PPL Susquehanna, Unit 2 - Revisions to Technical Specifications Bases Unit 2 Manual
ML12130A219
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 04/28/2012
From:
Susquehanna
To: Gerlach R
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML12130A219 (39)


Text

Apr. 28, 2012 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2012-27061 USER INFORMATION:

GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:

TO: GERLACH*ROSE M 04/28/2012 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TSB2 - TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL REMOVE MANUAL TABLE OF CONTENTS DATE: 04/19/2012 ADD MANUAL TABLE OF CONTENTS DATE: 04/27/2012 CATEGORY: DOCUMENTS TYPE: TSB2 4co--N

Apr. 28, 2012 Page 2 of 2 ID: TEXT 3.7.1 REMOVE: REV:4 ADD: REV: 5 CATEGORY: DOCUMENTS TYPE: TSB2 ID: TEXT 3.8.7 REMOVE: REV:3 ADD: REV: 4 CATEGORY: DOCUMENTS TYPE: TSB2 ID: TEXT LOES REMOVE: REV:108 ADD: REV: 109 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SSES MANUAL~

Manual Name: TSB2 Manual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL Table Of Contents Issue Date: 04/27/2012 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 109 04/27/2012

Title:

LIST OF EFFECTIVE SECTIONS TEXT TOC 18 09/01/2010

Title:

TABLE OF CONTENTS TEXT 2. 1.1 4 05/06/2009

Title:

SAFETY LIMITS (SLS) REACTOR CORE SLS TEXT 2.1.2 1 10/04/2007

Title:

SAFETY LIMITS (SLS) REACTOR COOLANT SYSTEM (RCS) PRESSURE SL TEXT 3.0 3 08/20/2009

Title:

LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY TEXT 3. 1.1 1 03/24/2005

Title:

REACTIVITY CONTROL SYSTEMS SHUTDOWN MARGIN (SDM)

TEXT 3.1.2 0 11/18/2002

Title:

REACTIVITY CONTROL SYSTEMS REACTIVITY ANOMALIES TEXT 3.1.3 2 01/19/2009

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD OPERABILITY TEXT 3.1.4 4 01/30/2009

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM TIMES TEXT 3.1.5 1 07/06/2005

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS TEXT 3.1.6 2 03/24/2005

Title:

REACTIVITY CONTROL SYSTEMS ROD PATTERN CONTROL Report Date: 04/28/12 Pagel Page I ~

of 8 8 Report Date: 04/28/12

SSES MANUAL Manual Name: TSB2 Manual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.1.7 3 10/04/2007

Title:

REACTIVITY CONTROL SYSTEMS STANDBY LIQUID CONTROL (SLC) SYSTEM TEXT 3.1.8 3 05/06/2009

Title:

REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES TEXT 3.2.1 4 05/06/2009

Title:

POWER DISTRIBUTION LIMITS AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)

TEXT 3.2.2 3 05/06/2009

Title:

POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR)

TEXT 3.2.3 2 05/06/2009

Title:

POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE LHGR TEXT 3.3.1.1 4 05/06/2009

Title:

INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT 3.3.1.2 2 01/19/2009

Title:

INSTRUMENTATION SOURCE RANGE MONITOR (SRM) INSTRUMENTATION TEXT 3.3.2.1 2 04/09/2007

Title:

INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.3.2.2 2 02/22/2012

Title:

INSTRUMENTATION FEEDWATER - MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION TEXT 3.3.3.1 7 10/27/2008

Title:

INSTRUMENTATION POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT 3.3.3.2 1 .. 04/18/2005

Title:

INSTRUMENTATION REMOTE SHUTDOWN SYSTEM TEXT 3.3.4.1 1 05/06/2009

Title:

INSTRUMENTATION END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATIO0 Page 2 of 8 Report Date: 04/28/12

SSES MANTJAI.

Manual Name: TSB2 Manual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.3.4.2 0 11/18/2002

Title:

INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION TEXT 3.3.5.1 4 08/20/2009

Title:

INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION TEXT 3.3.5.2 0 11/18/2002

Title:

INSTRUMENTATION REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM INSTRUMENTATION TEXT 3.3.6.1 4 05/06/2009

Title:

INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.6.2 4 09/01/2010

Title:

INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.7.1 2 10/27/2008

Title:

INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM INSTRUMENTATION TEXT 3.3.8.1 3 12/17/2007

Title:

INSTRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION TEXT 3.3.8.2 0 11/18/2002

Title:

INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING TEXT 3.4.1 4 07/20/2010

Title:

REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING TEXT 3.4.2 2 07/20/2010

Title:

REACTOR COOLANT SYSTEM (RCS) JET PUMPS TEXT 3.4.3 3 01/13/2012

Title:

REACTOR COOLANT SYSTEM (RCS) SAFETY/RELIEF VALVES (S/RVS)

TEXT 3.4.4 0 (S 11/18/2002

Title:

REACTOR COOLANT SYSTEM (RCS) RCS OPERATIONAL LEAKAGE Report Date: 04/28/12 Page 3. of of 88 Page3 Report Date: 04/28/12

SSES MANUAL Manual Name: TSB2 Manual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.4.5 3 03/10/2010

Title:

REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE TEXT 3.4.6 3 01/25/2011

Title:

REACTOR COOLANT SYSTEM (RCS) RCS LEAKAGE DETECTION INSTRUMENTATION TEXT 3.4.7 2 10/04/2007

Title:

REACTOR COOLANT SYSTEM (RCS) RCS SPECIFIC ACTIVITY TEXT 3.4. 8 1 04/18/2005

Title:

REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM

- HOT SHUTDOWN TEXT 3.4.9 0 11/18/2002

Title:

REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM

- COLD SHUTDOWN TEXT 3.4.10 3 05/06/2009 i

Title:

REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE AND TEMPERATURE (P/T) LIMITS TEXT 3.4.11 0 11/18/2002

Title:

REACTOR COOLANT SYSTEM (RCS) REACTOR STEAM DOME PRESSURE TEXT 35.1 3 01/16/2006

Title:

EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)

SYSTEM ECCS - OPERATING TEXT 3.5.2 0 11/18/2002

Title:

EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)

SYSTEM ECCS - SHUTDOWN TEXT 3.5.3 2 07/09/2010

Title:

EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)

SYSTEM RCIC SYSTEM TEXT 3.6.1.1 4 11/09/2011

Title:

PRIMARY CONTAINMENT TEXT 3.6.1.2 1 05/06/2009

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT AIR LOCK Report Date: 04/28/12 Page44 Page of of 8

.8 Report Date: 04/28/12

SSES MANUAL Manual Name: TSB2 Manual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.6.1.3 11 04/14/2010

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES (PCIVS)

TEXT 3.6.1.4 1 05/06/2009

Title:

CONTAINMENT SYSTEMS CONTAINMENT PRESSURE TEXT 3.6.1.5 1 10/05/2005

Title:

CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE TEXT 3.6.1.6 0 11/18/2002

Title:

CONTAINMENT SYSTEMS SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKERS TEXT 3.6.2.1 2 12/17/2007

Title:

CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE TEXT 3.6.2.2 0 11/18/2002

Title:

CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL TEXT 3.6.2.3 1 01/16/2006

Title:

CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL COOLING TEXT 3.6.2.4 0 11/18/2002

Title:

CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY TEXT 3.6.3.1 2 06/13/2006

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT HYDROGEN RECOMBINERS TEXT 3.6.3.2 1 04/18/2005

Title:

CONTAINMENT SYSTEMS DRYWELL AIR FLOW SYSTEM TEXT 3.6.3.3 0 11/18/2002

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION TEXT 3.6.4.1 8 03/26/2012

Title:

CONTAINMENT SYSTEMS SECONDARY CONTAINMENT Report Date: 04/28/12 Pages Page 5 of of 88 Report Date: 04/28/12

SSES MANUAL Manual Name: TSB2 Manual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.6.4.2 5 04/10/2012

Title:

CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS)

TEXT 3.6.4.3 4 09/21/2006

Title:

CONTAINMENT SYSTEMS STANDBY GAS TREATMENT (SGT) SYSTEM TEXT 3.7.1 5 04/27/2012

Title:

PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW) SYSTEM AND THE ULTIMALTE HEAT SINK (UHS)

TEXT 3.7.2 2 05/02/2008

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM TEXT 3.7.3 1 01/08/2010

Title:

PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM TEXT 3.7.4 0 11/18/2002

Title:

PLANT SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM TEXT 3.7.5 1 10/04/2007

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS TEXT 3.7.6 3 01/25/2011

Title:

PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM TEXT 3.7.7 1 10/04/2007

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL TEXT 3.8.1 8 05/06/2009

Title:

