February 4, 2022

SUBJECT:

EDWIN I. HATCH - INTEGRATED INSPECTION REPORT 05000321/2021004 AND 05000366/2021004

Dear Ms. Gayheart:

On December 31, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Edwin I. Hatch. On January 21, 2022, the NRC inspectors discussed the results of this inspection with Sonny Dean and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Alan J. Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects

Docket Nos. 05000321 and 05000366 License Nos. DPR-57 and NPF-5

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000321 and 05000366

License Numbers:

DPR-57 and NPF-5

Report Numbers:

05000321/2021004 and 05000366/2021004

Enterprise Identifier: I-2021-004-0008

Licensee:

Southern Nuclear Operating Company, INC.

Facility:

Edwin I. Hatch

Location:

Baxley, GA

Inspection Dates:

October 1, 2021 to December 31, 2021

Inspectors:

B. Caballero, Senior Operations Engineer

C. Fontana, Emergency Preparedness Inspector

J. Hickman, Resident Inspector

S. Sanchez, Senior Emergency Preparedness Insp

R. Smith, Senior Resident Inspector

J. Walker, Emergency Response Inspector

Approved By:

Alan J. Blamey, Chief

Reactor Projects Branch 2

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Edwin I. Hatch, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

Type Issue Number Title Report Section Status LER 05000321/2021003-00 LER 2021-003-00 for Edwin I. Hatch Nuclear Plant, Unit 1, High Pressure Coolant Injection System Discharge Valve Failure to Open 71153 Closed

PLANT STATUS

Unit 1 began the inspection period at 100 percent rated thermal power (RTP). On October 10, 2021, the unit was down powered to 77 percent RTP to perform a rod pattern adjustment, the unit was returned to 100 percent RTP on the same day. On October 23, 2021, the unit was down powered to 96 percent RTP to perform a rod pattern adjustment, the unit was returned to 100 percent RTP on the same day. On November 6, 2021, the unit was down powered to 77 percent RTP to perform a rod pattern adjustment, the unit was returned to 100 percent RTP on the same day. On November 20, 2021, the unit was down powered to 87 percent RTP to perform a rod pattern adjustment, the unit was returned to 100 percent RTP on November 21, 2021. On December 4, 2021, the unit was down powered to 75 percent RTP to perform a rod pattern adjustment, the unit was returned to 100 percent RTP on December 5, 2021. On December 21, 2021, the unit reached maximum core flow and began the coast down in power for the 2021, spring refueling outage. On December 29, 2021, the unit was manually scrammed due to pressure oscillations caused by a failed pressure transmitter. The unit remained shut down for the remainder of the inspection period.

Unit 2 began the inspection period at 100 percent RTP. On November 30, 2021, the unit was down powered to 96 percent RTP to perform control rod drive, hydraulic control unit maintenance, the unit was returned to 100 percent RTP the same day. On December 10, 2021, the unit was down powered to 30 percent RTP to perform repairs to 2A adjustable speed drive (ASD), after repairs were completed the unit was returned to 100 percent RTP on December 15, 2021. The unit operated there for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, conducted routine reviews using IP 71152, Problem Identification and Resolution, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of below freezing temperatures for the following systems on November 24, 2021:

1. Plant Service Water (PSW)

2. Residual Heat Removal Service Water (RHRSW)

3. Emergency Diesel Generators (EDGs)

4. Temporary Diesel Fire Pump

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Alignment of the Unit 1 residual heat removal (RHR) system 'B' and 'D' pumps during maintenance outage of loop 'A' RHR system, using 34SO-E11-010-1, "Residual Heat Removal System," Version 46.0, on October 7, 2021.
(2) Alignment of the Unit 1 reactor core isolation cooling (RCIC) system during maintenance outage of the high pressure coolant injection (HPCI) system, using 34SO-E51-001-1, "Reactor Core Isolation Cooling (RCIC) System," Version 30.4, on October 20, 2021.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Unit 1 and Unit 2 refueling floor 228' elevation on October 6, 2021.
(2) Unit 1 and Unit 2 control building 180' elevation on October 8, 2021.
(3) Unit 1 reactor building 185' elevation on October 12, 2021.
(4) Unit 2 reactor building 130' elevation on October 15, 2021.
(5) Unit 1 reactor building 203' elevation on November 22, 2021.

