MONTHYEARML24311A2242024-11-0606 November 2024 NRR E-mail Capture - Change to Estimated Completion Date for the SNC Fleet Physical Barrier Exemptions (L-2023-LLE-0018 and L-2023-LLE-0021) ML24302A0672024-10-25025 October 2024 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Revise Technical Specifications to Increase Safety/Relief Valve (S/Rv) Setpoints License Amendment Request (LAR) ML24290A1552024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley, Hatch, and Vogtle 1 and 2 - Proposed Alternative Request for Code Case N-572 ML24220A2502024-10-15015 October 2024 Email to Ryan Joyce Re Decision on the Hatch Exemption ML24220A2472024-10-11011 October 2024 Email to Ryan Joyce Re Availability of EA-FONSI for Hatch Exemption ML24281A1362024-10-0707 October 2024 NRR E-mail Capture - (External_Sender) Acceptance Review - Hatchs Revise Technical Specifications to Adopt TSTF-591 LAR (L-2024-LLA-0122) ML24278A0052024-10-0303 October 2024 Document Request for Hatch Nuclear Plant - IP 92702 Follow-Up Radiation Protection Inspection - Inspection Report 2024-04 ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24211A0162024-07-26026 July 2024 NRR E-mail Capture - Request for Additional Information - Hatch, Units 1 and 2, Revise TS SRs (3.4.3.1 & 3.1.7.7) to Increase SRV Setpoints LAR ML24194A0032024-07-11011 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley, Hatch, and Vogtle 1 and 2 - Alternative Request for Code Case N-572 ML24193A1182024-07-10010 July 2024 Email to SNC with RAI for Hatch Exemption Request ML24170A9362024-06-18018 June 2024 NRR E-mail Capture - Fyi - Change to Estimated Completion Date for the SNC Fleet Physical Barrier Exemptions (L-2023-LLE-0018 and L-2023-LLE-0021) ML24142A4992024-05-21021 May 2024 NRR E-mail Capture - Acceptance Review - Farley and Hatch - LAR to Revise TS 1.1 and Add Online Monitoring (OLM) Program (L-2024-LLA-0058) ML24138A1582024-05-17017 May 2024 NRR E-mail Capture - (External_Sender) Acceptance Review - Hatchs Revise TS Surveillance Requirements to Increase SRV Setpoints LAR (L-2024-LLA-0054) ML24100A4402024-04-0909 April 2024 NRR E-mail Capture - (External_Sender) RAI - Hatch, Units 1 and 2, Revise Technical Specifications to Adopt Extended RICTs for RHRSW and Psw Systems LAR ML24100A0072024-04-0808 April 2024 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML24082A1212024-03-21021 March 2024 NRR E-mail Capture - (External_Sender) Re Acceptance Review - Hatchs Adopt Alternative Seismic Method for 50.69 Categorization of SSCs LAR (L-2024-LLA-0017) ML24067A0702024-03-0707 March 2024 NRR E-mail Capture - Change in Estimated Review Completion for Hatch Revise TS Table 1.1-1 (Modes) LAR (L-2022-LLA-0120) ML24009A1112024-01-0909 January 2024 NRR E-mail Capture - Acceptance Review - Hatch 1&2 LAR - Revise TS 3.7.1 & 3.7.2 to Adopt Risk-Informed Completion Times for RHRSW and Psw Systems (L-2023-LLA-0169) ML23354A2032023-12-18018 December 2023 Document Request for Hatch Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-01 ML23264A0142023-09-14014 September 2023 NRR E-mail Capture - (External_Sender) Draft Round-2 RAI - Hatch, Units 1 and 2, Revise TS 1.1-1 Modes LAR ML23249A2082023-09-0606 September 2023 NRR E-mail Capture - Change in Estimated Review Schedule and Level of Effort for Hatch Revise TS Table 1.1-1 (Modes) LAR (L-2022-LLA-0120) ML23223A0142023-08-10010 August 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical Barriers ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23135A0922023-05-11011 May 