ELECTRICAL POWER SYSTEMS AC SOURCES - OPERATING TEXT 3.7.8 0 05/06/2009

Title:

MAINE TURBINE PRESSURE REGULATION SYSTEM TEXT 3.8.2 0 11/18/2002

Title:

ELECTRICAL POWER SYSTEMS AC SOURCES - SHUTDOWN Report Date: 04/28/12 Page66 Page of of 88 Report Date: 04/28/12

SSES MANUAL Manual Name: TSB2 Manual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.8.3 2 04/14/2010

Title:

ELECTRICAL POWER SYSTEMS DIESEL FUEL OIL LUBE OIL AND STARTING AIR TEXT 3.8.4 3 01/19/2009

Title:

ELECTRICAL POWER SYSTEMS DC SOURCES - OPERATING TEXT 3.8.5 1 12/14/2006

Title:

ELECTRICAL POWER SYSTEMS DC SOURCES - SHUTDOWN TEXT 3.8.6 1 12/14/2006

Title:

ELECTRICAL POWER SYSTEMS BATTERY CELL PARAMETERS TEXT 3.8.7 4 04/27/2012

Title:

ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS - OPERATING TEXT 3.8.8 0 11/18/2002

Title:

ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS - SHUTDOWN TEXT 3.9.1 0 11/18/2002

Title:

REFUELING OPERATIONS REFUELING EQUIPMENT INTERLOCKS TEXT 3.9.2 1 09/01/2010

Title:

REFUELING OPERATIONS REFUEL POSITION ONE-ROD-OUT INTERLOCK TEXT 3.9.3 0 11/18/2002

Title:

REFUELING OPERATIONS CONTROL ROD POSITION TEXT 3.9.4 0 11/18/2002

Title:

REFUELING OPERATIONS CONTROL ROD POSITION INDICATION TEXT 3.9.5 0 11/18/2002

Title:

REFUELING OPERATIONS CONTROL ROD OPERABILITY - REFUELING TEXT 3.9.6 1 10/04/2007

Title:

REFUELING OPERATIONS REACTOR PRESSURE VESSEL (RPV) WATER LEVEL Report Date: 04/28/12 Page 2 7 of of 88 Report Date: 04/28/12

SSES MANUAL Manual Name: TSB2 Manual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.9.7 0 11/18/2002

Title:

REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - HIGH WATER LEVEL TEXT 3.9.8 0 11/18/2002

Title:

REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR).- LOW WATER LEVEL TEXT 3.10.1 1 01/23/2008

Title:

SPECIAL OPERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION TEXT 3.10.2 0 11/18/2002

Title:

SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING TEXT 3.10.3 0 11/18/2002

Title:

SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - HOT SHUTDOWN TEXT 3.10.4 0 11/18/2002

Title:

SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL COLD SHUTDOWN TEXT 3.10.5 0 11/18/2002

Title:

SPECIAL OPERATIONS SINGLE CONTROL ROD DRIVE,(CRD) REMOVAL - REFUELING TEXT 3.10.6 0 11/18/2002

Title:

SPECIAL OPERATIONS MULTIPLE CONTROL ROD WITHDRAWAL - REFUELING TEXT 3.10.7 1 03/24/2005

Title:

SPECIAL OPERATIONS CONTROL ROD TESTING - OPERATING TEXT 3.10.8 2 04/09/2007

Title:

SPECIAL OPERATIONS SHUTDOWN MARGIN (SDM) TEST REFUELING Report Date: 04/28/12 Page88 Page of of 8

.8 Report Date: 04/28/12

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision TOC Table of Contents 18 B 2.0 SAFETY LIMITS BASES Page TS / B2.0-1 1 Pages TS / B 2.0-2 and TS / B 2.0-3 4 Page TS/B 2.0-4 6 Pages TS / B 2.0-5 through TS / B 2.0-8 1 B 3.0 LCO AND SR APPLICABILITY BASES Page TS / B 3.0-1 1 Pages TS / B 3.0-2 through TS / B 3.0-4 0 Pages TS / B 3.0-5 through TS / B 3.0-7 1 Page TS / B 3.0-8 3 Pages TS / B'3.0-9 through Page TS / B 3.0-11 2 Page TS / B 3.0-1 la 0 Page TS / B 3.0-12 1 Pages TS / B 3.0-13 through TS / B 3.0-15 2 Pages TS / B 3.0-16 and TS / B 3.0-17 0 B 3.1 REACTIVITY CONTROL BASES Pages B 3.1-1 through B 3.1-4 0 Page TS / B 3.1-5 1 Pages TS / B 3.1-6 and TS / B 3.1-7 2 Pages B 3.1-8 through B 3.1-13 0 Page TS / B 3.1-14 1 Page TS / B 3.1-15 0 Page TS / B 3.1-16 1 Pages TS / B 3.1-17 through TS / B 3.1-19 0 Pages TS / B 3.1-20 and TS / B 3.1-21 1 Page TS / B 3.1-22 0 Page TS / B 3.1-23 1 Page TS / B 3.1-24 0 Pages TS / B.3.1-25 through TS / B 3.1-27 1 Page TS / B 3.1-28 2 Page TS / 3.1-29 1 Pages B 3.1-30 through B 3.1-33 0 Pages TS / B 3.1.34 through TS / B 3.1-36 1 Pages TS / B 3.1-37 and TS / B 3.1-38 2 Pages TS / B 3.1-39 and TS / B 3.1-40 2 Page TS / B 3.1-40a 0 Page TS / B 3.1-41 1 Page TS / B 3.1-42 2 Revision 109 TSIBLOES-1 UNIT 2 SUSQUEHANNA - UNIT SUSQUEHANNA- 2 TS / B LOES-1 Revision 109

SUSQUEHANNA STEAM ELECTRIC STATION LIST OFEFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Pages TS / B 3.1-43 1 Page TS / B 3.1-44 0 Page TS / B 3.1-45 3 Page TS / B 3.1-46 0 Page TS / B 3.1-47 1 Pages TS / B 3.1-48 and TS / B 3.1-49 1 Page B 3.1-50 0 Page TS / B 3.1-51 3 B 3.2 POWER DISTRIBUTION LIMITS BASES Pages TS / B 3.2-1 and TS / B 3.2-2 2 Page TS / B 3.2-3 4 Page TS / B 3.2-4 1 Page TS / B 3.2-5 3 Page TS / B 3.2-6 4 Page TS / B 3.2-7 3 Pages TS / B 3.2-8 and TS / B 3.2-9 4 Pages TS / B 3.2-10 through TS / B 3.2-12 2 Page TS / B 3.2-13 1 B 3.3 INSTRUMENTATION Pages TS / B 3.3-1 through TS / B 3.3-4 1 Page TS / B 3.3-5 2 Page TS / B 3.3-6 1 Page TS / B 3.3-7 3 Page TS / B 3.3-8 4 Pages TS / B 3.3-9 through TS / B 3.3-13 3 Page TS / B 3.3-14 4 Pages TS / B 3.3-15 and TS / B 3.3-16 2 Pages TS / B 3.3-17 through TS / B 3.3-21 3 Pages TS / B 3.3-22 through TS / B 3.3-27 2 Page TS / B 3.3-28 3 Page TS / B 3.3-29 4 Pages TS / B 3.3-30 and TS / B 3.3-31 3 Pages TS / B 3.3-32 and TS / B 3.3-33 4 Page TS / B 3.3-34 2 Page TS / B 3.3-34a 1 Pages TS / B 3.3-34b through TS / B 3.3-34d 0 Page TS / B 3.3-34e 1 Pages TS / B 3.3-34f through TS / B 3.3-34i 0 Pages TS / B 3.3-35 and TS / B 3.3-36 2 Pages TS / B 3.3-37 and TS / B 3.3-38 1 Revision 109 TS/B LOES-2 UNIT 2 SUSQUEHANNA - UNIT SUSQUEHANNA 2 TS / B LOES-2 Revision 109