71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance

Requalification Examination Results (IP Section 03.03) (1 Sample)

(1) On November 23, 2021, the licensee completed the annual requalification operating tests and biennial written examinations required to be administered to all licensed operators in accordance with Title 10 of the Code of Federal Regulations 55.59(a)(2),

"Requalification Requirements," of the NRC's "Operator's Licenses." During the week of December 6, 2021, the inspector performed an in-office review of the overall pass/fail results of the individual operating examinations and the crew simulator operating examinations in accordance with Inspection Procedure (IP) 71111.11, "Licensed Operator Requalification Program." These results were compared to the thresholds established in Section 3.02, "Requalification Examination Results of IP

===71111.11.

The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating tests and the biennial written examinations, which the licensee completed administering on November 23, 2021.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the Control Room during the pressurizing of the Unit 1 HPCI system steam piping, the HPCI maintenance run following electronic governor adjustment and valve maintenance, the operating of both loops of RHR and RHRSW in suppression pool cooling and emergency shutdown of HPCI turbine due to a leak from the main pump's mechanical seal spraying in the HPCI room, on October 21, 2021.

Licensed Operator Requalification Training/Examinations (IP Section 03.02)===

(1) The inspectors observed and evaluated License Operator Requalification Program (LORP) Scenario H-LTC-SE-00183, "RCIC Torus Sensor/Lost of All ISO Phase Cooling/Recirculation Master Push Buttons Failure/LLS SRV Fails Open/LOSP with EDGs Failing to Start/Loss RCIC Suction/ 2A EDG Restoration," for two teams during annual simulator evaluations on October 5, 2021.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (2 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Review of the Unit 1 and 2 process radiation monitoring system D11 for functional failures on November 2, 2021.
(2) Review of the Unit 1 and 2 direct current (DC) system R42 for functional failures on November 9, 2021.

Quality Control (IP Section 03.02) (1 Sample)

The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following SSC remains capable of performing its intended function:

(1) Unit 2 "A" emergency diesel generator during a system outage, on December 8, 2021.

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Unit 2 elevated risk due to the failure of the '2A' EDG output breaker to close during testing resulted in an inoperable 2A EDG, on October 4, 2021.
(2) Unit 1 elevated risk due to the RHR and RHRSW division '1' system outage, on October 7, 2021.
(3) Unit 1 elevated risk due to the HPCI system outage, on October 19, 2021.
(4) Unit 2 elevated risk due to the RHR and RHRSW division '1' system outage, October 26, 2021.
(5) Unit 2 elevated risk due to "A" adjustable speed drive repair and single loop operations, on December 12, 2021.

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (3 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) CR10832023, Unit '2A' EDG output breaker failed to close during monthly operability surveillance on October 4, 2021.
(2) CR10836527, Unit 1 HPCI oil leaking from hydraulic manual turbine trip and reset button and from turbine driven shaft on October 23, 2021.
(3) CR10846881, Unit 1 'D' residual heat removal service water pump missing seismic restraint on December 14, 2021.

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1) Temporary modification to install a temporary diesel driven fire pump due to the failure of the installed diesel driven fire pump. A new diesel driven fire pump is being procured for installation.

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:

(1) Per Unit 2, 34SV-R43-001-2, "Diesel Generator 2A Monthly Test," Version 30.1, following replacement of damaged cable for synchro switch on October 5, 2021.
(2) Per Unit 1, 34SV-T48-001-2, Unit 2, "Reactor Building To Suppression Chamber Vacuum Relief System Operability," Version 4.13, following the adjustment of a valve's limit switches after failure on the initial operability test on October 17, 2021.
(3) Per Unit 1, 34SV-E41-002-1, "HPCI Pump Operability," Version 33.2, following the main pumps inboard mechanical seal replacement, on October 25, 2021.

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated the licensees response to a Unit 1 forced outage that was initiated by licensed operators inserting a manual scram due to unexpected main steam line pressure oscillations. This inspection will be completed in the first quarter of 2022.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1)34SV-E51-002-1, "RCIC Pump Operability," Version 29.2, on October 14, 2021.

