Similar Documents at Hatch |
---|
Category:Letter
MONTHYEARIR 05000321/20240102024-11-0606 November 2024 NRC Inspection Report 05000321/2024010 and 05000366/2024010 ML24299A2222024-10-31031 October 2024 Audit Summary for License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components IR 05000321/20240032024-10-30030 October 2024 Edwin I Hatch, Units 1 and 2 - Integrated Inspection Report 05000321/2024003 and 05000366/2024003 NL-24-0357, Notification of Deviation from the Inspection Frequency Requirements of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines2024-10-30030 October 2024 Notification of Deviation from the Inspection Frequency Requirements of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines ML24292A1602024-10-22022 October 2024 Request for Withholding Information from Public Disclosure License Amendment Request to Revise Technical Specification Surveillance Requirements to Increase Safety/Relief Valve Setpoints ML24290A0792024-10-18018 October 2024 SLR Environmental Preapplication Meeting Summary ML24303A4102024-10-17017 October 2024 Dir Results Letter to NRC - Hatch - Hurricane Helene IR 05000321/20244012024-10-10010 October 2024 Security Baseline Inspection Report 05000321-2024401 and 05000366-2024401 ML24256A0282024-09-12012 September 2024 2024 Hatch Requal Inspection Corporate Notification Letter NL-23-0930, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-09-11011 September 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 NL-24-0334, 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc2024-09-0303 September 2024 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc IR 05000321/20240912024-08-27027 August 2024 NRC Investigation Report 2-2023-003 and NOV - NRC Inspection Report 05000321/2024091 and 05000366/2024091 IR 05000321/20240052024-08-26026 August 2024 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2 - Report 05000321/2024005 and 05000366/2024005 NL-24-0313, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information2024-08-23023 August 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information IR 05000321/20240022024-08-0808 August 2024 Edwin I Hatch Nuclear Plants, Units 1 and 2 – Integrated Inspection Report 05000321-2024002 and 05000366-2024002 NL-24-0290, Response to Request for Additional Information Related to Request for Specific Exemption2024-07-26026 July 2024 Response to Request for Additional Information Related to Request for Specific Exemption NL-24-0276, Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-07-26026 July 2024 Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24198A1252024-07-16016 July 2024 Edwin I Hatch Nuclear Plant Units 1 - 2 Notification of Conduct of Title 10 of the Code of Federal Regulations 50 NL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 05000321/LER-2024-002-01, Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications2024-07-0303 July 2024 Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications 05000321/LER-2024-003, Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link2024-07-0303 July 2024 Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0239, Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-1392024-06-17017 June 2024 Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-139 ML24163A0532024-06-14014 June 2024 Audit Plan - Alternative Seismic Method LAR NL-24-0148, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-06-0404 June 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML24149A0492024-06-0404 June 2024 SNC Fleet - Regulatory Audit in Support of Review of the License Amendment Request to Revise TS 1.1, Use and Application Definitions, and Add New Technical Specification 5.5.21 and 5.5.17, Online Monitoring Program, NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations IR 05000321/20240902024-05-15015 May 2024 NRC Inspection Report 05000321-2024090 and 05000366-2024090, Investigation Report 2-2023-003; and Apparent Violation NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 05000321/LER-2024-002, Manual Reactor Trip Due to Loss of Feedwater2024-05-0909 May 2024 Manual Reactor Trip Due to Loss of Feedwater NL-24-0195, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water.2024-05-0707 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water. NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 IR 05000032/20240112024-04-25025 April 2024 Notification of Edwin I. Hatch Nuclear Plant - Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 0500032/2024011 and 05000366/2024011 NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 ML23032A3322024-04-24024 April 2024 Issuance of Amendments Nos. 322 and 267, Regarding LAR to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in TS Table 1.1-1, Modes 