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Page TS / B 3.3-39 2 Pages TS / B 3.3-40 through TS / B 3.3-43 2 Pages TS / B 3.3-44 through TS / B 3.3-54 3 Pages TS / B 3.3-54a through TS / B 3.3-54e 0 Page TS / B 3.3-55 2 Page TS / B 3.3-56 0 Page TS / B 3.3-57 1 Page TS / B 3.3-58 0 Page TS / B 3.3-59 1 Page TS / B 3.3-60 0 Page TS / B 3.3-61 1 Pages TS / B 3.3-62 and TS / B 3.3-63 0 Pages TS / B 3.3-64 and TS / B 3.3-65 2 Page TS / B 3.3-66 4 Page TS / B 3.3-67 3 Page TS / B 3.3-68 4 Page TS / B 3.3.69 5 Page TS / B 3.3-70 4 Page TS / B 3.3-71 3 Pages TS / B 3.3-72 and TS / B 3.3-73 2 Page TS / B 3.3-74 3 Page TS / B 3.3-75 2 Pages TS / B 3.3-75a and TS / B 3.3-75 b 6 Page TS / B 3.3-75c 5 Pages B 3.3-76 and TS / B 3.3-77 0 Page TS / B 3.3-78 1 Pages B 3.3-79 through B 3.3-81 0 Page TS / B 3.3-82 1 Page B 3.3-83 0 Pages TS / B 3.3-84 and TS / B 3.3-85 1 Page 3.3-86 0 Page TS / B 3.3-87 1 Page B 3.3-88 0 Page TS / B 3.3-89 1 Pages B 3.3-90 and B 3.3-91 0 Pages TS / B 3.3-92 through TS / B 3.3-103 1 Page TS / B 3.3-104 3 Pages TS / B 3.3-105 and TS / B 3.3-106 1 Page TS / B 3.3-107 2 Page TS / B 3.3-108 1 Page TS / B 3.3-109 2 Pages TS / B 3.3-110 through TS / B 3.3-112 1 Page TS / B 3.3-113 2 SUSQUEHANNA - UNIT 2 TS / B LOES-3 Revision 109

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Page TS / B 3.3-114 1 Page TS / B 3.3-115 2 Page TS / B 3.3-116 3 Pages TS / B 3.3-117 and TS / B 3.3-118 2 Pages TS / B 3.3-119 through TS / B 3.3-120 1 Pages TS / B 3.3-121 and TS / B 3.3-122 2 Page TS / B 3.3-123 1 Page TS / B 3.3-124 2 Page TS / B 3.3-124a 0 Page TS / B 3.3-125 1 Page TS / B 3.3-126 2 Page TS / B 3.3-127 3 Page TS / B 3.3-128 2 Pages TS / B 3.3-129 through TS / B 3.3-131 1 Page TS / B 3.3-132 2 Pages TS/B 3.3-133 and TS/B 3.3-134 1 Pages B 3.3-135 through B 3.3-137 0 Page TS / B 3.3-138 1 Pages B 3.3-139 through B 3.3-149 0 Pages TS/ B 3.3-150 and TS / B 3.3-151 1 Pages TS / B 3.3-152 through TS / B 3.3-154 2 Page TS / B 3.3-155 1 Pages TS / B 3.3-156 through TS / B 3.3-158 2 Pages TS / B 3.3-159 through TS / B 3.3-161 1 Page TS / B 3.3-162 1 Page TS / B 3.3-163 2 Page TS / B 3.3-164 1 Pages TS / B 3.3-165 and TS/B 3.3-166 2 Pages TS / B 3.3-167 and TS/B 3.3-168 1 Pages TS / B 3.3-169 and TS/B 3.3-170 2 Pages TS / B 3.3-171 through TS / B 3.3-177 1 Page TS / B 3.3-178 2 Page TS / B 3.3-179 3 Page TS / B 3.3-179a 2 Page TS / B 3.3-180 1 Page TS / B 3.3-181 3 Page TS / B 3.3-182 1 Page TS / B 3.3-183 2 Page TS / B 3.3-184 1 Page TS / B 3.3-185 4 Page TS / B 3.3-186 1 Pages TS / B 3.3-187 and TS /B 3.3-188 2 Pages TS / B 3.3-189 through TS / B 3.3-191 1 TS/BLOES-4 Revision 109 UNIT 2 SUSQUEHANNA - UNIT 2 TS / B LOES-4 Revision 109

SUSQUEHANNA STEAM ELECTRIC STATION LIST OFEFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Page TS / B 3.3-192 0 Page TS / B 3.3-193 1 Pages TS / B 3.3-194 and TS / B 3.3-195 0 Page TS / B 3.3-196 2 Pages TS / B 3.3-197 through TS / B 3.3-205 0 Page TS / B 3.3-206 1 Pages B 3.3-207 through B 3.3-209 0 Page TS / B 3.3-210 1 Page TS / B 3.3-211 2 Pages TS / B 3.3-212 and TS / B 3.3-213 1 Pages B 3.3-214 through B 3.3-220 0 B 3.4 REACTOR COOLANT SYSTEM BASES Pages TS / B 3.4-1 and TS / B 3.4-2 2 Pages TS / B 3.4-3 through TS / B 3.4-5 4 Pages TS / B 3.4-6 through TS / B 3.4-9 3 Page TS / B 3.4-10 1 Pages TS / B 3.4-11 and TS / B 3.4-12 0 Page TS / B 3.4-13 1 PageTS / B 3.4-14 0 Page TS / B 3.4-15 2 Pages TS / B 3.4-16 and TS / B 3.4-17 4 Page TS / B 3.4-18 2 Pages B 3.4-19 through B 3.4-23 0 Pages TS / B 3.4-24 through TS / B 3.4-27 0 Page TS / B 3.4-28 1 Page TS / B 3.4-29 3 Page TS / B 3.4-30 1 Page TS / B 3.4-31 0 Pages TS / B 3.4-32 and TS / B 3.4-33 1 Page TS / B 3.4-34 0 Pages TS / B 3.4-35 and TS / B 3.4-36 1 Page TS / B 3.4-37 2 Page B 3.4-38 1 Pages B 3.4-39 and B 3.4-40 0 Page TS / B 3.4-41 1 Pages B 3.4-42 through B 3.4-48 0 Page TS / B 3.4-49 3 Pages TS / B 3.4-50 through TS / B 3.4-52 2 Page TS / B 3.4-53 1 Pages TS / B 3.4-54 through TS / B 3.4-57 2 Pages TS / B 3.4-58 through TS / B 3.4-60 1 Revision 109 TSIB LOES-5 SUSQUEHANNA-UNIT2 SUSQUEHANNA - UNIT 2 TS / B LOES-5 Revision 109

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision B 3.5 ECCS AND RCIC BASES Pages TS / B 3.5-1 and TS / B 3.5-2 1 Pages TS / B 3.5-3 through TS / B 3.5-6 2 Pages TS / B 3.5-7 through TS / B 3.5-10 1 Pages TS / B 3.5-11 and TS / B 3.5-12 2 Pages TS / B 3.6-13 and TS / B 3.5-14 1 Pages TS / B 3.5-15 and TS / B.3.5-16 2 Page TS / B 3.5-17 3 Page TS / B 3.5-18 1 Pages B 3.5-19 through B 3.5-24 0 Pages TS / B 3.5-25 through TS / B 3.5-27 1 Page TS / B 3.5-28 0 Page TS / B 3.5-29 1 Pages TS / B 3.5-30 and TS / B 3.5-31 0 B 3.6 CONTAINMENT SYSTEMS BASES Page TS / B 3.6-1 2 Page TS / B 3.6-1a 3 Page TS / B 3.6-2 4 Page TS / B 3.6-3 3 Page TS / B 3.6-4 4 Page TS / B 3.6-5 3 Page TS / B 3.6-6 4 Pages TS / B 3.6-6a and TS /B 3.6-6b 3 Page TS / B 3.6-6c 0 Page B 3.6-7 0 Page TS / 3.6-8 1 Pages B 3.6-9 through B 3.6-14 0 Page TS / B 3.6-15 3 Page TS / B 3.6-15a 0 Page TS / B 3.6-15b 3 Pages TS / B 3.6-16 and TS / B 3.6-17 2 Page TS / B 3.6-17a 0 Pages TS / B 3.6-18 and TS / B 3.6-19 1 Page TS / B 3.6-20 2 Page TS / B 3.6-21 3 Pages TS / B 3.6-21a and TS / B 3.6-21b 0 Pages TS / B 3.6-22 and TS / B 3.6-23 2 Pages TS / B 3.6-24 and TS / B 3.6-25 1 Pages TS / B 3.6-26 and TS / B 3.6-27 3 Page TS / B 3.6-28 7 SUSQUEHANNA - UNIT 2 TS / B LOES-6 Revision 109