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Request to Use Specific Provision of a Later Edition of the ASME BPV Code, Section XI (L-2023-LLR-0016) ML23073A0252023-03-13013 March 2023 NRR E-mail Capture - Fyi - Closeout the Evacuation Time Estimate (ETE) Reviews for SNC Fleet ML23065A0922023-03-0505 March 2023 NRR E-mail Capture - Revised Estimate Hours and Completion Date - Hatch RPV Head Closure Bolts LAR (L-2022-LLA-0120) ML23033A0952023-02-0202 February 2023 NRR E-mail Capture - (External_Sender) Re for Your Comments - State of Georgia - Hatch Units 1 and 2 - Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML23033A0282023-01-30030 January 2023 NRR E-mail Capture - Revised Estimates for Hatch RPV Studs LAR ML23026A0132023-01-19019 January 2023 NRR E-mail Capture - Revised Estimates for Hatch RPV Studs LAR ML23018A1872023-01-17017 January 2023 2023 HNP CGD Inspection Information Request ML23006A0662023-01-0505 January 2023 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Revise NFPA-805 License Amendment Request ML22355A2082022-12-21021 December 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, Reactor Pressure Vessel RPV Head Studs LAR ML23006A0252022-12-13013 December 2022 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - TSTF-208 License Amendment Request ML22341A1212022-12-0606 December 2022 NRR E-mail Capture - Recap of Takeaways from Hatch Audit on Dec 1, 2022 ML23026A2372022-11-16016 November 2022 2023001 Hatch RP RFI Final ML22305A7032022-11-0101 November 2022 NRR E-mail Capture - Potential Audit for Hatchs RPV Head Studs LAR ML22258A1532022-09-15015 September 2022 NRR E-mail Capture - Acceptance Review - Hatch Closure Studs in TS Table 1.1-1 Modes LAR (L-2022-LLA-0120) ML22251A1322022-09-0808 September 2022 NRR E-mail Capture - Fyi - Hatch TSTF-505 LAR ML22208A1332022-07-26026 July 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-208 LAR ML22207B8532022-07-25025 July 2022 NRR E-mail Capture - RCI - Hatch, Units 1 and 2, Revision to NFPA-805 LAR ML22157A3542022-06-0606 June 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-505 LAR ML22157A3552022-06-0606 June 2022 NRR E-mail Capture - Revised Estimates - Hatch TSTF-505 LAR ML22140A1192022-05-20020 May 2022 NRR E-mail Capture - RAIs - Hatch, Units 1 and 2, TSTF-505 LAR ML22138A4122022-05-18018 May 2022 NRR E-mail Capture - Acceptance Review - Hatch TSTF-208 LAR (L-2022-LLA-0045) ML22140A1182022-05-13013 May 2022 NRR E-mail Capture - for Your Action: Hatch TSTF-505 - Follow Up from Audit Question 12 ML22116A1492022-04-26026 April 2022 NRR E-mail Capture - Acceptance Review - Hatch Revise NFPA 805 LAR (L-2022-LLF-0000) ML22055A6652022-02-24024 February 2022 NRR E-mail Capture - Acceptance Review - Hatch TSTF-580 LAR (L-2022-LLA-0022) ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21357A0912021-12-23023 December 2021 NRR E-mail Capture - Acceptance Review - Hatch TSTF-207-A LAR (L-2021-LLA-0219) 2024-09-04
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24290A1552024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley, Hatch, and Vogtle 1 and 2 - Proposed Alternative Request for Code Case N-572 ML24278A0052024-10-0303 October 2024 Document Request for Hatch Nuclear Plant - IP 92702 Follow-Up Radiation Protection Inspection - Inspection Report 2024-04 ML24211A0162024-07-26026 July 2024 NRR E-mail Capture - Request for Additional Information - Hatch, Units 1 and 2, Revise TS SRs (3.4.3.1 & 3.1.7.7) to Increase SRV Setpoints LAR ML24208A1742024-07-26026 July 2024 Request for Additional Information Regarding