ee t A c s E N N

( &t t( Nv o D e i e oe v x

p Lo p

x .n e P in t O l c l m W c e a b e E i n i R n s n mgeP ,r

) e )

gmo R 1 E E D x 9 8 U a 1 C m T 3

gEycsu o o n I O

N S

4321M

- e t C OAMMh a tuaao Tu htnnd os eouu: e rmaa P all ra C

( t en TO eiS vd EM D p

xcc e LP UO r nC EL NC lSa to PE IK acm ir Rr r I I

OE T TP T

na ee NDDN

) m cc E AAN ut 5 4 ri BTMO.

YEE rv SE ( Sate ee 4 D P 5 ox Nhtix n 1 .C e o 0 uh Ueioh cA 4 c i -

ri Reoni ec / We n 2 cb Etnsb t 2 . m t 6 3i Gs i i 7 b 6 t - oft o 7 F e B 0ffo n - a r e I 1o rG 2 y a

- 6rD - 8 1 c 1 API 1 0 h S ) Ltrn 1 ,

a Eaes U m R pt 1 n e Ear 9i .

Fnru 8t it c 1

  • lr - 1 ey

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No. 50-266 Unit Name Point Beach Unit 1 Date December 10, 1981 Completed By C. W. Fay Telephone 414-277-2811 Unit 1 remained shut down throughout the period during its ninth refueling outage. Major work items performed during this period included the following.

Eddy current examination of Unit 1 "A" and "B" steam generator U-tubes was completed on October 30. A total of ten tubes in "A" steam generator and seven tubes in "B" steam generator required plugging. The tube degradation discovered during the eddy current tests is reportable in accordance with Technical Specification 15.6.9.2.A.3 (LER 81-017/OlT-0) .

The demonstration sleeving project on the "A" steam l generator commenced on November 1 following decontamination of' the hot leg side of the steam generator channelhead. On November 3, l

j tube plugs were removed from each end of six previously plugged i

tubes. A total of 12 tubes, including six tubes with defects exceeding the plugging limit, were successfully sleeved during the period November.4 through 11.

The "B" reactor coolant pump casing weld inspection-commenced on November 2. The examination was completed on November ~12' with no reportable indications.

The ultrasonic examination of the reactor vessel commenced on November 20. The examination was completed on November 21 with no reportable indications.

Fuel loading commenced on November 23 and was completed on November 25. The upper internals package'was replaced on November 25. The reactor vessel head assembly was replaced on November 27. The reactor vessel head studs were replaced on November 28 and tensioned on November 30.

Turbine. overhaul and reassembly continued throughout the period.

Safety-related maintenance throughout this period included sleeving of "A" steam generator; tube plugging in both "A" and "B," steam generators; disassembly, seal overhaul, and reassembly of the "B" reactor coolant pump; installation of reactor vessel level instrumentation tap-off connections and a reactor vessel head vent tap-off> connection; inspection, overhaul, and reassembly of various safety-related valves; overhaul of both residual heat removal pumps; weld repair of a previously peened control rod. drive mechanism seal weld; and repair of a large seismic snubber.

For a period of approximately two and one-half hours on October 16 and into October 17, the plant smoke detector system was inoperable. An error in wiring during backfitting of the fire protection system caused fuses to blow and de-energization of the system. The event has been determined to be reportable in accordance with Technical Specification 15.6.3.2.B.2 (LER 81-018/03L-0).

OPERATING DATA REPORT DOCKET NO. 50-301 l l

DATE necember 10, 1981 l COMPLETED BY C. W. FAY j TELEPHONE 414 277 2811 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2 . NOTES .
2. REPORTING PERIOD: NOVEMBER 1981 . .
3. LICENSED THERMAL POWER (MUT): 1518. . .
4. NAMEPLATE RATING (GROSS MWE): .523.8 . .
5. DESIGN ELECTRICAL RATING (NET MWE): 497. . .
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 519. . .
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 495. ........................
8. IF CHANGES 0CCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NOT-APPLICABLE