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Page TS / B 3.6-29 5 Page TS / B 3.6-29a 0 Page TS / B 3.6-30 2 Page TS / B 3.6-31 3 Pages TS / B 3.6-32 and TS / B 3.6-33 2 Page TS / B 3.6-34 1 Page TS / B 3.6-35 3 Pages TS / B 3.6-36 and TS / B 3.6-37 2 Page TS / B 3.6-38 3 Page TS / B 3.6-39 7 Page TS / B 3.6-40 1 Pages B 3.6-41 and B 3.6-42 0 Pages TS / B 3.6-43 and TS / B 3.6-44 1 Page TS / B 3.6 2 Pages TS / B 3.6-46 through TS / B 3.6-50 1 Page TS / B 3.6-51 2 Pages B 3.6-52 through B 3.6-55 0 Pages TS / B 3.6-56 and TS / B 3.6-57 2 Pages B 3.6-58 through B 3.6-62 0 Pages TS / B 3.6-63 and TS / B 3.6-64 1 Pages B 3.6-65 through B 3.6-68 0 Pages B 3.6-69 through B 3.6-71 1 Page TS / B 3.6-72 2 Pages TS / B 3.6-73 and TS / B 3.6-74 1 Pages B 3.6-75 and B 3.6-76 0 Page TS / B 3.6-77 1 Pages B 3.6-78 through B 3.6-82 0 Page TS / B 3.6-83 4 Page TS / B 3.6-84 2 Page TS / B 3.6-85 4 Page TS / B 3.6-86 through TS / B 3.6-87a 2 Page TS / B 3.6-88 4 Page TS / B 3.6-89 2 Pages TS / B 3.6-90 and TS / B 3.6-91 3 Page TS / B 3.6-92 2 Pages TS / B 3.6-93 through TS / B 3.6-95 1 Page TS / B 3.6-96 2 Pages TS / B 3.6-97 and TS / B 3.6-98 1 Page TS / B 3.6-99 5 Page TS / B 3.6-99a 2 Page TS / B 3.6-99b 1 Pages TS / B 3.6-100 and TS / B 3.6-101 1 Pages TS / B 3.6-102 and TS / B 3.6-103 2 Page TS / B 3.6-104 3 LOES-7 Revision 109 TS/B SUSQUEHANNA - UNIT SUSQUEHANNA -

UNIT 2 2 TS / B LOES-7 Revision 109

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Page TS / B 3.6-105 2 Page TS / B 3.6-106 3 B 3.7 PLANT SYSTEMS BASES Page TS / B 3.7-1 3 Page TS / B 3.7-2 4 Pages TS / B 3.7-3 through TS / B 3.7-5 3 Page TS / B 3.7-5a 2 Page TS / B 3.7-6 4 Page TS / B 3.7-6a 3 Page TS / B 3.7-6b 2 Page TS / B 3.7-6c 3 Page TS / B 3.7-7 3 Page TS / B 3.7-8 2 Pages B 3.7-9 through B 3.7-11 0 Pages TS / B 3.7-12 and TS / B 3.7-13 2 Pages TS / B 3.7-14 through TS / B 3.7-18 3 Page TS / B 3.7-18a 1 Pages TS / B 3.7-18b through TS / B 3.7-18e 0 Pages TS / B 3.7-19 through TS / B 3.7-24 1 Pages TS / B 3.7-25 and TS / B 3.7-26 0 Page TS / B 3.7-27 4 Pages TS / B 3.7-28 and TS / B 3.7-29 3 Pages TS / B 3.7-30 and TS / B 3.7-31 1 Page TS / B 3.7-32 0 Page TS / B 3.7-33 1 Pages TS / B 3.7-34 through TS / B 3.7-37 0 B 3.8 ELECTRICAL POWER SYSTEMS BASES Page TS / B 3.8-1 1 Pages B 3.8-2 and B 3.8-3 0 Page TS / B 3.8-4 1 Pages TS / B 3.8-4a and TS /B 3.8-4b 0 Pages TS / B 3.8-5 and TS / B 3.8-6 3 Page TS / B 3.8-6a 1 Pages B 3.8-7 and B 3.8-8 0 Page TS / B 3.8-9 2 Pages TS / B 3.8-10 and TS / B 3.8-11 1 Pages B 3.8-12 through B 3.8-18 0 Page TS / B 3.8-19 1 Pages B 3.8-20 through B 3.8-22 0 Page TS / B 3.8-23 1 Page B 3.8-24 0 Pages TS / B 3.8-25 and TS / B 3.8-26 1 SUSQUEHANNA - UNIT 2 TS / B LOES-8 Revision 109

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Pages B 3.8-27 through B 3.8-35 0 Page TS / B 3.8-36 1 Page TS / B 3.8-37 0 Page TS / B 3.8-38 1 Pages TS / B 3.8-39 through TS / B 3.8-46 0 Page TS / B 3.8-47 1 Pages TS / B 3.8-48 through TS / B 3.8-50 0 Pages TS / B 3.8-51 through TS / B 3.8-53 1 Page TS / B 3.8-54 0 Page TS / B 3.8-55 1 Pages TS / B 3.8-56 through TS / B 3.8-59 2 Pages TS / B 3.8-60 through TS / B 3.8-64 3 Page TS / B 3.8-65 4 Page TS / B 3.8-66 5 Pages TS / B 3.8-67 and TS / B 3.8-68 4 Page TS / B 3.8-69 5 Pages TS / B 3.8-70 through TS / B 3.8-83 1 Pages TS / B 3.8-83A through TS / B 3.8-83D 0 Pages B 3..8-84 through B 3.8-85 0 Page TS / B 3.8-86 1 Page TS / B 3.8-87 .2 Pages TS / B 3.8-88 and TS / B 3.8-89. 1 Page TS / B 3.8-90 2 Pages TS / B 3.8-91 through TS / B 3.8-93 1 Pages B 3.8-94 through B 3.8-99 0 B 3.9 REFUELING OPERATIONS BASES Pages TS / B 3.9-1 and TS / B 3.9-2 1 Pages TS / B 3.9-2a through TS / B 3.9-5 1 Pages TS./ B 3.9-6 through TS / B 3.9-8 0 Pages B 3.9-9 through B 3.9-18 0 Pages TS / B 3.9-19 through TS / B 3.9-21 1 Pages B 3.9-22 through B 3.9-30 0 B 3.10 SPECIAL OPERATIONS BASES Page TS / B 3.10-1 2 Pages TS / B 3.10-2 through TS / B 3.10-5 1 Pages B 3.10-6 through B 3.10-32 0 Page TS / B 3.10-33 2 Page B 3.10-34 0 Page B 3.10-35 1 Pages B 3.10-36 and B 3.10-37 0 Page B 3.10-38 1 Page TS / B 3.10-39 2 TSB2 Text LOES.doc 4/20/2012 SUSQUEHANNA - UNIT 2 TS / B LOES-9 Revision 109

PPL Rev. 5 RHRSW System and UHS B 3.7.1 B 3.7 PLANT SYSTEMS B 3.7.1 Residual Heat Removal Service Water (RHRSW) System and the Ultimate Heat Sink (UHS)

BASES BACKGROUND The RHRSW System is designed to provide cooling water for the Residual Heat Removal (RHR) System heat exchangers, required for a safe reactor shutdown following a Design Basis Accident (DBA) or transient. The RHRSW System is operated whenever the RHR heat exchangers are required to operate in the shutdown cooling mode or in the suppression pool cooling or spray mode of the RHR System.

The RHRSW System consists of two independent and redundant subsystems. Each subsystem is made up of a header, one pump, a suction source, valves, piping, heat exchanger, and associated instrumentation. Either of the two subsystems is capable of providing the required cooling capacity to maintain safe shutdown conditions. The two subsystems are separated so that failure of one subsystem will not affect the OPERABILITY of the other subsystem. One Unit 1 RHRSW subsystem and the associated (same division) Unit 2 RHRSW subsystem constitute a single RHRSW loop. The two RHRSW pumps in a loop can each, independently, be aligned to either Unit's heat exchanger. The RHRSW System is designed with sufficient redundancy so that no single active component failure can prevent it from achieving its design function.

The RHRSW System is described in the FSAR, Section 9.2.6, Reference 1.

Cooling water is pumped by the RHRSW pumps from the UHS through the tube side of the RHR heat exchangers. After removing heat from the RHRSW heat exchanger, the water is discharged to the spray pond (UHS) by way of the UHS return loops. The UHS return loops direct the return flow to a network of sprays that dissipate the heat to the atmosphere or directly to the UHS via a bypass header.

The system is initiated manually from the control room except for the spray array bypass manual valves that are operated locally in the event of a failure of the spray array bypass valves. The system can be started any time the LOCA signal is manually overridden or clears.

(continued)

SUSQUEHANNA - UNIT 2 TS / B 3.7-1 Revision 3

PPL Rev. 5 RHRSW System and UHS B 3.7.1 BASES BACKGROUND The ultimate heat sink (UHS) system is composed of approximately (continued) 3,300,000 cubic foot spray pond and associated piping and spray risers.

Each UHS return loop contains a bypass line, a large spray array and a small spray array. The purpose of the UHS is to provide both a suction source of water and a return path for the RHRSW and ESW systems.

The function of the UHS is to provide water to the RHRSW and ESW systems at a temperature less than the 97 0 F design temperature of the RHRSW and ESW systems. UHS temperature is maintained less than the design temperature by introducing the hot return fluid from the RHRSW and ESW systems into the spray loops and relying on spray cooling to maintain temperature. The UHS is designed to supply the RHRSW and ESW systems with all the cooling capacity required during a combination LOCA/LOOP for thirty days without fluid addition. The UHS is described in the FSAR, Section 9.2.7 (Reference 1).

