IR 05000321/2015007

From kanterella
Revision as of 13:38, 28 January 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification Of Edwin I. Hatch Nuclear Plant - NRC Component Design Bases Inspection - Inspection Report 05000321/2015007 And 05000366/2015007
ML15163A117
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/11/2015
From: Bartley J H
NRC/RGN-II/DRS/EB1
To: Vineyard D R
Southern Nuclear Operating Co
References
IR 2015007
Download: ML15163A117 (7)


Text

June 11, 2015

Mr. David Vice President Southern Nuclear Operating Company, Inc.

Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513

SUBJECT: NOTIFICATION OF EDWIN I. HATCH NUCLEAR PLANT - NRC COMPONENT DESIGN BASES INSPECTION - INSPECTION REPORT 05000321/2015007 AND 05000366/2015007

Dear Mr. Vineyard:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a component design bases inspection at your Edwin I. Hatch Nuclear Plant during the weeks of September 21 - 25, October 05 - 09, and October 19 - 23, 2015. Theodore Fanelli, a Senior Reactor Inspector from the NRC's Region II Office, will lead the inspection team. This inspection will be conducted in accordance with the baseline inspection procedure, Procedure 71111.21, Component Design Bases Inspection, issued November 29, 2013.

The inspection will evaluate the capability of risk significant/low margin components to function as designed and to support proper system operation. The inspection will also include a review of selected operator actions, operating experience, and modifications.

During a telephone conversation on June 10, 2015, Mr. Fanelli confirmed with Mr. Collins, of your staff, arrangements for an information-gathering site visit, and the three-week onsite inspection. The schedule is as follows: * Information-gathering visit: Week of August 31 - September 05, 2015 * Onsite weeks: September 21 - 25, October 05 - 09, and October 19 - 23, 2015 The purpose of the information-gathering visit is to meet with members of your staff to identify risk-significant components and operator actions. Information and documentation needed to support the inspection will also be identified. Mr. John Hanna, a Region II Senior Reactor Analyst, will accompany Mr. Fanelli during the information-gathering visit to review probabilistic risk assessment data and identify risk significant components that will be examined during the inspection.

The Enclosure lists documents that will be needed prior to the information-gathering visit.

Please provide the referenced information to the Region II office by August 24, 2015. Contact Mr. Fanelli with any questions concerning the requested information. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.

Additional documents will be requested during the information-gathering visit. The additional information will need to be available to the team in the Region II office prior to the first day of the preparation week, September 14, 2015. Mr. Fanelli will also discuss the following inspection support administrative details: availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; method of tracking inspector requests during the inspection; licensee computer access; working space; arrangements for site access; and other applicable information.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its Enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Mr. Fanelli at 404-997-4433 or me at 404-997-4607.

Sincerely,/RA/

Jonathan H. Bartley, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-321, 50-366 License Nos. DPR-57, NPF-5

Enclosure:

Information Request for Edwin I. Hatch Nuclear Plant -

Component Design Bases Inspection cc: Distribution via Listserv