License Amendment Request to Revise TS SRs (3.4.3.1 & 3.1.7.7) to Increase S/Rv Setpoints ML24193A1182024-07-10010 July 2024 Email to SNC with RAI for Hatch Exemption Request ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23354A2032023-12-18018 December 2023 Document Request for Hatch Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-01 ML23250A0472023-09-20020 September 2023 – Request for Additional Information Regarding License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts in Technical Specifications Table 1.1-1, Modes ML23264A0142023-09-14014 September 2023 NRR E-mail Capture - (External_Sender) Draft Round-2 RAI - Hatch, Units 1 and 2, Revise TS 1.1-1 Modes LAR ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23018A1872023-01-17017 January 2023 2023 HNP CGD Inspection Information Request ML22355A2082022-12-21021 December 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, Reactor Pressure Vessel RPV Head Studs LAR ML23026A2372022-11-16016 November 2022 2023001 Hatch RP RFI Final ML22208A1332022-07-26026 July 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-208 LAR ML22157A3542022-06-0606 June 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-505 LAR ML22140A1192022-05-20020 May 2022 NRR E-mail Capture - RAIs - Hatch, Units 1 and 2, TSTF-505 LAR ML22073A0842022-03-21021 March 2022 An NRC Fire Protection Team Inspection (NRC Inspection Report Nos. 05000321/2022011 and 05000366/2022011) and Request for Information ML22025A2142022-01-21021 January 2022 Plant Hatch 2022001 RP Baseline Inspection Information Request ML21265A3402021-09-22022 September 2021 NRR E-mail Capture - Request for Additional Information - Hatch, Unit 1, Emergency TS 3.7.2 LAR ML21111A3032021-04-21021 April 2021 NRR E-mail Capture - RAI - Hatch Unit 2 - One-Time Emergency RHR LAR (L-2020-LRO-0068) ML21110A6842021-04-20020 April 2021 NRR E-mail Capture - RAI - Hatch Unit 2 - One-Time Emergency RHR LAR (L-2020-LRO-0068) IR 05000321/20210102021-01-13013 January 2021 Notification of Edwin I. Hatch Nuclear Plant Design Bases Assurance Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000321/2021010 and 05000366/2021010 ML20293A0752020-10-14014 October 2020 NRR E-mail Capture - RAIs for SNC Fleet EP LAR (L-2020-LLA-0150 and L-2020-LLA-0151) ML20253A2732020-09-0909 September 2020 Requalification Program Inspection Hatch Nuclear Station ML20149K6252020-05-27027 May 2020 NRR E-mail Capture - RAIs for SNC Fleet Fire Protection Exemption Requests NL-19-1532, Units 1 and 2 - Response to Requests for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures. Systems and Components for Nuclear Power Reactors2019-12-18018 December 2019 Units 1 and 2 - Response to Requests for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures. Systems and Components for Nuclear Power Reactors ML19336A0142019-12-0101 December 2019 NRR E-mail Capture - RAI: Hatch Emergency TS 3.7.1 Residual Heat Removal Service Water (RHRSW) System LAR ML19280A0082019-10-0404 October 2019 NRR E-mail Capture - Request for Additional Information (RAI) - Hatch TSTF-51 LAR (L-2019-LLA-0091) ML19224C0552019-08-12012 August 2019 NRR E-mail Capture - RAI - Edwin I. Hatch Nuclear Plant, LAR Regarding Degraded Voltage (L-2019-LLA-0108) ML19220A0362019-08-0808 August 2019 NRR E-mail Capture - RAI - Edwin I. Hatch Nuclear Plant, LAR Regarding Adoption of NFPA 805, Request for Additional Information, EPID L-2018-LLA-0107 ML19164A2582019-06-13013 June 2019 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML19107A4962019-04-17017 April 2019 