APPLICABLE The RHRSW System removes heat from the suppression pool to limit the SAFETY suppression pool temperature and primary containment pressure following ANALYSES a LOCA. This ensures that the primary containment can perform its function of limiting the release of radioactive materials to the environment following a LOCA. The ability of the RHRSW System to support long term cooling of the reactor or primary containment is discussed in the FSAR, Chapters 6 and 15 (Refs. 2 and 3, respectively). These analyses explicitly assume that the RHRSW System will provide adequate cooling support to the equipment required for safe shutdown. These analyses include the evaluation of the long term primary containment response after a design basis LOCA.

The safety analyses for long term cooling were performed for various RHRSW and UHS configurations combinations of RHR System failures.

As discussed in the FSAR, Section 6.2.2 (Ref. 2) for these analyses, manual initiation of the OPERABLE RHRSW subsystem and the I1 associated RHR System is required. The maximum suppression chamber water temperature and pressure are analyzed to be below the design temperature of 220°F and maximum allowable pressure of 53 psig.

(continued)

SUSQUEHANNA - UNIT 2 TS / [] 3.7-2 Revision 4

PPL Rev. 5 RHRSW System and UHS B 3.7.1 BASES APPLICABLE The UHS design takes into account the cooling efficiency of the spray SAFETY arrays and the evaporation losses during design basis environmental ANALYSES conditions. The spray array bypass header provides the flow path for the (continued) ESW and RHRSW system to keep the spray array headers from freezing.

The small and/or large spray arrays are placed in service to dissipate heat returning from the plant. The UHS return header is comprised of the spray array bypass header, the large spray array, and the small spray array.

The spray array bypass header is capable of passing full flow from the RHRSW and ESW systems in each loop. The large spray array is capable of passing full flow from the RHRSW and ESW systems in each loop. The small spray array supports heat dissipation when low system flows are required.

The RHRSW System, together with the UHS, satisfy Criterion 3 of the NRC Policy Statement. (Ref. 4)

LCO Two RHRSW subsystems are required to be OPERABLE to provide the required redundancy to ensure that the system functions to remove post accident heat loads, assuming the worst case single active failure occurs coincident with the loss of offsite power.

An RHRSW subsystem is considered OPERABLE when:

a. One pump is OPERABLE; and
b. An OPERABLE flow path is capable of taking suction from the UHS and transferring the water to the RHR heat exchanger and returning it to the UHS at the assumed flow rate, and
c. An OPERABLE UHS.

The OPERABILITY of the UHS is based on having a minimum water level at the overflow weir of 678 feet 1 inch above mean sea level and a maximum water temperature of 85°F; unless either unit is in MODE 3. If a unit enters MODE 3, the time of entrance into this condition determines the appropriate maximum ultimate heat sink fluid temperature. If the earliest unit to enter MODE 3 has been in that condition for less than twelve (12) hours, the peak temperature to maintain OPERABILITY of the ultimate heat sink remains at 85 0 F. If either unit has been in MODE 3 for more than twelve (12) hours but less than twenty-four (24) hours, the OPERABILITY temperature of the ultimate heat sink becomes 87 0 F. If either unit has been in MODE 3 for twenty-four (24) hours or more, the OPERABILITY temperature of the ultimate heat sink becomes 880F.

(continued)

SUSQUEHANNA - UNIT 2 TS / B 3.7-3 Revision 3

PPL Rev. 5 RHRSW System and UHS B 3.7.1 BASES LCO In addition, the OPERABILITY of the UHS is based on having sufficient (continued) spray capacity in the UHS return loops. Sufficient spray capacity is defined as one large and one small spray array in one loop.

This OPERABILITY definition is supported by analysis and evaluations performed in accordance with the guidance given in Regulatory Guide 1.27.

APPLICABILITY In MODES 1, 2, and 3, the RHRSW System and the UHS are required to be OPERABLE to support the OPERABILITY of the RHR System for primary containment cooling (LCO 3.6.2.3, "Residual Heat Removal (RHR)

Suppression Pool Cooling," and LCO 3.6.2.4, "Residual Heat Removal (RHR) Suppression Pool Spray") and decay heat removal (LCO 3.4.8, "Residual Heat Removal (RHR) Shutdown Cooling System-Hot Shutdown"). The Applicability is therefore consistent with the requirements of these systems.

In MODES 4 and 5, the OPERABILITY requirements of the RHRSW System are determined by the RHR shutdown cooling subsystem(s) it supports (LCO 3.4.9, "Residual Heat Removal (RHR) Shutdown Cooling System - Cold Shutdown"; LCO 3.9.7, "Residual Heat Removal (RHR) -

High Water Level"; and LCO 3.9.8, "Residual Heat Removal (RHR) - Low Water Level").

In MODES 4 and 5, the OPERABILITY requirements of the UHS is determined by the systems it supports.

ACTIONS The ACTIONS are modified by a Note indicating that the applicable Conditions of LCO 3.4.8, be entered and Required Actions taken if the inoperable RHRSW subsystem results in inoperable RHR shutdown cooling (SDC) (i.e., both the Unit 1 and Unit 2 RHRSW pumps in a loop are inoperable resulting in the associated RHR SDC system being inoperable). This is an exception to LCO 3.0.6 because the Required Actions of LCO 3.7.1 do not adequately compensate for the loss of RHR SDC Function (LCO 3.4.8).

Condition A is modified by a separate note to allow separate Condition entry for each valve. This is acceptable since the Required Action for this Condition provide appropriate compensatory actions.

(continued)

SUSQUEHANNA - UNIT 2 TS / B 3.7-4 Revision 3

PPL Rev. 5 RHRSW System and UHS B 3.7.1 BASES ACTIONS A.1A A.2 and A.3 (continued)

With one spray loop bypass valve not capable of being closed on demand, the associated Unit 1 and Unit 2 RHRSW subsystems cannot use the spray cooling function of the affected UHS return loop. As a result, the associated RHRSW subsystem must be declared inoperable.

With one spray loop bypass valve not capable of being opened on demand, a return flow path is not available. As a result, the associated RHRSW subsystems must be declared inoperable.

With one spray array bypass manual valve not capable of being closed, the associated Unit 1 and Unit 2 RHRSW subsystems cannot use the spray cooling function of the affected UHS return path if the spray array bypass valve fails to close. As a result, the associated RHRSW subsystems must be declared inoperable.

With one spray array bypass manual valve not open, a return flow path is not available. As a result, the associated RHRSW subsystems must be declared inoperable.

With one large spray array valve not capable of being opened on demand, the associated Unit 1 and Unit 2 RHRSW subsystems cannot use the full required spray cooling capability of the affected UHS return path. With one large spray array valve not capable of being closed on demand, the associated Unit 1 and Unit 2 RHRSW subsystems cannot use the small spray array when loop flows are low as the required spray nozzle pressure is not achievable for the small spray array. As a result, the associated RHRSW subsystems must be declared inoperable.

With one small spray array valve not capable of being opened on demand, the associated Unit 1 and Unit 2 RHRSW subsystems cannot use the spray cooling function of the affected UHS return path for low loop flow rates. For a single failure of the large spray array valve in the closed position, design bases LOCA/LOOP calculations assume that flow is reduced on the affected loop within 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> after the event to allow use of the small spray array. With one small spray array valve not capable of being closed on demand, the associated Unit 1 and Unit 2 RHRSW subsystems cannot use the large spray array for a flow path as the required nozzle pressure is not achievable for the large spray array. As a result, the associated RHRSW subsystems must be declared inoperable.

(continued)

SUSQUEHANNA - UNIT 2 TS / B 3.7-5 Revision 3

PPL Rev. 5 RHRSW System and UHS B 3.7.1 BASES ACTIONS A.A, A.2 and A.3 (continued)

With any UHS return path valve listed in Tables 3.7.1-1, 3.7.1-2, or 3.7.1-3 inoperable, the UHS return path is no longer single failure proof.

For combinations of inoperable valves in the same loop, the UHS spray capacity needed to support the OPERABILITY of the associated Unit 1 and Unit 2 RHRSW subsystems is affected. As a result, the associated RHRSW subsystems must be declared inoperable.

The 8-hour completion time to establish the flow path provides sufficient time to open a path and de-energize the appropriate valve in the open position.

The 72-hour completion time is based on the fact that, although adequate UHS spray loop capability exists during this time period, both units are affected and an additional single failure results in a system configuration that will not meet design basis accident requirements.

The Completion Time has been extended to 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> in order to complete the modifications in Unit 1 associated with the Multiple Fire-Induced Spurious Operations issue. This is a temporary extension of the Completion Time and is applicable during the 1A201 and 1A202 bus modifications. In order to cope with the consequences of a LOOP, a LOCA in Unit 2 and the shutdown of Unit 1 during the extended Completion Time, the following compensatory actions are required: 1) the affected loop's spray array bypass valves are in the open position and 2) the affected loop's spray array valves are closed. Upon completion of the MSO modifications on all four Unit 1 4.16 kV buses, this temporary extension is no longer applicable and will expire on May 31, 2012.

