Monthly Operating Repts for Sept 1989 for Point Beach Units 1 & 2.W/891009 Ltr
ML19327A739
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/30/1989
From: Fay C, Krause C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-89-123 VPNPD-89-529, NUDOCS 8910180006
Download: ML19327A739 (9)


Text

T a,-

(#

  • O W PontR coMPANr 231 W. MICHIGAN.P.O BOX 2046. MILWAUKEE,Wi$3201 (414)221 2345 VPNPD-89-529 NRC-89-123 October 9, 1989 U. S. NUCLEAR REGULATORY COMMISSION Document Control Desk Mail Station P1-137 Washington, D. C. 20555 Gentlement DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS y-POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 '

Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of September 1989.

- Very truly yours, l

~

L C. . Fay l Vice President Nuclear Power Attachments Copies to R. S. Cullen, PSCW NRC Regional Administrator, Region III NRC Resident Inspector

[t:7T 8910180006 890930 PDR R' ADOCK 05000266 PDC

~~~

.-]

OPERATING DATA REPORT DOCKET NO. 50-266 DATE October 5, 1989 COMPLETED BY C. W. KRAUSE TELEPHONE 414 221 2001 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1 . NOTES .
2. REPORTING PERIOD: SEPTEMBER 1989 . .
3. LICENSED THERMAL POWER (MWT): 1518. . .
4. NAMEPLATE RATING (GROSS MWE): 523.8 . .
5. DESIGN ELECTRICAL RATING (NET MWE): 497. . .
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509. . .
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485. . . . . . . . . . . . . . . . . . . . . . . . .
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NOT APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 720 6,551 165,695
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 5,519.3 136,134.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 652.T
14. HOURS GENERATOR ON LINE 720.0 5,497.8 133,330.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 837.9
16. GROSS THERMAL ENERGY GENERATED (MWH) 951,439 7,827,128 185,169,952
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 314,880 2,647,700 62,476,750
18. NET ELECTRICAL ENERGY GENERATED (MWH) 299,782 2,526,862 59,511,330
19. UNIT SERVICE FACTOR 100.0 83.9 80.5
20. UNIT AVAILABILITY FACTOR 100.0 83.9 81.0
21. UNIT CAPACITY FACTOR (USING MDC NET) 85.8 79.5 73.6
22. UNIT CAPACITY FACTOR (USING DER NET) 83.8 77.6 72.3
23. UNIT FORCED OUTAGE RATE O.0 0.0 1.9
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

NONE

25. IF SHUTDOWN AT END OF REPORT PERIOD, E.*TIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FAC'iORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

. El DOCKET NOo 50-266 .

UNIT NAME Point Beach, Unit 1 DATE October 4, 1989 ~

COMPLETED BY C. W. Krause TELEPHONE 414/221-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH SEPTEMBER 1989 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 489 11 421 21 495 2 254 12 491 22 495 3 225 13 489 23 231 4 228 14 489 24 213 5 452 15 489 25 449 6 494 16 484 26 495 7 497 17 470 27 496 8 495 18 492 28 496 9 232 19 494 29 496 10 204 20 495 30 242 EQR-28a (04-86)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-266- .

i UNIT NAME Foint Beach Unit 1-DATE October 5, 1989 REPORT MONTH SEPTEMBER 1989 COMPLETED BY C. W. Krause TELEPHONE 414/221-2001 c

s #

o Ca es 4-1 Q es d om C o 54 .

~

. t$

eo 2

e co ES P. 8 ".

a.TJ No. Date g -4 o Licensee Event 40 Cause & Corrective Action E.4 $3 $ '3$$ Report No. $O $0 To Prevent Recurrence a gym m o m

6 890902 S O F 5 Not applicable ZZ ZZ4 m Load reduced to low electrical demand and nuclear fuel conservation.

7 890909 S O F 5 Not applicable ZZ ZZZZZZ Load reduced to low electrical demand and nuclear fuel conservation.

8 890923 S O F 5 Not applicable ZZ ZZZZZZ Load reduced to low electrical demand and nuclear fuel conservation.

9 890930 S O F 5 Not applicable ZZ ZZZZZZ Load reduced to low electrical demand and nuclear fuel conservation.

1F: Forced 2 Reason: 3 Method: 4 Exhibit F-Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Test 2 - Mancal Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced Load SExhibit H-Same Source F - Administrative 6 - Other (explain) 4 G - Operational Error (explain)

H - Other (explain)

EQR-28B (04-87)

F s

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE t Docket No. 50-266  :

Unit Name Point Beach Unit 1 Date October 5, 1989

! '. Completed By C. W. Krause Telephone 414/221-2001  ;