NRR E-mail Capture - Request for Additional Information - Hatch 1 & 2 Application to Adopt Title 10 of Code of Federal Regulations 50.69 RISK-INFORMED Categorization and Treatment of Structures, Systems and Components for Power Reactors ML19088A0092019-03-29029 March 2019 NRR E-mail Capture - Hatch 1 and 2 - LAR to Adopt NFPA 805 Fire Protection Standard, EPID L-2018-LLA-0107, Request for Additional Information ML19029B3402019-01-23023 January 2019 Southern Nuclear Operating Company, Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2 Draft Request for Additional Information for the License Amendment Requests to Adopt the Risk-Informed Provisions of Title 10 of the Code of Federal Regulat ML19016A3422019-01-10010 January 2019 U2 ISI 2019001 RFI - Bcc ML18355A4772019-01-0404 January 2019 Request for Additional Information Revise TS 5.2.2.g and Update Emergency Plan Minimum On-Shift Staff Tables ML18337A4032018-12-0606 December 2018 Request for Additional Information Revise Technical Specification 5.2.2.G and Updating Emergency Plan Minimum On-Shift Staff Tables ML18085A0132018-03-0808 March 2018 Draft Request for Additional Information on Alternative RR-V-11, Proposed Extension to Main Steam Safety Relief Valve Testing Requirements ML18058A0812018-02-27027 February 2018 Enclosurequest for Additional Information(Rai for Review of Southern Nuclear Operating Company'S Decommissioning Funding Plan Updates for Joseph M. Farley,Unit 1 and 2;Edwin I. Hatch,Units 1 and 2; and Vogtle Electric Generating Plant, Unit ML17306A0872017-11-0808 November 2017 Request for Additional Information Regarding the Decommissioning Funding Status Reports (EPID L-LRO-2017-0008) ML17284A3542017-11-0707 November 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools ML17270A1402017-09-27027 September 2017 PIR Notification Letter 2017 ML17290A3172017-09-19019 September 2017 NRR E-mail Capture - Hatch 1 and 2 - Draft Request for Additional Information Request for Alternative No. HNP-ISI-ALT-05-05 ML17111A5792017-04-26026 April 2017 Request for Additional Information, Fourth 10-Year ISI Interval Relief Requests ML17110A2112017-04-24024 April 2017 Request for Additional Information ML16330A1282016-12-0505 December 2016 Request for Additional Information ML16307A1842016-11-0202 November 2016 Request for Additional Information (Non-Proprietary) ML16271A1692016-10-17017 October 2016 Request for Additional Information ML16222A2952016-08-29029 August 2016 Request for Additional Information ML16205A0012016-07-22022 July 2016 Requalification Program Inspection - Plant Hatch 2024-07-26
[Table view] |
Text
1 Jose Diaz From:
Jose Diaz Sent:
Wednesday, November 16, 2022 3:35 PM To:
jmhunt@southernco.com
Subject:
2023001 Plant Hatch RP RFI Final Attachments:
2023001 Hatch RP RFI FINAL.pdf
- Mark, Ileftyouavoicemailregardingthisdocument.
AttachedyouwillfindthedocumentrequestletterassociatedwiththeupcomingRPInspectionatPlantHatch.Please, Letmeknowifyouhaveaquestion.
Respectfully, José JoséM.DíazVélez,Sr.HealthPhysicist DivisionofReactorSafety EngineeringBranch3 Jose.diaz@nrc.gov 4049974736 U.S.NuclearRegulatoryCommission RegionIIOffice MarquisOneTower245PeachtreeCenterAvenue,NE Suite1200 Atlanta,Georgia303031257
2 HatchNuclearPlant RadiationSafetyBaselineInspection InitialInformationRequest InspectionReport:05000321/2023001 DuringtheweekofFebruary610,2023,theU.S.NuclearRegulatoryCommission(NRC)will performabaselineRadiationSafetyInspectionattheHatchNuclearPlant(NRCInspection Procedures71124.01,71124.03,71124.04,71124.05,and71151).