If an additional RHRSW subsystem on either Unit is inoperable, cooling capacity less than the minimum required for response to a design basis event would exist. Therefore, an 8-hour Completion Time is appropriate.

The 8-hour Completion Time provides sufficient time to restore inoperable equipment and there is a low probability that a design basis event would occur during this period.

B. 1 Required Action B.1 is intended to ensure that appropriate actions are taken if one Unit 2 RHRSW subsystem is inoperable. Although designated and operated as a unitized system, the associated Unit 1 subsystem is directly connected to a common header which can supply the associated RHR heat (continued)

SUSQUEHANNA - UNIT 2 TS / B 3.7-5a Revision 2

PPL Rev. 5 RHRSW System and UHS B 3.7.1 BASES ACTIONS B.1 (continued) exchanger in either unit. The associated Unit 1 subsystem is considered capable of supporting the associated Unit 2 RHRSW subsystem when the Unit 1 subsystem is OPERABLE and can provide the assumed flow to the Unit 2 heat exchanger. A Completion time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, when the associated Unit 1 RHRSW subsystem is not capable of supporting the associated Unit 2 RHRSW subsystem, is allowed to restore the Unit 2 RHRSW subsystem to OPERABLE status. In this configuration, the remaining OPERABLE Unit 2 RHRSW subsystem is adequate to perform the RHRSW heat removal function. However, the overall reliability is reduced because a single failure in the OPERABLE RHRSW subsystem could result in loss of RHRSW function. The Completion Time is based on the redundant RHRSW capabilities afforded by the OPERABLE subsystem and the low probability of an event occurring requiring RHRSW during this period.

The Completion Time to restore the Unit 2 RHRSW subsystem as been extended to 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> in order to complete the modifications in Unit 1 associated with the Multiple Fire-Induced Spurious Operations issue. This is a temporary extension of the Completion Time and is applicable during the 1A201 and 1A202 bus modifications. The Unit 2 RHRSW subsystem remains functional since the subsystem has an operable pump, operable flow path and an operable UHS. Upon completion of the MSO modifications on all four Unit 1 4.16 kV buses, this temporary extension is no longer applicable and will expire on May 31, 2012.

With one RHRSW subsystem inoperable, and the respective Unit 1 RHRSW subsystem capable of supporting the respective Unit 2 RHRSW subsystem, the design basis cooling capacity for both units can still be maintained even considering a single active failure. However, the configuration does reduce the overall reliability of the RHRSW System.

Therefore, provided the associated Unit I subsystem remains capable of supporting its respective Unit 2 RHRSW subsystem, the inoperable RHRSW subsystem must be restored to OPERABLE status within 7 days.

The 7-day Completion Time is based on the remaining RHRSW System heat removal capability.

C.1 Required Action C. 1 is intended to ensure that appropriate actions are taken if both Unit 2 RHRSW subsystems are inoperable. Although designated and operated as a unitized system, the associated Unit 1 subsystem is directly connected to a common header which can supply the associated RHR heat (continued)

SUSQUEHANNA - UNIT 2 TS / B 3.7-6 Revision 4

PPL Rev. 5 RHRSW System and UHS B 3.7.1 BASES ACTIONS C.1 (continued) exchanger in either unit. With both Unit 2 RHRSW subsystems inoperable, the RHRSW system is still capable of performing its intended design function. However, the loss of an additional RHRSW subsystem on Unit I results in the cooling capacity to be less than the minimum required for response to a design basis event. Therefore, the 8-hour Completion Time is appropriate. The 8-hour Completion Time for restoring one RHRSW subsystem to OPERABLE status, is based on the Completion Times provided for the RHR suppression pool spray function.

With both Unit 2 RHRSW subsystems inoperable, and both of the Unit 1 RHRSW subsystems capable of supporting their respective Unit 2 RHRSW subsystem, if no additional failures occur which impact the RHRSW System, the remaining OPERABLE Unit 1 subsystems and flow paths provide adequate heat removal capacity following a design basis LOCA. However, capability for this alignment is not assumed in long term containment response analysis and an additional single failure in the RHRSW System could reduce the system capacity below that assumed in the safety analysis.

Therefore, continued operation is permitted only for a limited time. One inoperable subsystem is required to be restored to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time for restoring one inoperable RHRSW subsystem to OPERABLE status is based on the fact that the alternate loop is capable of providing the required cooling capability during this time period.

D.1 and D.2 If the RHRSW subsystems cannot be restored to OPERABLE status within the associated Completion Times, or the UHS is determined to be inoperable, the unit must be placed in a MODE in which the LCO does not apply. To achieve this status, the unit must be placed in at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.

SURVEILLANCE SR 3.7.1.1 REQUIREMENTS This SR verifies the water level to be sufficient for the proper operation of the RHRSW pumps (net positive suction head and pump vortexing are considered in determining this limit). The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequency is based on (continued)

SUSQUEHANNA - UNIT 2 TS / B 3.7-6a Revision 3

PPL Rev. 5 RHRSW System and UHS B 3.7.1 BASES SURVEILLANCE SR 3.7.1.1 (continued)

REQUIREMENTS operating experience related to trending of the parameter variations during the applicable MODES.

SR 3.7.1.2 Verification of the UHS temperature, which is the arithmetical average of the UHS temperature near the surface, middle and bottom levels, ensures that the heat removal capability of the ESW and RHRSW Systems are within the assumptions of the DBA analysis. The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Frequency is based on operating experience related to trending of the parameter variations during the applicable MODES.

SR 3.7.1.3 Verifying the correct alignment for each manual, power operated, and automatic valve in each RHRSW subsystem flow path provides assurance that the proper flow paths will exist for RHRSW operation. This SR does not apply to valves that are locked, sealed, or otherwise secured in position, since these valves are verified to be in the correct position prior to locking, sealing, or securing. A valve is also allowed to be in the nonaccident position, and yet considered in the correct position, provided it can be realigned to its accident position. This is acceptable because the RHRSW System is a manually initiated system.

This SR does not require any testing or valve manipulation; rather, it involves verification that those valves capable of being mispositioned are in the correct position. This SR does not apply to valves that cannot be inadvertently misaligned, such as check valves.

The 31-day Frequency is based on engineering judgment, is consistent with the procedural controls governing valve operation, and ensures correct valve positions.

SR 3.7.1.4 The UHS spray array bypass valves are required to actuate to the closed position for the UHS to perform its design function. These valves receive an automatic signal to open upon emergency service water (ESW) or residual heat removal service water (RHRSW) system pump start and are required to be operated from the control room or the remote shutdown panel. A spray bypass valve is considered to be inoperable when it cannot be closed on (continued)

SUSQUEHANNA - UNIT 2 TS / B 3.7-6b Revision 2

PPL Rev. 5 RHRSW System and UHS B 3.7.1 BASES SURVEILLANCE SR 3.7.1.4 (continued)

REQUIREMENTS demand. Failure of the spray bypass valve to close on demand puts the UHS at risk to exceed its design temperature. The failure of the spray bypass valve to open on demand makes one return path unavailable, and therefore the associated RHRSW subsystems must be declared inoperable. This SR demonstrates that the valves will move to their required positions when required. The 92-day Test Frequency is based upon engineering judgment and operating/testing history that indicates this frequency gives adequate assurance that the valves will move to their required positions when required.

SR 3.7.1.5 The UHS return header large spray array valves are required to open in order for the UHS to perform its design function. These valves are manually actuated from either the control room or the remote shutdown panel, under station operating procedure, when the RHRSW system is required to remove energy from the reactor vessel or suppression pool. This SR demonstrates that the valves will move to their required positions when required. The 92-day Test Frequency is based upon engineering judgment and operating/testing history that indicates this frequency gives adequate assurance that the valves will move to their required positions when required.

SR 3.7.1.6 The small spray array valves HV-01224A2 and B2 are required to operate in order for the UHS to perform its design function. These valves are manually actuated from the control room or the remote shutdown panel, under station operating procedure, when the RHRSW system is required to remove energy from the reactor vessel or suppression pool. This SR demonstrates that the valves will move to their required positions when required. The 92-day Test Frequency is based upon engineering judgment and operating/testing history that indicates this frequency gives adequate assurance that the valves will move to their required positions when required.

SR 3.7.1.7 The spray array bypass manual valves 012287A and B are required to operate in the event of a failure of the spray array bypass valves to close in order for the UHS to perform its design function.

REFERENCES 1. FSAR, Section 9.2.

