ML18337A403
| ML18337A403 | |
| Person / Time | |
|---|---|
| Site: | Hatch, Vogtle, Farley |
| Issue date: | 12/06/2018 |
| From: | Michael Orenak Plant Licensing Branch II |
| To: | Gayheart C Southern Nuclear Operating Co |
| Orenak M | |
| References | |
| EPID L-2018-LLA-0233 | |
| Download: ML18337A403 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 6, 2018 Ms. Cheryl A. Gayheart Regulatory Affairs Director Southern Nuclear Operating Co., Inc.
3535 Colonnade Parkway Birmingham, AL 35243
SUBJECT:
EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2, JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2, AND VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RE: REVISE TECHNICAL SPECIFICATION 5.2.2.g AND UPDATE EMERGENCY PLAN MINIMUM ON-SHIFT STAFF TABLES (EPID L-2018-LLA-0233)
Dear Ms. Gayheart:
By letter dated August 9, 2018, Southern Nuclear Operating Company (SNC) submitted a license amendment request to revise Technical Specification 5.2.2.g, "Unit Staff," for the Edwin I. Hatch Nuclear Plant (Hatch), Units 1 and 2, the Joseph M. Farley Nuclear Plant, Units 1 and 2, (Farley), and the Vogtle Electric Generating Plant, Units 1 and 2. Additionally, SNC requested the approval.of a revision to the minimum on-shift staffing tables in annexes associated with the SNC Standard Emergency Plan (SEP) and an accompanying editorial change in the SEP for Hatch and Farley. The proposed changes would eliminate the dedicated Shift Technical Advisor from the on-shift emergency response organization.
The U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information is needed for the NRC to complete its review. During a call on December 4, 2018, Mr. Joyce of your staff agreed that SNC will respond by January 11, 2019. Please note that the NRC staff's review is continuing and further requests for information may be developed.
Docket Nos. 50-321, 50-366,30-348, 50-364, 50-424 and 50-425
Enclosure:
Request for Additional Information cc w/enclosure: Listserv s;q~
Michael D. Orenak, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
REQUEST FOR ADDITIONAL INFORMATION REGARDING CHANGES TO TECHNICAL SPECIFICATION 5.2.2.G AND UPDATE EMERGENCY PLAN MINIMUM ON-SHIFT STAFF TABLES SOUTHERN NUCLEAR OPERATING COMPANY. INC.
EDWIN I. HATCH NUCLEAR PLANT. UNITS 1 AND 2 JOSEPH M. FARLEY NUCLEAR PLANT. UNITS 1 AND 2 VOGTLE ELECTRIC GENERATING PLANT. UNITS 1 AND 2 SOUTHERN NUCLEAR OPERATING COMPANY DOCKET NOS. 50-321. 50-366.30-348. 50-364. 50-424 AND 50-425 By letter dated August 9, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18226A108), Southern Nuclear Operating Company (SNC) submitted a license amendment request to revise Technical Specification 5.2.2.g, "Unit Staff,"
for the Edwin I. Hatch Nuclear Plant (Hatch), Units 1 and 2, the Joseph M. Farley Nuclear Plant, Units 1 and 2, (Farley), and the Vogtle Electric Generating Plant, Units 1 and 2. Additionally, SNC requested the approval of a revision to the minimum on-shift staffing tables in annexes associated with the SNC Standard Emergency Plan (SEP) and an accompanying editorial change in the SEP for Hatch and Farley. The proposed changes would eliminate the dedicated Shift Technical Advisor (STA) from the on-shift emergency response organization.
The U.S. Nuclear Regulatory Commission (NRC) staff has determined that the following information is needed to complete its review.
Request for Additional Information 1 SNC proposes to eliminate a dedicated STA position at Farley and Hatch by allowing the STA functions to be combined with one or more of the required senior reactor operator positions. SNC further proposes a revision to the on-shift staffing tables in the Farley and Hatch annexes associated with the SNC Standard Emergency Plan to allow the on-shift Shift Support Supervisor to perform the STA function in addition to currently assigned emergency response organization duties. As proposed, this individual is designated as the Shift Support Supervisor/Fire Brigade Leader.
Please explain how Farley and Hatch will ensure that an individual that meets the Commission Policy Statement of Engineering Expertise on Shift (50 FR 43621) and is also the fire brigade leader will be available to provide advisory technical support for events concurrent with manning the fire brigade.
Enclosure
ML18337A403 OFFICE NRR/DORL/LPL2-1 /PM NAME MOrenak DATE 12/04/18.
OFFICE N RR/DORL/LPL2-1 /BC NAME MMarkley DATE 12/06/18 NRR/DORL/LPL2-1/LA KGoldstein 12/04/18 DORL/LPL2-1 /PM MOrenak 12/06/18