Tominimizetheimpacttoyouronsiteresourcesduringtheinspectionandensuretheinspectors havethenecessaryinformationtocompletetheinspectionwhileonsite,wehaveencloseda requestfordocumentsneededforthisactivity.TheNRCrequeststhatthesedocumentsbe providedtotheinspectorsnolaterthanJanuary27,2023.
Ifthereareanyquestionsaboutthisinspectionorthematerialrequested,pleasecontactthelead inspector,JoseM.DiazVelezat4049974736,ortheEngineeringBranch3Chief,BinoyDesai at4049974519.
InaccordancewithTitle10oftheCodeofFederalRegulations(10CFR)2.390,Public inspections,exemptions,requestsforwithholding:acopyofthisdocumentwillbeavailable electronicallyforpublicinspectionintheNRCPublicDocumentRoom,orfromthePublicly AvailableRecordscomponentofNRC'sAgencywideDocumentsAccessandManagement System(ADAMS);accessiblefromtheNRCWebsiteathttp://www.nrc.gov/readingrm/adams.html.
PAPERWORKREDUCTIONACTSTATEMENT Thisdocumentdoesnotcontainneworamendedinformationcollectionrequirementssubjectto thePaperworkReductionActof1995(44U.S.C.3501etseq.).Existinginformationcollection requirementswereapprovedbytheOfficeofManagementandBudgetundercontrolnumbers 31500008,31500011,31500014,31500044,and31500135.
PUBLICPROTECTIONNOTIFICATION TheNRCmaynotconductorsponsor,andapersonisnotrequiredtorespondto,arequestfor informationoraninformationcollectionrequirement,unlesstherequestingdocumentdisplaysa currentlyvalidOfficeofManagementandBudgetcontrolnumber.
ML23026A237
3 DocumentRequestList OccupationalRadiationSafetyCornerstone Licensee:HatchNuclearPlant PlantHatchLicensingContact:MarkHunt(540)8942575)
Email:jmhunt@southernco.com DocketNumber:05000321 InspectionDates:February610,2023 DocumentsDuetoRegionIIby:January27,2023 NRCInspectionProcedures(IPs):
71124.01RadiologicalHazardAssessmentandExposureControls 71124.03InPlantAirborneRadioactivityControlandMitigation 71124.04OccupationalDoseAssessment 71124.05RadiationMonitoringInstrumentation 71151PerformanceIndicatorVerification Note:Pleaseprovidethecurrentversionofthesedocumentsinanelectronicformatifpossible(The preferredfileformatisMSWord,orsearchable.pdffiles).Totheextentpossible,pleaseorganizethe informationindirectoriesasrequestedbelowandifpossible,useadescriptivenameforthefiles provided.PleaseredactallPIIinanyrecordssubmitted.Recentexperiencehasdemonstratedthemost efficientmethodtotransferthisinformationtotheNRCisviaCERTREC.Itisbesttouploadallthe requestedinformationinonelargezipfile.Iftherearequestionsregardingthedocumentsrequested, ormethodoftransfer,pleasedonothesitatetocontacttheleadinspector.
Documentationforinspectionprocedures71124.01,shouldbefromFebruary1,2022.Documentation forinspectionprocedures711124.03,71124.04,71124.05and71151shouldbefromFebruary1,2021.
Thesedatesareapproximatetothelasttimetheseinspectionswereconducted.Also,provideonlya listingandtitleforNCRsrequestedforeachinspectionprocedureandinspectorswillselectasample fromtheseforindepthreviewduringtheinspection.
Ifyouhaveanyquestions,pleasecallJoséM.DíazVélezat(404)9974736.Thankyouinadvancefor youreffortinputtingtogetherthismaterial.
GeneralandMiscellaneousInformation 1.
Listofprimarysitecontact(s)foreachinspectionareaincludingname(s),emailandtelephone numbers.
2.
CorrectiveActionProgramprocedures.
3.
PlantManagementandRadiationProtectionorganizationalchartsw/contactnumbers.