2. FSAR, Chapter 6.
3. FSAR, Chapter 15.
4. Final Policy Statement on Technical Specifications Improvements, July 22, 1993 (58 FR 39132).

SUSQUEHANNA - UNIT 2 TS / B 3.7-6c Revision 3

PPL Rev. 4 Distribution Systems-Operating B 3.8.7 B 3.8 ELECTRICAL POWER SYSTEMS B 3.8.7 Distribution Systems-Operating BASES BACKGROUND The onsite Class 1iE AC and DC electrical power distribution system is divided into redundant and independent AC and DC electrical power distribution subsystems and a DG E electrical power distribution subsystem.

The primary AC distribution system consists of four 4.16 kV Engineered Safeguards System (ESS) buses each having a primary and alternate offsite source of power as well as an onsite diesel generator (DG) source that supports one 4.16 kV ESS bus in each unit. Each 4.16 kV ESS bus is normally supplied by either Startup Transformer (ST) No. 10 or ST No. 20. ST No. 10 and ST No. 20 each provide the normal source of power to two of the four 4.16 kV ESS buses in each Unit and the alternate source of power to the remaining two 4.16 kV ESS buses in each Unit. If any 4.16 kV ESS bus loses power, an automatic transfer from the normal to the alternate occurs after the normal supply breaker trips. If both offsite sources are unavailable, the onsite emergency DGs supply power to the 4.16 kV ESS buses.

There are two 250 VDC electrical power distribution subsystems; four 125 VDC electrical power distribution subsystems; and, and one 125 VDC DG E electrical power distribution subsystem, all of which support the necessary power for ESF functions.

In addition, some components required by Unit 2 receive power through Unit 1 electrical power distribution subsystems, the Unit 1 AC and DC electrical power distribution subsystems needed to support the required equipment are addressed in Unit 2 LCO 3.8.7.

Required distribution subsystems are listed in LCO 3.8.7, Table 3.8.7-1.

APPLICABLE The initial conditions of Design Basis Accident (DBA) and SAFETY ANALYSES transient analyses in the FSAR, Chapter 6 (Ref. 1) and Chapter 15 (Ref. 2), assume ESF systems are OPERABLE. The AC and DC electrical power distribution systems are designed (continued)

SUSQUEHANNA - UNIT 2 B 3.8-84 Revision 0

PPL Rev. 4 Distribution Systems-Operating B 3.8.7 BASES APPLICABLE to provide sufficient capacity, capability, redundancy, and reliability to SAFETY ANALYSES ensure the availability of necessary power to ESF systems so that the (continued) fuel, Reactor Coolant System, and containment design limits are not exceeded. These limits are discussed in more detail in the Bases for Section 3.2, Power Distribution Limits; Section 3.4, Reactor Coolant System (RCS); and Section 3.6 Containment Systems.

The OPERABILITY of the AC and DC electrical power distribution subsystems is consistent with the initial assumptions of the accident analyses and is based upon meeting the design basis of the unit. This includes maintaining distribution systems OPERABLE during accident conditions in the event of:

a. An assumed loss of all offsite power or all onsite AC electrical power; and
b. A worst case single failure.

The AC and DC electrical power distribution system satisfies Criterion 3 of the NRC Policy Statement (Ref. 4).

LCO The required electrical power distribution subsystems listed in Table 3.8.7-1 ensure the availability of AC and DC electrical power for the systems required to shut down the reactor and maintain it in a safe condition after an anticipated operational occurrence (AOO) or a postulated DBA. The AC and DC electrical power distribution subsystems are required to be OPERABLE.

Maintaining the AC and DC electrical power distribution subsystems OPERABLE ensures that the redundancy incorporated into the design of ESF is not defeated. Therefore, a single failure within any system or within the electrical power distribution subsystems will not prevent safe shutdown of the reactor.

AC electrical power distribution subsystems require the associated buses and electrical circuits to be energized to their proper voltages. DC electrical power distribution subsystems require the associated buses to be energized to their proper voltage from either the associated battery or charger. The AC and DC electrical power distribution (continued)

SUSQUEHANNA - UNIT 2 B 3.8-85 Revision 0

PPL Rev. 4 Distribution Systems-Operating B 3.8.7 BASES LCO subsystem is only considered Inoperable when the subsystem is not (continued) energized to its proper voltage.

APPLICABILITY The electrical power distribution subsystems are required to be OPERABLE in MODES 1, 2, and 3 to ensure that:

a. Acceptable fuel design limits and reactor coolant pressure boundary limits are not exceeded as a result of AOOs or abnormal transients; and
b. Adequate core cooling is provided, and containment OPERABILITY and other vital functions are maintained in the event of a postulated DBA.

Electrical power distribution subsystem requirements for MODES 4 and 5 are covered in the Bases for LCO 3.8.8, "Distribution Systems -

Shutdown."

ACTIONS A.1 With one or more required Unit 2 AC buses, load centers, motor control centers, or distribution panels inoperable but not resulting in a loss of safety function, or two Unit 1 AC electrical power distribution subsystems on one Division inoperable for performance of Unit 1 SR 3.8.1.19, the remaining AC electrical power distribution subsystems are capable of supporting the minimum safety functions necessary to shut down the reactor and maintain it in a safe shutdown condition, assuming no single failure. The overall reliability is reduced, however, because a single failure in the remaining power distribution subsystems could result in the minimum required ESF functions not being supported. Therefore, the required AC buses, load centers, motor control centers, and distribution panels must be restored to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

The Condition A worst scenario is one division without AC power (i.e., no offsite power to the division and the associated DG inoperable). In this Condition, the unit is more vulnerable to a complete loss of AC power. It is, therefore, imperative that the unit operators' attention be focused on minimizing the potential for loss of power to the remaining division by stabilizing the unit, and on restoring power to the affected division. The 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> time limit before (continued)

SUSQUEHANNA - UNIT 2 TS / B 3.8-86 Revision 1

PPL Rev. 4 Distribution Systems-Operating B 3.8.7 BASES ACTIONS A.1 (continued) requiring a unit shutdown in this Condition is acceptable because:

a. There is a potential for decreased safety if the attention of unit operators is diverted from the evaluations and actions necessary to restore power to the affected division to the actions associated with taking the unit to shutdown within this time limit.
b. The potential for an event in conjunction with a single failure of a redundant component in the division with AC power. (The redundant component is verified OPERABLE in accordance with Specification 5.5.11, "Safety Function Determination Program (SFDP).")

The second Completion Time for Required Action A.1 establishes a limit on the maximum time allowed for any combination of required distribution subsystems to be inoperable during any single continuous occurrence of failing to meet LCO 3.8.7. If Condition A is entered while, for instance, a DC bus is inoperable and subsequently returned OPERABLE, this LCO may already have been not met for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. This situation could lead to a total duration of 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />, since initial failure of the LCO, to restore the AC distribution system. At this time, a DC circuit could again become inoperable, and AC distribution could be restored OPERABLE. This could continue indefinitely.

This Completion Time allows for an exception to the normal "time zero" for beginning the allowed outage time "clock." This results in establishing the "time zero" at the time this LCO was initially not met, instead of at the time Condition A was entered. The 16 hour1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> Completion Time is an acceptable limitation on this potential to fail to meet the LCO indefinitely. The completion time exception is not applicable to Condition F or G because Condition F and G are only applicable to DG E DC electrical power subsystem.

Condition A is modified by a Note that states that Condition A is not applicable to the DG E DC electrical power subsystem. Condition F or G is applicable to an inoperable DG E DC electrical power subsystem.

Required Action A.1 is modified by a Note that requires the applicable Conditions and Required Actions of LCO 3.8.4 "DC Sources -

Operating," to be entered for DC subsystems made inoperable by inoperable AC electrical power distribution subsystems. This is an exception to LCO 3.0.6 and ensures the proper actions are taken for inoperable DC sources. Inoperability of a distribution subsystem can result in loss of charging power to batteries and eventual loss of DC power. This Note ensures that the appropriate attention is given to restoring charging power to batteries, if necessary, after loss of distribution systems.

(continued)

SUSQUEHANNA - UNIT 2 TS / B 3.8-87 Revision 2

PPL Rev. 4 Distribution Systems-Operating B 3.8.7 BASES ACTIONS B.1 (continued)

With one or more Unit 2 DC buses inoperable, the remaining DC electrical power distribution subsystems may be capable of supporting the minimum safety functions necessary to shut down the reactor and maintain it in a safe shutdown condition, assuming no single failure.

The overall reliability is reduced, however, because a single failure in one of the remaining DC electrical power distribution subsystems could result in the minimum required ESF functions not being supported.

Therefore, the required DC buses must be restored to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> by powering the bus from the associated battery or charger.