9. POWER LEVEL TO UHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 720 8,014 81,817
12. NUMBER.0F HOURS REACTOR WAS CRITICAL 720.0 7,103.5 73,653.5
13. REACTOR RESERVE SHUTDOWN HOURS .0.0 6.7 193.0

( 14. HOURS GENERATOR ON LINE 720.0 7,035.2 72,333.7

15. UNIT RESERVE SHUTDOWN HOURS 0.0 54.1 170.0 l 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,080,909 10,393,563 99,183,309
' 17. GROSS ELECTRICAL ENERGY GENERATED.(MWH) 370,930- 3,533,850 33,657,700 l 18. NET ELECTRICAL EilERGY GENERATED (MUH) 354,503 3,370,589 32,034,010 l 19. UNIT SERVICE FACTOR 100.0 87.8 88.4
20. UNIT AVAILABILITY FACTOR 100.0 88.4 88.6.
21. UNIT CAPACITY FACTOR (USING MDC NET) 99.5 .84.9 79.7
22. UNIT' CAPACITY FACTOR (USING DER NET) 99.1 84.6 78.8
23. UNIT FORCED OUTAGE RATE 0.0 0.0 1.7
24. SHUTDOWNS SCHEDULED 0VER NEXI 6 NONTHS (TYPE, DATE, AND DURATION OF EACH): Refueling outage scheduled for April 16, 1982, expected to last approximately 11 weeks.
25. IF SHUTDOWN AT END OF REPORI PERIOD,. ESTIMATED DATE OF STARTUP NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

DOCKET NO. 50-301 l

l UNIT NAME Point Beach Unit 2 DATE December 10, 1981-COMPLETED BY C.'W. Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH November, 1981 l AVERAGE AVERAGE AVERAGE l DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 495 11 493 21 493 l

2 495 12 493 22 493-3 494 13 493 23 492

4 494 14 492 24 491
5 .498 15 493 25 495 6 489 16 493 26 491 l 7 493 17 492 27 490 l 8 480 18 492 28 492

-9 493 19 493 29 491 10 492 20 493 30 494 31 N/A AD-28A

-(1-77)

l .

! UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-301 '

) UNIT NAME Point Beach Unit 2 REPORT MONTH November, 1981 COMPLETE Fay 1

TELEPHONE 414/277-2811

~

4 u

c u tn o 4 On n oaa Eiw a i

-e n< m a ,1 o oe on e au o 'o v e o ao i No. Date o, eo m oao Licensee Event vm 'o o 'O Cause and Corrective Action N $0 $ d .$ " Report No. NU kr To Prevent Recurrence o- p: o u) c 1 l

lEl 3 O I

b j

)

1 i

i i

i e a E

1 3 4 F: Forced Reason: Method: Exhibit G-Instruc-S: Scheduled A- Equipment Failure (explain) 1- Manual tions for Prepar-B- Maintenance or Test 2- Manual Scram ation of Data Entry i

. C- Refueling 3- Automatic Scram Sheets for LER File:

D- Regulatory Restriction 4- Other (explain) (NUREG-0161)

E- Operator Training & License Exam F- Administrative 5 AD-28B Exhibit I- Same G- Operational Error (explain) Source (01-78) H- Other (explain)

P

~

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No. 50-301 Unit Name Point Beach Unit 2 Date December 10, 1981 Completed By C. W. Fay Telephone 414-277-2811 Unit 2 operated at 490 MNe net throughout the period with two load reductions. Load was reduced to 370 MWe net at 0130 hours0.0015 days <br />0.0361 hours <br />2.149471e-4 weeks <br />4.9465e-5 months <br /> on November 8 for approximately four hours to accommo-date turbine stop. valve testing. Load was reduced by 10 MWe at 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> on November 30 for approximately two hours to accommodate the removal of "A" and "C" moisture separator reheaters from service due to a tube leakage.

There was no safety-related maintenance performed during this period.

w _ _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ . . - _ _ _ _ . _ _ _ _ _ _ _ _ _ . . . _ . _ _ . _ _ _ _ _ _ _ _ . . . _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ . _ _ _ _ _ . _ _ - _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . .__________.-____________.____._______._.______________2