(2)34SV-R43-004-2, "Diesel Generator 2A Fast Start Test," Version 18.4, on December 9, 2021.

71114.01 - Exercise Evaluation

Inspection Review (IP Section 02.01-02.11) (1 Sample)

(1) The inspectors evaluated the biennial emergency plan exercise during the week of November 1, 2021. The exercise scenario simulated a tornado strike in the electrical switchyard, which caused the plant to experience cascading failures (e.g., the swing emergency diesel generator (1B EDG) failed to start & the 2A EDG started but the breaker failed to close), culminating in a loss of offsite power on Unit 2 and meeting the conditions for declaration of an Alert. A short time later, the 2C EDG began to experience increased vibrations to the point of catastrophic failure, meeting the conditions for declaration of a Site Area Emergency. Lastly, since restoration of at least one alternating current (AC) emergency bus in less than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> was not likely, the conditions for declaration of a General Emergency were met and allowed the Offsite Response Organizations to demonstrate their ability to implement emergency actions.

71114.04 - Emergency Action Level and Emergency Plan Changes

Inspection Review (IP Section 02.01-02.03) (1 Sample)

(1) The inspectors evaluated submitted Emergency Action Level, Emergency Plan, and Emergency Plan Implementing Procedure changes during the week of November 1, 2021. This evaluation does not constitute NRC approval.

71114.08 - Exercise Evaluation Scenario Review

Inspection Review (IP Section 02.01 - 02.04) (1 Sample)

(1) The inspectors reviewed and evaluated in-office, the proposed scenario for the biennial emergency plan exercise at least 30 days prior to the day of the exercise.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04)===

(1) Unit 1 (October 1, 2020 to September 30, 2021).
(2) Unit 2 (October 1, 2020 to September 30, 2021).

MS09: Residual Heat Removal Systems (IP Section 02.08) (2 Samples)

(1) Unit 1 (July 1, 2020 to September 30, 2021).
(2) Unit 2 (July 1, 2020 to September 30, 2021).

MS10: Cooling Water Support Systems (IP Section 02.09) (2 Samples)

(1) Unit 1 (October 1, 2020 to September 30, 2021).
(2) Unit 2 (October 1, 2020 to September 30, 2021).

EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12) (1 Sample)

(1) Unit 1 (October 1, 2020, through June 30, 2021)

Unit 2 (October 1, 2020, through June 30, 2021)

EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13) (1 Sample)

(1) Unit 1 (October 1, 2020, through June 30, 2021)

Unit 2 (October 1, 2020, through June 30, 2021)

EP03: Alert And Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)

(1) Unit 1 (October 1, 2020, through June 30, 2021)

Unit 2 (October 1, 2020, through June 30, 2021)

71152 - Problem Identification and Resolution (PI&R)

Semiannual Trend Review (IP Section 02.02) (1 Sample)

(1) The inspectors reviewed the licensees corrective action program for potential adverse trends in the recirculation system adjustable speed drives that might be indicative of a more significant safety issue.

71153 - Follow Up of Events and Notices of Enforcement Discretion Event Follow up (IP Section 03.01)

(1) The inspectors evaluated the Unit 1 manual reactor scram due to pressure oscillations that were not initially understood and licensees response on December 29, 2021.

Event Report (IP Section 03.02) (1 Sample)

The inspectors evaluated the following licensee event reports (LERs):

(1) LER 05000321/2021-003-00, Unit 1 High Pressure Coolant Injection Discharge Valve Failure to Open (ADAMS Accession No. ML21305A874) on September 8, 2021. The inspectors did not identify a violation of significance of NRC requirements.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On January 21, 2022, the inspectors presented the integrated inspection results to Sonny Dean and other members of the licensee staff.
  • On November 5, 2021, the inspectors presented the Emergency Preparedness Exercise Inspection results to Mr. Johnny Weissinger and other members of the licensee staff.