Condition B represents one subsystem or multiple DC Buses without adequate DC power, potentially with both the battery significantly degraded and the associated charger non-functioning. In this situation, the plant is significantly more vulnerable to a loss of minimally required DC power. It is, therefore, imperative that the operators attention focus on stabilizing the plant, minimizing the potential for loss of power to the remaining divisions, and restoring power to the affected division.

This 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> limit is more conservative than Completion Times allowed for the majority of components that would be without power. Taking exception to LCO 3.0.2 for components without adequate DC power, which would have Required Action Completion Times shorter than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, is acceptable because of:

a. The potential for decreased safety when requiring a change in plant conditions (i.e., requiring a shutdown) while not allowing stable operations to continue;
b. The potential for decreased safety when requiring entry into numerous applicable Conditions and Required Actions for components without DC power, while not providing sufficient time for the operators to perform the necessary evaluations and actions for restoring power to the affected division;
c. The potential for an event in conjunction with a single failure of a redundant component.

(continued)

SUSQUEHANNA - UNIT 2 TS / B 3.8-88 Revision 1

PPL Rev. 4 Distribution Systems-Operating B 3.8.7 BASES ACTIONS B.1 (continued)

The 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Completion Time for DC buses is consistent with Regulatory Guide 1.93 (Ref. 3).

The second Completion Time for Required Action B. 1 establishes a limit on the maximum time allowed for any combination of required distribution subsystems to be inoperable during any single continuous occurrence of failing to meet the LCO. If Condition C is entered while, for instance, an AC bus is inoperable and subsequently restored OPERABLE, the LCO may already have been not met for up to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. This situation could lead to a total duration of 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />, since initial failure of the LCO, to restore the DC distribution system. At this time, an AC division could again become inoperable, and DC distribution could be restored OPERABLE. This could continue indefinitely.

Condition B is modified by a Note that states that Condition B is not applicable to the DG E DC electrical power subsystem. Condition F or G is applicable to an inoperable DG E DC electrical power subsystem.

This Completion Time allows for an exception to the normal "time zero" for beginning the allowed outage time "clock." This allowance results in establishing the "time zero" at the time the LCO was initially not met, instead of at the time Condition C was entered. The 16 hour1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> Completion Time is an acceptable limitation on this potential of failing to meet the LCO indefinitely. The Completion Time exception is not applicable to Condition E and F.because Condition E and F are only applicable to DG E DC electrical power subsystem.

C.1 With one Unit 1 AC electrical power distribution subsystem that support Unit 2 inoperable, the remaining Unit 1 AC electrical power distribution subsystems are capable of supporting the minimum safety functions necessary to shut down the reactor and maintain it in a safe shutdown condition, assuming no single failure. However, the overall reliability is reduced because a single failure in the remaining AC electrical power distribution subsystem could result in the minimum required ESF functions not being supported. The Completion (continued)

SUSQUEHANNA - UNIT 2 TS / B 3.8-89 Revision 1

PPL Rev. 4 Distribution Systems-Operating B 3.8.7 BASES ACTIONS C.1 (continued)

Time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is consistent with the Completion Times associated with LCOs for the Unit 2 and common equipment potentially affected by loss of a Unit 1 AC electrical power subsystem.

The Completion Time has been extended to 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> in order to complete the modifications in Unit 1 associated with the Multiple Fire-Induced Spurious Operations issue. This is a temporary extension of the Completion Time. Upon completion of the MSO modifications on all four Unit 1 4.16 kV buses, this temporary extension is no longer applicable and will expire on May 31, 2012.

D.1 With two required Unit 1 AC buses, load centers, motor control centers, or distribution panels inoperable for the performance of Unit 1 SR 3.8.1.19 but not resulting in a loss of safety function, the remaining AC electrical power distribution subsystems are capable of supporting the minimum safety functions necessary to shut down the reactor and maintain it in a safe shutdown condition, assuming no single failure.

The overall reliability is reduced, however, because a single failure in the remaining power distribution subsystems could result in the minimum required ESF functions not being supported. Therefore, the required AC buses, load centers, motor control centers, and distribution panels must be restored to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

E.land E.2 If the inoperable distribution subsystem cannot be restored to OPERABLE status within the associated Completion Time, the unit must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

F. 1 If Diesel Generator E is not aligned to the Class 1 E distribution system, the only supported safety function is for the ESW system. Therefore, under this condition, if Diesel Generator E DC power distribution subsystem is not OPERABLE, to ensure the OPERABILITY of the ESW system, actions are taken to either restore the power distribution subsystem to OPERABLE status or shutdown Diesel Generator E and (continued)

SUSQUEHANNA - UNIT 2 TS / B 3.8-90 Revision 2

PPL Rev. 4 Distribution Systems-Operating B 3.8.7 BASES ACTIONS F.1 (continued) close the associated ESW valves. The 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> limit is consistent with the allowed time for other inoperable DC power distribution subsystems and provides sufficient time to evaluate the condition and take the corrective actions.

G.1 If the Diesel Generator E is aligned to the class 1 E distribution system, the loss of Diesel Generator E DC power distribution subsystem will result in the loss of a on-site Class 1E power source. Therefore, under this condition, if Diesel Generator E DC power distribution subsystem is not OPERABLE actions are taken to either restore the power distribution subsystem to OPERABLE status or declare Diesel Generator E inoperable and take Actions of LCO 3.8.1. The 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> limit is consistent with the allowed time for other DC sources and provides sufficient time to evaluate the condition and take the necessary corrective actions.

H.1 Condition H corresponds to a level of degradation in the electrical distribution system that causes a required safety function to be lost.

When more than one AC or DC electrical power distribution subsystem is lost, and this results in the loss of a required function, the plant is in a condition outside the accident analysis. Therefore, no additional time is justified for continued operation. LCO 3.0.3 must be entered immediately to commence a controlled shutdown. Entry into Condition G is not required if the loss of safety function is the result of entry into Condition A in combination with the loss of safety functions governed by LCOs other than LCO 3.8.7. In this case, enter LCO 3.8.7, Condition A, and the Condition for loss of function in the LCO that governs the safety function that is lost.

(continued)

SUSQUEHANNA-UNIT2 TS / B 3.8-91 Revision 1

PPL Rev. 4 Distribution Systems-Operating B 3.8.7 BASES ACTIONS 1.1 (continued)

With one or more Unit 1 DC electrical power subsystems inoperable, the remaining DC electrical power distribution subsystems are capable of supporting the minimum safety functions necessary to shut down the reactor and maintain it in a safe shutdown condition, assuming no single failure. However, The overall reliability is reduced because a single failure in the remaining DC electrical power distribution subsystem could result in the minimum required ESF functions not being supported. The Completion Time of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> is consistent with the Completion Times associated with a loss of one or more DC distribution subsystems and will allow sufficient time to restore power.

Completion of Required Action 1.1 causes Unit 1 loads to be powered from a Unit 2 DC electrical power subsystem.

Although the corresponding Unit 2 DC electrical power subsystem is evaluated for this condition, this condition is outside the design commitment to maintain DC power separation between units. To minimize the time this condition exists, Required Action 1.2 direct power to be restored from the corresponding Unit 1 DC electrical power subsystem, which restores power to the common loads, or requires that the Unit 1 and common loads be declared inoperable. The Completion Time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> provides sufficient time to restore power and acknowledges the fact that the condition, although not consistent with all design requirements, maintains all required safety systems available.

J. 1 If Unit 1 and common loads required to support Unit 2 cannot be transferred to corresponding Unit 2 DC electrical power subsystem when Unit 1 DC sources are inoperable; or, cannot be transferred back to a Unit 1 DC source when the Unit 1 DC source becomes OPERABLE, the associated loads may be incapable of performing their intended function and must be declared inoperable immediately.

(continued)

SUSQUEHANNA - UNIT 2 TS / B 3.8-92 Revision 1

PPL Rev. 4 Distribution Systems-Operating B 3.8.7 BASES (continued)

SURVEILLANCE SR 3.8.7.1 REQUIREMENTS This Surveillance verifies that the AC and DC, electrical power distribution systems are functioning properly, with the correct circuit breaker alignment. The correct breaker alignment ensures the appropriate independence of the electrical buses are maintained, and the appropriate voltage or indicated power is available to each required bus. This includes a verification that Unit 1 and common 125 VDC loads are aligned to a Unit 1 DC power distribution subsystem. The verification of voltage availability on the buses ensures that the required voltage is readily available for motive as well as control functions for critical system loads connected to these buses. The 7 day Frequency takes into account the redundant capability of the AC and DC electrical power distribution subsystems, and other indications available in the control room that alert the operator to subsystem malfunctions.

REFERENCES 1. FSAR, Chapter 6.

2. FSAR, Chapter 15.
3. Regulatory Guide 1.93, December 1974.
4. Final Policy Statement on Technical Specifications Improvements, July 22, 1993 (58 FR 39132).

SUSQUEHANNA - UNIT 2 TS / B 3.8-93 Revision 1