4.
Scheduleofmajormaintenance/workactivitiesduringtheweekoftheinspection(Ganttchartif available).
5.
Mostrecent10CFR61analysisfortheDAWwastestream 6.
InternalandexternalassessmentsandauditsoftheRPprogramsinceFebruary1,2021(excluding INPO).
7.
Mostrecentselfassessmentsorauditperformedforeachoftheinspectableareasidentifiedabove.
4 8.
ProceduresassociatedwiththeSurveillanceFrequencyControlProgram.
71124.01RadiologicalHazardAssessmentandExposureControls (LastInspectedonFebruary1,2022) 1.
Listofoutage&activeonlineRadiationWorkPermits(RWPs)(includingtheirdoseanddoserate limits).
2.
SiteandCorporateproceduresrelatedtoHealthPhysics(HP)controls(e.g.,posting,labeling, surveys,RWPs,contaminationcontrol,highradiationarea(HRA)/LHRA/VHRAcontrol,keycontrol, controlofdivers,specialcontrolsduringfueloffload,hotspots,etc.).
3.
Proceduresrelatedtoreleaseofpersonnelandmaterials(e.g.releasesurveys,decontamination, guidanceforalarmfollowup,etc.).
4.
ALARAplanningpackagesforthe3highestdosejobsfortheupcomingrefuelingoutage 5.
OutageALARAreportfromthepreviousrefuelingoutage.
6.
Listofnonfuelitemsstoredinspentfuelpool(SFP).
7.
Listoflocations,orplantmapsindicatingthelocation,oflockedhighradiationareas(LHRAs)and veryhighradiationareas(VHRAs),includingareaswiththepotentialtobecomeaLHRAduring routineoperationsoroutages 8.
MostrecentsurveyofLHRAsandVHRAs(asapplicable).
9.
CorrectiveActionProgram(CAP)documents(CR,NRC,AR,etc.)relatedtoRPcontrols(e.g.,
keywordslike:radworkererror,HPtechnicianerror,postingissues,radioactivesourcecontrols, HRA/LHRA/VHRAissues,surveyproblems,etc.)generatedsincelastinspection.Thisshouldbealist ofcorrectiveactiondocumentscontainingaCAPdocumentnumberandabriefdescription,not completedocuments.
71124.03InPlantAirborneRadioactivityControlandMitigation (LastInspectedonFebruary1,2021) 1.
Proceduresrelatedtoairbornemonitoringandcontrol(e.g.,useofpurgesystems,useofportable HEPA/charcoalunits,temporaryventilationenclosures,useofCAMs,airsamplingguidance,Alpha airsampling,etc.).
2.
Proceduresrelatedtotheuseofrespiratoryprotectiondevices,(e.g.,SCBA,TEDEALARAguidance, PAPRs,storage,maintenance,training,QA,fittesting,etc.)
3.
Copyofthelast2gradeDairtestingcertificatesforeachsuppliedairsystemandSCBAfillingstation 4.
Documentationofthelast2surveillancesperformedonSCBAsandnegativepressurerespirators availableforemergencyuse,andnegativepressurerespiratorsdesignatedasinstoragebut availableforuse.
5.
Twomostrecentsurveillancesthatverifytheflowratesforthefollowingventilationsystems:
a.
MainControlRoomEnvironmentalControlVentilationSystem
- b. ReactorBuildingVentilationSystem 6.
TwomostrecentHEPAfilterDOPandcharcoaltestresultsforthefollowingventilationsystems:
a.
MainControlRoomEnvironmentalControlSystem b.
ReactorBuildingVentilationSystem 7.
ListofCRsrelatedtoairbornemonitoringandrespiratoryprotectionsinceFebruary1,2021.This shouldbealistofcorrectiveactiondocumentscontainingaCRnumberandbriefdescription,notfull CRs.
8.
Training/qualificationcertificatesforallonsiteand/orvendorpersonnelqualifiedtorepairSCBA thatperformedmaintenanceorrepairsfromFebruary1,2021,topresent.