THIRD PARTY REVIEWS

Inspectors reviewed Institute of Nuclear Power Operations reports that were issued during the inspection period.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Procedures

DI-OPS-36-0989

Cold Weather Checks

23.5

71111.04

Corrective Action

Documents

Condition Reports

10769308, 10774508, 10788649, 10792819, 10793304,

10795659, 10795778, 10795799, 10801900, 10803349,

10805667, 10805967, 10820738, 10830455, 10834115,

10835013, 10835382

Drawings

H-16329

Edwin I. Hatch Nuclear Plant Unit 1 R.H.R. System P&ID SHT.

84.0

Engineering

Evaluations

Technical

Evaluations

1090742

Procedures

34SO-E11-010-1

Residual Heat Removal System

46.0

34SO-E51-001-1

Reactor Core Isolation Cooling (RCIC) System

30.4

Work Orders

Work Orders

SNC1139384, SNC1139385, SNC1139386, SNC1139387,

SNC1151403, SNC834670, SNC1156676

71111.05

Fire Plans

NMP-ES-035-

019-GL02-F05

Control Building 180' Elevation

1.0

NMP-ES-035-

019-GL02-F15

U1 Reactor Building Elevation 185

1.0

NMP-ES-035-

019-GL02-F16

U1 Reactor Building Elevation 203'

1.0

NMP-ES-035-

019-GL02-F17

U1 Reactor Building 228' Elevation

1.0

NMP-ES-035-

019-GL02-F30

U2 Reactor Building 130' Elevation

1.0

NMP-ES-035-

019-GL02-F34

U2 Reactor Building 228' Elevation

1.0

71111.11Q Miscellaneous

H-LTC-SE-00183

RCIC Torus Sensor/Lost of All ISO Phase

Cooling/Recirculation Master Push Buttons Failure/LLS SRV

Fails Open/LOSP with EDGs Failing to Start/Loss RCIC

Suction/ 2A EDG Restoration

2.0

Procedures

34AR-601-104-1

RX BLDG Radiation High

3.5

34IT-E41-003-1

HPCI Turbine Speed Control Test

3.3

34SO-E11-010-1

Residual Heat Removal System

46.0

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

34SO-E41-001-1

High Pressure Coolant Injection (HPCI) System

30.4

71111.12

Corrective Action

Documents

CAR27421

Condition Report

10836131

Condition Reports

10742767, 10746454, 10746455, 10746587, 10746587,

10754269, 10755967, 10756259, 10708894, 10762282,

10763169, 10763746, 10764477, 10764534, 10764899,

10764904, 10765291, 10765908, 10766105, 10766203,

10767110, 10767989, 10768559, 10768568, 10769438,

10770987, 10772205, 10775611, 10777072, 10777379,

10777386, 10777703, 10778060, 10778267, 10782353,

10783227, 10783410, 10783474, 10784953, 10786162,

10786170, 10788934, 10789088, 10791747, 10791864,

10791883, 10794379, 10795253, 10796308, 10798269,

10798635, 10801591, 10801675, 10801730, 10805229,

10805634, 10807197, 10807681, 10810994, 10811598,

10814502, 10822847, 10823815, 10827235, 10833430,

10835404, 10835407, 10835834

Condition Reports

10763791, 10764375, 10764439, 10764777, 10764897,

10766364, 10766689, 10767072, 10768369, 10770379,

10770623, 10772650, 10779185, 10781752, 10782801,

10782804, 10782942, 10784711, 10784757, 10787885,

10788025, 10792621, 10793858, 10794880, 10795256,

10795631, 10796359, 10798401, 10798733, 10798752,

10795512, 10800304, 10802048, 10803635, 10804793,

10805003, 10805154, 10805848, 10809664, 10809682,

10817359, 10817662, 10817707, 10818284, 10820706,

10826336, 10828049, 10831636, 10833253, 10833997,

10834066, 10834127, 10836894, 10837316

Condition Reports

10763961, 10764865, 10765089, 10767162, 10767382,

10769265, 10773461, 10773650, 10775550, 10775617,

10775803, 10775821, 10775978, 10776553, 10776658,

10776775, 10776924, 10776966, 10777022, 10777160,

10777409, 10777411, 10777766, 10778086, 10778753,

10778832, 10779194, 10779535, 10780120, 10780269,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

