ML20039B169

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Nov 1981
ML20039B169
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/11/1981
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML20039B170 List:
References
NUDOCS 8112220367
Download: ML20039B169 (1)


Text

_

~

a # c@

Q.O'p%Re $3 lHsconsin Electnc macoumr

=

k ck ~.

'6' 231 W. MIChtGAN, P.O. BOX 2046, MILWAUKEE, wt 53201 e

R$

  1. Y
Y v

/

-c(

December 11, Director of Regulatory Operations U.

S. NUCLEAR REGULATORY COMMISSION Washington, D. C.

20555 Gentlemen:

MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of November 1981.

Very truly yours,

,4' h/

1 C. W.

Fay, Director i

Nuclear Power Department Attachments i

Copies to J.

G. Keppler - NRC, Region III NRC Resido:rt Inspector Rie er - PSCW I

a C.

F.

s I

8112220367 8112110 PDR ADOCK 05000266 R

PDR r

.