5 9.
Availableforonsitereviewduringinspection a.
Inventory,inspection,andmaintenancerecordsforrespiratoryprotectiondevicesandSCBA equipment b.
Trainingrecords,includingfittests,forSCBAqualifiedindividuals c.
ListofalllicensedoperatorsqualifiedtowearanSCBA d.
ListofsiteEROpersonnelqualifiedtowearanSCBA e.
ListofallRPpersonnelqualifiedtowearanSCBA f.
ListoftemporaryventilationsystemsusedsinceFebruary1,2021tomitigatethepotentialfor airborneradioactivity.Notethattemporaryventilationsystemsetupsmayincludehigh efficiencyparticulateair(HEPA)/charcoalnegativepressureunits,downdrafttables,tents,metal Kellybuildings,andotherenclosures).
71124.04OccupationalDoseAssessment (LastInspectedonFebruary1,2021) 1.
Proceduresrelatedtooccupationaldoseassessment(e.g.,dosimetryissuanceanduse,unusual dosimetryoccurrences,multibadging/extremitydosimetry/badgerelocation,EffectiveDose Equivalent,personnelcontaminationevents,storage/careofpersonaldosimeters,invivoandin vitrointernaldoseassessment,skindoseassessment,QCforwholebodycounter,useofpassive monitoringifapplicable,declaredpregnantworkers) 2.
NVLAPaccreditationdocumentationforyears2021,and2022,andthecurrentdosimetryusedby thesite 3.
Listofallpositivewholebodycounts,invitro,orairsamplinganalyseswhichresultedinaCEDE equaltoorexceeding10milliremsinceFebruary1,2021.[Note:onlyalistingshouldbeprovidedfor usebytheinspectorstoselectasampleofissuesforreviewduringtheonsiteinspection]
4.
ListofallfacialcontaminationandLevelIIIpersonnelcontaminationeventsidentifiedsinceFebruary 1,2021.[Note:onlyalistingshouldbeprovidedforusebytheinspectorstoselectasampleof issuesforreviewduringtheonsiteinspection.]
5.
Mostrecentneutroncharacterization 6.
Mostrecentalphacharacterization 7.
Last18monthsofareaTLDresultsforgeneralplantareas(notREMPTLDs) 8.
CopiesofcurrentWBClibraries(e.g.,routine,medical,investigative,etc.)
9.
Mostrecentauditorselfassessmentofthelabthatprocessessitedosimetry
- 10. ListofCRsgeneratedsinceFebruary1,2021,forinternalorexternaldosimetryissues/events.Tryto usekeywordslikedosimetry,DLR,TLD,EDEX,MultiBadge,andElectronicDosimeter,etc.This shouldbealistofcorrectiveactiondocumentscontainingaCRnumberandbriefdescription,notfull CRs.
71124.05RadiationMonitoringInstrumentation (LastInspectedonFebruary1,2021) 1.
RadiationProtectionandMaintenanceprocedures/guidancedocuments,asapplicable,forthe following:
a.
Calibrationandfunctionaltest/sourcechecksofportableradiationdetectioninstruments
- b. Calibrationandfunctionaltestsofsmallarticlemonitor,personnelcontaminationmonitor, portalmonitor,countingroomequipment,electronicalarmingdosimeters,wholebodycounting equipment,andcontinuousairmonitors
6 c.
Collectionandanalysisofhighrange,postaccidenteffluentsamples
- d. Determinationofsetpointsforarearadiationmonitor,CAM,PCM,PM,andSAMequipment usedforareaandpersonnelmonitoringequipment e.
QAprogram(interlaboratorycomparisonprogram)forcountroominstruments 2.
Thelast2calibrationrecordsforeachofthefollowinginstruments:
a.
PrimaryContainmentAreaRadiationMonitor-HighRange
- b. ReactorBuildingVentStackRadiationMonitor c.