Unit 1 operated at approximately 494 MWe net throughout the .

report period with the exception of four significant load t-reductions. The load reductions were the result of low '

system demand in conjunction with nuclear fuel Conservation.

's> -

- ,  %, x .. .

yT; . 3

% i o, - $$

OPERATING DATA REPORT '

.f DOCKET NO. 50-301

.=

DATE ' October 5,:1989 COMPLETED BY. C. W. KRAUSE TELEPHONE 414.221 2001 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2 . NOTES .
2. REPORTING PERIODt SEPTEMBER 1989, . .
3. LICENSED THERMAL POWER (MWT): 1518. . .

'4. NAMEPLATE RATING (GROSS MWE): 523.8 . .

5. DESIGN ELECTRICAL RATING (NET MWE): 497.  :. .
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509. . .
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485. . . . . . . . . . . . . . . . . . . . . . . . . . w ...;
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SIMCE LAST REPORT, GIVE REASONE:

NOT APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY'(NET MWE):- NOT APPLICABLE
10. REASONS FOR. RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 720 6,551 150,480
12. NUMBER OF HOURS REACTOR WAS CRITICAL 535.0 6,331.6 132,433.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.6 216.7
14. HOURS GENERATOR ON LINE 530.0 6,232.7 130,329.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 4.8 3G2.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 776,156 9,372,685 185,318,519
17. GROSS ELECTRICAL ENERGY GENERATED-(MWH) 265,520 3,216,010 62.889,710
18. NET ELECTRICAL ENERGY GENERATED (MWH) 252,200 3,C70,816 59,925,238
19. UNIT SERVICE FACTOR 73.6 95.1 86.6
20. UNIT AVAILABILITY FACTOR 73.6 95.2 86.8
21. UNIT CAPACITY FACTOR (USING MDC NET) 72.2 96.7 81.4
22. UNIT CAPACITY FACTOR (USING DER NET) 70.6 94.3 80.1-
23. UNIT FORCED OUTAGE RATE O.0 2.0 1.2
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

FONE

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:. November 10, 1989 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 .;

.a

~ _ . _ - _ . - , - - . ,. .

5 DOCKET NO. 50-301 .

UNIT NAME Point Beach, Unit- 2 DATE October 5, 1989

' COMPLETED BY C.-W. Kraure TELEPHONE 414/221-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH SEPTEMBER 1989 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 496 11 478 21 461 2 494 12 480 22 423 3 493 13 475 23 -12 4 498 14 473 24 -16 5 502 15 470 25 -10 6 499 16 468 26 -2 7 500 17 467 27 -2 8 498 18 466 28 0 9 492 19 465 29 -2 10 493 20 464 30 -2 EQR-28a (04-86)

a UNIT SHUTDOWNS AND POWER REDUCTIONS- DOCKET NO. 50-301 UNIT NAME Point Beach Unit 2 DATE October 8, 1989 REPORT MONTH SEPTEMBER 1989 COMPLETED BY C. W. Krause TELEPHONE 414/221-2001 1 c

o o ca a u no c om c o 4 e

- -4 u o tr o E, cc-e av a oca ee oo . .

No. Date g eo e o -4 o Licensee Event ue o,-J Cause & Corrective Action g $3 $ $0, Report No. EO @O To Prevent Recurrence o e o a: m o E .c m

4 890923 5 190 C 1 Not Applicable ZZ ZZZZZZ Commence annual refueling and maintenance outage.

1F: Forced 2 Reason: 3 Method: 4 Exhibit F-Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Test 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-Ol61)

D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced Load SExhibit H-Same Source F - Administrative 6 - Other (explain)

G - Operational Error (explain)

H -_Other (explain)

EQR-28B (00-87)

..~~

NARRATIVE

SUMMARY

OF OPERATING E.3PERIENCE Docket No. 50-301 Unit Name Point Beach Unit 2 Date October 5, 1989 Completed By C. W. Krause Telephone 414/221-2001 Unit 2 operated at approximately 497 MWe net until September 8, i 1989 when the unit went into the end-of-life stretch operation.

Power level decreased slightly from that point until September 23, 1989, where the unit was taken off line for its annual refueling and maintenance outage.

i Major outage work includes replacing approximately 16 blades in the No. 2 low pressure turbine, replacing the axle and bearings in the turbine building crane, performing the 10-year reactor >

vessel inspection, and hydro testing the reactor coolant system, ,

safety injection system, and residual heat removal system.

The station battery, D06, is also scheduled to be replaced this outage.

The containment integrated leak rate test was successfully completed. Steam generator work includes eddy current, sleeving, plug repair, and sludge lancing.

l i

t