05000366/LER-2024-002, Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications2024-04-24024 April 2024 Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications IR 05000321/20240012024-04-22022 April 2024 Integrated Inspection Report 05000321/2024001 and 05000366/2024001 NL-24-0026, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint2024-04-19019 April 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint 05000321/LER-2024-001, Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La)2024-04-0909 April 2024 Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La) NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. ML23275A2402024-03-22022 March 2024 SNC Fleet - Issuance of Environmental Assessment and Finding of No Significant Impact Regarding Exemption from the Requirements of 10 CFR Part 73, Section 73.2, Definitions (EPID Nos. L-2023-LLE-0018 & L-2023-LLE-0021) - Letter NL-24-0062, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-03-12012 March 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0089, Correction of Technical Specification Omission2024-03-0909 March 2024 Correction of Technical Specification Omission ML24069A0012024-03-0909 March 2024 – Correction of Amendment No. 266 Regarding License Amendment Request Regarding Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program (TSTF-425, Revision 3) ML24047A0362024-03-0404 March 2024 Response to Hatch and Vogtle FOF Dates Change Request (2025) NL-24-0061, Cycle 32 Core Operating Limits Report Version 12024-03-0101 March 2024 Cycle 32 Core Operating Limits Report Version 1 2024-09-09
[Table view] Category:License-Operator Examination Report
MONTHYEARML23206A0542023-07-25025 July 2023 2A, Exam Administrative Items (Hatch 2021-301) ML23206A0502023-07-25025 July 2023 2A, Exam Final Items (Hatch 2021-301) IR 05000321/20213022022-01-21021 January 2022 NRC Operator License Examination Report 05000321/2021302 and 05000366/2021302 ML21111A0292021-04-19019 April 2021 301, Exam Report ML20231A2362020-08-18018 August 2020 301, Corporate Notification Letter (210-day Letter) IR 05000321/20193012019-10-17017 October 2019 NRC Operator License Examination Report 05000321/2019301 and 05000366/2019301 IR 05000321/20173012018-01-23023 January 2018 NRC Operator License Examination Report 05000321/2017301 and 05000366/2017301 IR 05000321/20153012015-04-30030 April 2015 Er 05000321/2015301 and 05000366/2015301; March 23 - 30, 2015, and April 9, 2015; Edwin I. Hatch Nuclear Plant, Units 1 and 2; Operator License Examinations ML15084A5512015-03-20020 March 2015 Operator Licensing Written Examination Approval 05000321/2015301 and 05000366/2015301 IR 05000321/20123012012-08-0909 August 2012 Er 05000321-12-301 & 05000366-12-301, on 06/18-20/12 - 06/28/12, Edwin I. Hatch, Units 1 & 2 IR 05000321/20113012011-07-28028 July 2011 Er 05000321/11-301 and 05000366/11-301, on June 6 - 10, 2011, and June 23, 2011, Edwin I. Hatch Nuclear Plant, Units 1 and 2, Operator License Examinations IR 05000321/20093022009-12-0303 December 2009 Er 05000321-09-302 and 05000366-09-302, on October 26 - 30, 2009, & November 12, 2009; Edwin I. Hatch Nuclear Plant, Units 1 & 2; Operator License Examinations ML0914802702009-05-28028 May 2009 NRC Operator License Examination Report 05000321-09-301 and 05000366-09-301 ML0911800212009-04-27027 April 2009 April Exam 05000321/2009301 & 05000366/2009301 Approval Letter 4-27-2009 ML0801004082008-01-10010 January 2008 Er 05000321-07-301 & Er 05000366-07-301; on 12/03 - 06, 2007 & 12/10, 2007, Southern Nuclear Operating Company, Inc.; E. I. Hatch, Units 1 & 2, NRC Examination Report 2023-07-25
[Table view] |
Text
January 21, 2022
Mr. E. D. Dean III Site Vice President Southern Nuclear Operating Company, Inc.
Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513
SUBJECT: EDWIN I. HATCH NUCLEAR PLANT - NRC OPERATOR LICENSE EXAMINATION REPORT 05000321/2021302 AND 05000366/2021302
Dear Mr. Dean :
During the period December 6 - 14, 2021 the Nuclear Regulatory Commission (NRC)
administered operating tests to employees of your company who had applied for licenses to operate the Edwin I. Hatch Nuclear Plan At the conclusion of the tests, the examiners discussed preliminary findings related to the operating tests and the written examination submittal with those members of your staff identified in the enclosed repor The written examination was administered by your staff on December 21, 202 All applicants passed both the operating test and written examinatio There were no post-examination comment A Simulator Fidelity Report is included in this report as Enclosure The initial examination submittal was within the range of acceptability expected for a proposed examinatio All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 1 In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS).