MainStackRadiationMonitoringSystem(Normal,mid,andhighrange ParticulateandNoble Gasdetectors,asapplicable)
- d. LiquidRadwasteEffluentRadiationMonitor 3.
DocumentationshowingtraceabilitytoNISTand/ortheprimarycalibrationfortheradioactive sourcesusedtocalibratetheinstrumentsiniteminitem2above.
4.
ChartorprocedurelistingEALsassociatedwithradiationmonitors(ifany).
5.
Emergencyplandocumentsidentifyingwhichradiationmonitorsareusedtodetermineemergency actionlevels(EALs),ifany.
6.
Provideacurrentlistofinservice(availableforuse)SAMs,PCMs,PMs,airsamplers,continuousair monitors(CAMs),portableradiationdetectioninstruments,countingroom(RPandChemistry),and WholeBodyCounters.[Note:Thelistwillbeusedtoselectmonitorsforevaluationduringtheonsite inspection.)
7.
Mostrecenttestrecordoftheinstrumentcalibrator(e.g.,Shepherdvalidationtesting/doserate curves).
8.
Documentsand/orcalculationsshowinghowthealarmsetpointsforthefollowinginstrumentsare determined,andalistofthecurrentsetpointsfor:
a.
PCMsandPMsattheRCAandProtectedAreaexitpoints
- b. CAMs 9.
ResultsofthecountingroomandwholebodycounterInterLaboratoryComparisonProgramfrom February1,2021,toyeartodate.
- 10. MostrecentRadiationMonitoringSystemengineeringperformancereview/evaluationorsystem healthreport,ifapplicable.
- 11. ListofCAPdocuments(CR,NRC,AR,etc.)relatedtoportableinstruments,areamonitors,CAMs, RCAreleasepointmonitors,WBCs,andcountroominstrumentsgeneratedsinceFebruary1,2021.
ThisshouldbealistofcorrectiveactiondocumentscontainingaCAPdocumentnumberandabrief description,notcompletedocuments.
71151-PerformanceIndicatorVerification(OccupationalandPublicCornerstones) 1.
Procedure(s)forgatheringandreportingPIdata 2.
MonthlyPIreportssinceFebruary1,2022,andcopiesofassociatedconditionreportsforany RadiologicalEffluentTechnicalSpecifications/OffsiteDoseCalculationManual(RETS/ODCM)
RadiologicalEffluentoccurrences 3.
ListofallCRsrelatedtoeffluentdose/ODCMissuessinceFebruary1,2022.Thisshouldbealistof correctiveactiondocumentscontainingaCRnumberandbriefdescription,notfullCRs.
4.
ListofallCRsrelatedtoLHRA/VHRAissuesorsignificant(>100mrem)unintendeddosessince February1,2022.ThisshouldbealistofcorrectiveactiondocumentscontainingaCRnumberand briefdescription,notfullCRs.
5.
Mostrecentgaseousandliquideffluentevaluationofdosetothepublic(yeartodatedoses).
6.
ListofelectronicdosimeteralarmssinceFebruary1,2022(includedoseanddoserate).
7 AssistanceRequestedDuringOnSiteInspection 1.
Identificationofradiologicalworkactivitiesavailableduringtheinspectionweekforobservation, includingnotificationofprejobbriefings,notificationofrisksignificantworkactivities,andlocation ofaudio/visualsurveillanceforremotejobcoverage.
2.
Healthphysicsassistanceinplantwalkdownsandinformationconcerningjobcoverageofongoing activitiestoassessaccesscontrols.
3.
Identificationofanyinstalledradiationmonitoringcalibrationactivitiesplannedthatmaybe availableforinspectorobservationduringtheinspection.
InspectorContactInformation:
MailingAddress:
JoséM.DíazVélez U.S.NuclearRegulatoryCommission Sr.HealthPhysicist RegionII (404) 9974736 ATTN:JoséM.DíazVélez jose.diazvelez@nrc.gov 245PeachtreeCenterAve.,N.ESuite1200 Atlanta,GA30303