10780635, 10780814, 10782548, 10783285, 10783860,

10783920, 10783928, 10784150, 10784439, 10785988,

10786599, 10786656, 10788658, 10786659, 10788661,

10791191, 10791530, 10721198, 10792736, 10797411,

10797412, 10797471, 10798438, 10798626, 10800063,

10800939, 10803304, 10833362, 10803577, 10804432,

10805041, 10707120, 10807193, 10809097, 10810261,

10810342, 10812665, 10813709, 10815257, 10815991,

10820597, 10820599, 10820752, 10821080, 10821708,

10821715, 10823238, 10825015, 10825937, 10826100,

10827289, 10827458, 10827459, 10827758, 10828783,

10829481, 10832227, 10832481, 10833520, 10833550,

10835342, 10838121

Condition Reports

10763932, 10739962, 10739963, 10763964, 10765578,

10766565, 10766722, 10767288, 10767378, 10767428,

10767530, 10768867, 10769071, 10771298, 10771334,

10772085, 10772376, 10772378, 10778312, 10778534,

10778646, 10778750, 10778751, 10778752, 10778902,

10778999, 10780761, 10780764, 10780909, 10781103,

10781655, 10781998, 10782792, 10783480, 10783875,

10783923, 10783924, 10783927, 10783966, 10784098,

10784149, 10788263, 10788352, 10723318, 10793618,

10793785, 10794617, 10797034, 10797350, 10797401,

10797403, 10797404, 10797407, 10797651, 10797977,

10798081, 10799653, 10799925, 10801951, 10803421,

10804120, 10804484, 10805033, 10805037, 10805883,

10805885, 10807067, 10809996, 10810338, 10810340,

10810341, 10810374, 10811393, 10811396, 10813358,

10813773, 10814265, 10814269, 10814288, 10814988,

10814998, 10816940, 10818543, 10818831, 10819113,

10819719, 10819720, 10820222, 10822570, 10822633,

10823264, 10823267, 10823463, 10826099, 10827438,

10827440, 10827500, 10829716, 10831721, 10832006,

10832244, 10832259, 10832614, 10832845, 10832964,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

10834548, 10834761

Miscellaneous

Maintenance Rule Expert Panel Meeting #2021-4 Agenda

10/21/2021

10789452

Increase in U1 Drywell Floor Drain Leakage - Fault Tree

D11-01

Process Radiation Monitoring

08/17/2015

D11-06

Primary Containment Gamma Radiation Monitoring (Wide

Range)

