Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 & 2 (Report 05000327/2016006 and 05000328/2016006)
ML17060A254
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/01/2017
From: Munday J T
Division Reactor Projects II
To: Shea J W
Tennessee Valley Authority
References
IR 2016006
Download: ML17060A254 (6)


Text

March 1, 2017

Mr. Joseph Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801

SUBJECT: ANNUAL ASSESSMENT LETTER FOR SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (REPORT 05000327/2016006 AND 05000328/2016006)

Dear Mr. Shea:

The NRC has completed its end-of-cycle performance assessment of Sequoyah Nuclear Plant Units 1 and 2 and reviewed performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016 through December 31, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The Unplanned Scrams per 7000 Critical Hours PI exceeded the Green-to-White threshold value in the third quarter of 2015. On July 15, 2016, the NRC completed a review of your corrective actions for the White PI using Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area." The NRC's inspection is documented in inspection report (IR) 05000327/2016008 which is publically available in the Agencywide Document Access and Management System using accession number ML16244A370. On November 10, 2016, as a result of our quarterly review of plant performance, which was completed on October 20, 2016, the NRC updated its assessment of Sequoyah Nuclear Plant Unit 1. The NRC's evaluation consisted of a review of performance indicators (PIs) and inspection results. The NRC's review of Sequoyah Nuclear Plant Unit 1's performance identified that the Unplanned Scrams per 7000 Critical Hours PI returned to Green in the third quarter of 2016. Therefore, all the findings and performance indicators that input into the Action Matrix are Green. Accordingly, per the guidance in Inspection Manual Chapter (IMC) 0305, "Operating Reactor Assessment Program," Sequoyah Nuclear Plant Unit 1 transitioned to the Licensee Response Column (Column 1) of the NRC's Action matrix, effective October 1, 2016.

The NRC determined the performance at Sequoyah Nuclear Plant Units 1 and 2 during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC's Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through December 31, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence. The NRC will perform Temporary Instruction (TI) 2515/191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans," beginning March 6, 2017. Additionally, the NRC will perform TI 2515/192, "Inspection of the Licensee's Interim Compensatory Measures Associated with the Open Phase Condition Design Vulnerabilities in Electrical Power Systems," in the first quarter of 2017. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Alan Blamey at 404-997-4415 with any questions you have regarding this letter.

Sincerely,/RA/

Joel T. Munday, Director Division of Reactor Projects Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79

Enclosure:

Sequoyah Inspection/Activity Plan (03/01/2017-12/31/2018) cc Distribution via ListServ SUBJECT: ANNUAL ASSESSMENT LETTER FOR SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (REPORT 05000327/2016006 AND 05000328/2016006) March 1, 2017 DISTRIBUTION: M. Kowal, RII S. Price, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSequoyahResource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO) ADAMS Accession Number: ML OFFICE RII:DRP RII:DRP RII:DRP NAME JSeat ABlamey JMunday DATE 2/22/2017 2/22/2017 2/22/2017 Official Record Copy Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSequoyahInspection / Activity Plan03/01/2017-12/31/2018Page 1 of 302/28/2017 06:59:56TI192-TI192 INSPECTION21,2 IPInspection of the Licensee's Interim Compensatory Measures Associated with the Open Phase Condition2515/19201/01/201703/31/2017TFPI-TRIENNIAL FIRE PROTECTION INSPECTION81,2 IPFire Protection [Triennial]7111105T03/20/201703/24/20171,2 IPFire Protection [Triennial]7111105T04/03/201704/07/2017TI-191-MITIGATING STRATEGIES31,2 IPInspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 20122515/19103/06/201703/10/2017ISI-UNIT 2 IN-SERVICE INSPECTION12 IPInservice Inspection Activities - PWR7111108P05/01/201705/05/2017RP-RAD HAZARDS11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0105/01/201705/05/2017PI&R-PROBLEM IDENTIFICATION AND RESOLUTION51,2 IPProblem Identification and Resolution71152B06/05/201706/09/20171,2 IPProblem Identification and Resolution71152B06/19/201706/23/2017RP-RP PUBLIC RADIATION SAFETY31,2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0607/10/201707/14/20171,2 IPRadiological Environmental Monitoring Program71124.0707/10/201707/14/20171,2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0807/10/201707/14/20171,2 IPPerformance Indicator Verification7115107/10/201707/14/2017EP-EP PROGRAM INSPECTION31,2 IPAlert and Notification System Testing711140209/11/201709/15/20171,2 IPEmergency Preparedness Organization Staffing and Augmentation System711140309/11/201709/15/20171,2 IPEmergency Action Level and Emergency Plan Changes711140409/11/201709/15/20171,2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140509/11/201709/15/20171,2 IPPerformance Indicator Verification7115109/11/201709/15/2017OL EXAM-INITIAL LICENSE EXAM PREP31 SEQUOYAH DECEMBER 2017 INITIAL EXAM AT POWER FACILITIESV2350310/30/201711/03/2017EQI-DESIGN BASES ASSURANCE INSPECTION (PROGR41,2 IPComponent Design Bases Inspection (Programs)7111121N10/30/201711/03/20171,2 IPComponent Design Bases Inspection (Programs)7111121N11/13/201711/17/20171,2 IPComponent Design Bases Inspection (Programs)7111121N12/04/201712/08/2017OL EXAM-INITIAL LICENSE EXAM31 SEQUOYAH DECEMBER 2017 INITIAL EXAM AT POWER FACILITIESV2350312/04/201712/15/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSequoyahInspection / Activity Plan03/01/2017-12/31/2018Page 2 of 302/28/2017 06:59:56ISI-UNIT 1 IN-SERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P04/16/201804/20/2018MODS-PLANT MODIFICATIONS INSPECTION31,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/04/201806/08/2018HS-TRIENNIAL HEAT SINK PERFORMANCE11,2 IPHeat Sink Performance7111107T07/16/201807/20/2018EP-EP EXERCISE81,2 IPExercise Evaluation711140109/17/201809/21/20181,2 IPEmergency Action Level and Emergency Plan Changes711140409/17/201809/21/20181,2 IPDrill/Exercise Performance71151-EP0109/17/201809/21/20181,2 IPERO Readiness71151-EP0209/17/201809/21/20181,2 IPAlert & Notification System Reliability71151-EP0309/17/201809/21/2018OL RQ-REQUAL INSPECTION21,2 IPLicensed Operator Requalification Program7111111B10/08/201810/12/2018ISI-UNIT 2 IN-SERVICE INSPECTION12 IPInservice Inspection Activities - PWR7111108P10/29/201811/02/2018RP-RP OCCUPATIONAL - WEEK 131,2 IPRadiological Hazard Assessment and Exposure Controls71124.0110/29/201811/02/20181,2 IPOccupational ALARA Planning and Controls71124.0210/29/201811/02/20181,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/29/201811/02/20181,2 IPOccupational Dose Assessment71124.0410/29/201811/02/20181,2 IPRadiation Monitoring Instrumentation71124.0510/29/201811/02/20181,2 IPOccupational Exposure Control Effectiveness71151-OR0110/29/201811/02/20181,2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0110/29/201811/02/2018SGISI-UNIT 2 SG IN-SERVICE INSPECTION12 IPInservice Inspection Activities - PWR7111108P11/05/201811/09/2018RP-RP OCCUPATIONAL - WEEK 221,2 IPRadiological Hazard Assessment and Exposure Controls71124.0111/26/201811/30/20181,2 IPOccupational ALARA Planning and Controls71124.0211/26/201811/30/20181,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0311/26/201811/30/20181,2 IPOccupational Dose Assessment71124.0411/26/201811/30/20181,2 IPRadiation Monitoring Instrumentation71124.0511/26/201811/30/20181,2 IPOccupational Exposure Control Effectiveness71151-OR0111/26/201811/30/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSequoyahInspection / Activity Plan03/01/2017-12/31/2018Page 3 of 302/28/2017 06:59:56RP-RP OCCUPATIONAL - WEEK 221,2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0111/26/201811/30/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.