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
E. D. Dean 2
If you have any questions concerning this letter, please contact me at (404) 997-4 66
Sincerely,
/RA/
Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety
Docket Nos.: 50-321, 50 -366 License Nos.: DPR-57, NPF-5
Enclosures:
1. Report Details 2. Simulator Fidelity Report
cc: Distribution via Listserv
ML22024A072 SUNSI REVIEW COMPLETE FORM 665 ATTACHED
OFFICE RII/DRS/OB RII/DRS/OB RII/DRS/OB NAME D. Egelstad D. Lanyi G. Guthre DATE 1/21/2022 1/21 /2022 1/ 21 /2022
U.S. NUCLEAR REGULATORY COMMISSION
Examination Report
Docket No.: 50-321, 50-366
License No.: DPR-57, NPF-5
Report No.: 05000321/2021302 and 05000366/2021302
Enterprise Identifier: L-2021-OLL -0042
Licensee: Southern Nuclear Operating Company (SNC)
Facility: Edwin I. Hatch Nuclear Plant, Units 1 and 2
Location: Baxley, GA
Dates: Operating Test - December 6 - 14, 2021 Written Examination - December 21, 2021
Examiners: D. Lanyi, Chief Examiner, Operations Engineer M. Kennard, Senior Operations Engineer J. Viera, Senior Operations Engineer M. Donithan, Operations Engineer K. Kirchbaum, Operations Engineer
Approved by: Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety
Enclosure 1 SUMMARY
ER 05000321/2021302, 05000366/2021302; December 6 - 14, 2021 & December 21, 2021; Edwin I. Hatch Nuclear Plant; Operator License Examination Nuclear Regulatory Commission (NRC) examiners conducted an initial examination in accordance with the guidelines in Revision 11, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicabl Members of the Edwin I. Hatch Nuclear Plant staff developed both the operating tests and the written examinatio The initial operating test, written RO examination, and written SRO examination submittals met the quality guidelines contained in NUREG -102 The NRC administered the operating tests during the period December 6 - 14, 202 Members of the Edwin I. Hatch Nuclear Plant training staff administered the written examination on December 21, 202 F our Reactor Operator (RO) and eight Senior Reactor Operator (SRO)
applicants passed both the operating test and written examinatio All appli cants were issued licenses commensurate with the level of examination administere There were n o post-examination comment No findings were identifie REPORT DETAILS OTHER ACTIVITIES
4OA5 Operator Licensing Examinations Inspection Scope
The NRC evaluated the submitted operating test by combining the scenario events and JPMs in order to determine the percentage of submitted test items that required replacement or significant modificatio The NRC also evaluated the submi tted written examination questions (RO and SRO questions considered separately) in order to determine the percentage of submitted questions that required replacement or significant modification, or that clearly did not conform with the intent of the approv ed knowledge and ability (K/A) statemen Any questions that were deleted during the grading process, or for which the answer key had to be changed, were also included in the count of unacceptable question The percentage of submitted test items that were unacceptable was compared to the acceptance criteria of NUREG -1021, Operator Licensing Standards for Power Reactors.
The NRC reviewed the licensees examination security measures while preparing and administering the examinations in order to ensure compliance with 10 CFR §55.49, Integrity of examinations and test The NRC performed an audit of license applications during the preparatory site visit in order to confirm that they accurately reflected the subject applicants qualifications in accordance with NUREG-102 The NRC administered the operating tests during the period December 6 - 14, 202 The NRC examiners evaluated f our Reactor Operator (RO) and eight Senior Reactor Operator (SRO) applicants using the guidelines contained in NUREG -102 Members of the Edwin I. Hatch Nuclear Plant training staff administered the written examination on December 21, 202 Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate the Edwin I. Hatch Nuclear Plant, met the requirements specified in 10 CFR Part 55, Operators License The NRC evaluated the performance or fidelity of the simulation facility during the preparation and conduct of the operating test Findings
No findings were identifie The NRC developed the written examination sample plan outlin Members of the Edwin I. Hatch Nuclear Plant training staff developed both the operating tests and the written examination.All examination material was developed in accordance with the guidelines contained in Revision 11 of NUREG-102 The NRC examination team reviewed the proposed examinatio Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination material The NRC determined using NUREG-1021 that the licensees initial examination submittal was within the range of acceptability expected for a proposed examinatio All applicants passed both the operating test and written examination and were issued license Copies of all individual examination reports were sent to the facility Training Manager for evaluation of weaknesses and determination of appropriate remedial trainin The licensee did not submit any post-examination comments. A copy of the final written examination and answer key, with all changes incorporated, may be accessed not earlier than January 22, 2023, in the ADAMS system (ADAMS Accession Numbers ML22010A278 and ML22010A277).
4OA6 Meetings, Including Exit
Exit Meeting Summary
On December 14, 2021 the NRC examination team discussed generic issues associated with the operating test with M John Weissinger, Plant Manager, and members of the Edwin I. Hatch Nuclear Plant staf The examiners asked the licensee if any of the examination material was proprietar No proprietary information was identifie KEY POINTS OF CONTACT
Licensee Personnel
John Weissinger, Plant Manager Tony Lewis, Training Director Matt Busch, Operations Director Charlie Edmund, Operations Senior Instructor Anthony Ball, Operations Instructor
NRC personnel
Rich Smith, Senior Resident Inspector
SIMULATOR FIDELITY REPORT
Facility Licensee: Edwin I. Hatch Nuclear Plant
Facility Docket No.: 05000321, 05000366
Operating Test Administered: December 6 - 14, 2021
This form is used only to report observation These observations do not constitute audit or inspection findings and, without further verification and review in accordance with Inspection Procedure 71111.11, Licensed Operator Requalification Program and Licensed Operator Performance, are not indicative of noncompliance with 10 CFR 55.46, Simulation Facilities.
No licensee action is required in response to these observation No simulator fidelity or configuration issues were identifie Enclosure 2