08/17/2015

D11-09

Main Stack Radiation Monitoring

08/17/2015

D11-11

Reactor Building Vent Stack Radiation Monitoring

08/17/2015

D11-12

Reactor Building Ventilation Radiation Monitoring

08/17/2015

D11-13

Process Radiation Monitoring

08/17/2015

R41-02

EDG 1E D/C Electrical Supply

08/17/2015

R42-01

D/C Electrical - Provide Power to required 125/250 VDC

Normal and Emergency Buses Within Design Limits

08/17/2015

R42-06

Provide Adequate Power tp 24/48 VDC Non-1E Loads

08/17/2015

R42-07

Provide Sufficient Illumination to Support EOP Execution

08/17/2015

NDE Reports

2IT-QCX-003-0,

Visual Inspection Record for Work Order SNC1131349

2/06/ 2021

2IT-QCX-003-0,

Visual Inspection Record for Work Order SNC836047

2/06/2021

2IT-QCX-003-0,

Visual Inspection Record for Work Order SNC842216

2/06/2021

Procedures

34AB-R42-001-0

Location of Grounds

1.3

34SO-D11-001-2

Fission Product Monitoring System

2.3

34SV-SUV-019-2

Surveillance Checks

41.29

2IT-QCX-003-0

Passive Components Inspection Activities: Visual Inspection

2.4

2CM-MME-066-

Gate Valve Maintenance

9.6

2PM-R43-001-0

Diesel Engine Major Inspection

8.8

2SVR43-001-0

Diesel, Alternator, and Accessories Inspection

31.21

2CI-OCB-008-0

Plant Service Water Radiation Monitors

8.4

NMP-ES-027

Maintenance Rule Program

10.4

Work Orders

SNC842216

Perform Applicable Sections of 52SV-R43-001-0 For 2A EDG

2/08/2021

SNC842216

Diesel Engine Major Inspection For 2A EDG

2/08/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Work Orders

SNC1133551, 1140533, 1135802, 1136345, 1137426,

1137696, 1140235,

71111.13

Corrective Action

Documents

Conditions Report

10832023

10/04/2021

Miscellaneous

Current Risk Summary Report for Unit 2

10/26/2021

Current Risk Summary Report for Unit 2

2/11/2021

Current Risk Summary Report for Unit 2

10/07/2021

Current Risk Summary Report for Unit 1

10/07/2021

Current Rick Summary Report for Unit 1

10/19/2021

Current Rick Summary Report for Unit 1

10/21/2021

Current Rick Summary Report for Unit 1

10/06/2021

Current Rick Summary Report for Unit 2

10/04/2021

H-LOCT Guide#:

21-032A

Just In Time Training: Unit 2 Single Recirculation Loop

Operations

11/15/2021

Hatch U1 R8 On-

Line Configuration

Risk Monitor

10/21/2021

NMP-RE-008-F01

Detailed Reactivity Plan

2/09/2021

Risk Monitor

Advanced Report

10/21/2021

Procedures

NMP-GM-031

On-Line Configuration Risk Management Program

9.0

NMP-GM-031-

003

Risk Management Actions for 10 CFR-50.65(a)(4) and the

Risk Informed Completion Time Program

8.0

NMP-OS-010-002

Hatch Protected Equipment Logs

11.1

71111.15

Corrective Action

Documents

Condition Report

10832023

10/04/2021

Condition Reports 10836527, 10836636

10/23/2021

71111.18

Engineering

Changes

SNC1182060

Temporary Fire Pump

0.0

SNC1182060

Temporary Fire Pump

1.0

Miscellaneous

Day Report

Evaluation of Diesel Fire Pump 1X43C002B Failure

10/28/2021

H-FP-Fire Pump-

00001

Temporary Fire Pump Familiarization Guide

1.0

Procedures

34SO-X43-001-1

Fire Pumps Operating Procedure

6.7

71111.19

Corrective Action

Conditions

10835001, 108355023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Documents

Reports

Procedures

34IT-E41-003-1

HPCI Turbine Speed Control Test

3.3

34SV-E41-002-1

HPCI Pump Operability

33.2

34SV-T48-001-2

Reactor Building To Suppression Chamber Vacuum Relief

System Operability

4.13

NMP-MA-014-001 Post Maintenance Testing Guidance

5.7

Work Orders

SNC1171141

SNC1182174

(DECPI) Replace Damaged Cable for Synchro Switch

10/04/2021

SNC1183939

Torus Vacuum Breaker Isolation Butterfly

10/17/2021

SNC1184801

71111.22

Miscellaneous

1E51C001-RCIC

Pump

Unit 1 RCIC IST and CPT Vibration Data (October 2, 2020

through October 14. 2021)

10/14/2021

HNP-1-FSAR-4.7

Reactor Core Isolation Cooling System

2.0

Procedures

34SV-E51-002-1

RCIC Pump Operability

29.2

34SV-R43-004-2

Diesel Generator 2A Fast Start Test

18.4

71152

Corrective Action

Documents

Condition Reports

10763984, 10767585, 10768827, 10769730, 10770234,

10772237, 10775815, 10779217, 10779246,

10796348,10802058, 10805681, 10813181, 10820346,

10821378, 10821835, 10832801, 10835666, 10842374,

10843497

Procedures

NMP-GM-002

Corrective Action Program

16.0

NMP-GM-002-

001

Corrective Action Program Instructions

2.0

NMP-GM-002-

2

Effectiveness Review Instructions

5.3

NMP-GM-002-

GL03

Cause Analysis and Corrective Actions Guidelines

31.0

71153

Miscellaneous

NMP-GM-002-

F22

Equipment Reliability Checklist, 1E41F007 Failed to Open

10/06/2021