Letter Sequence RAI |
---|
|
|
MONTHYEARNL-14-0649, Units 1 and 2 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-3602015-08-11011 August 2015 Units 1 and 2 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 Project stage: Request ML15331A3372016-02-0303 February 2016 License Amendment Request Unacceptable with Opportunity to Supplement Project stage: Acceptance Review NL-16-0261, Response to License Amendment Request Unacceptable with Opportunity to Supplement2016-03-16016 March 2016 Response to License Amendment Request Unacceptable with Opportunity to Supplement Project stage: Supplement ML16109A2462016-05-11011 May 2016 Acceptance Review of Southern Nuclear Operating Company, Inc. License Amendment Request - Adoption of TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 Project stage: Acceptance Review NL-16-0827, E. I. Hatch, Units 1 and 2 - Withdrawal of TSTF-500 Request to Increase the Completion Time for the Station Service Batteries from 2 to 12 Hours2016-06-17017 June 2016 E. I. Hatch, Units 1 and 2 - Withdrawal of TSTF-500 Request to Increase the Completion Time for the Station Service Batteries from 2 to 12 Hours Project stage: Withdrawal ML16194A4282016-07-12012 July 2016 E-mail Draft Request for Additional Information for Technical Clarification Project stage: Draft Request ML16195A4002016-07-13013 July 2016 Request for Additional Information License Amendment Request to Revise Technical Specifications Regarding TSTF-500 Project stage: RAI NL-16-1169, Response to Request for Additional Information on Technical Specifications - Revision Request to Implement TSTF-500, DC Electrical Re-Write.2016-08-12012 August 2016 Response to Request for Additional Information on Technical Specifications - Revision Request to Implement TSTF-500, DC Electrical Re-Write. Project stage: Response to RAI NL-16-1564, Revised Technical Specifications Pages for Technical Specifications Revision Request to Implement TSTF-500, DC Electrical Re-Write.2016-09-20020 September 2016 Revised Technical Specifications Pages for Technical Specifications Revision Request to Implement TSTF-500, DC Electrical Re-Write. Project stage: Other ML16271A1692016-10-17017 October 2016 Request for Additional Information Project stage: RAI NL-17-0063, Response to Verbal Request for Additional Information on Technical Specifications Revision Request to Implement TSTF-500, DC Electrical Re-write2017-02-0606 February 2017 Response to Verbal Request for Additional Information on Technical Specifications Revision Request to Implement TSTF-500, DC Electrical Re-write Project stage: Request NL-17-0810, Transmittal of Marked-Up and Clean Technical Specifications Pages for Section 5.5.15 for HNP Implementation of TSTF-500, DC Electrical Rewrite.2017-05-11011 May 2017 Transmittal of Marked-Up and Clean Technical Specifications Pages for Section 5.5.15 for HNP Implementation of TSTF-500, DC Electrical Rewrite. Project stage: Request ML17208A2312017-08-29029 August 2017 Issuance of Amendments Regarding the Adoption of TSTF 500, DC Electrical Rewrite - Update to TSTF 360 Project stage: Approval 2016-07-12
[Table View] |
Similar Documents at Hatch |
---|
Category:E-Mail
MONTHYEARML24302A0672024-10-25025 October 2024 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Revise Technical Specifications to Increase Safety/Relief Valve (S/Rv) Setpoints License Amendment Request (LAR) ML24290A1552024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley, Hatch, and Vogtle 1 and 2 - Proposed Alternative Request for Code Case N-572 ML24220A2502024-10-15015 October 2024 Email to Ryan Joyce Re Decision on the Hatch Exemption ML24220A2472024-10-11011 October 2024 Email to Ryan Joyce Re Availability of EA-FONSI for Hatch Exemption ML24281A1362024-10-0707 October 2024 NRR E-mail Capture - (External_Sender) Acceptance Review - Hatchs Revise Technical Specifications to Adopt TSTF-591 LAR (L-2024-LLA-0122) ML24278A0052024-10-0303 October 2024 Document Request for Hatch Nuclear Plant - IP 92702 Follow-Up Radiation Protection Inspection - Inspection Report 2024-04 ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24211A0162024-07-26026 July 2024 NRR E-mail Capture - Request for Additional Information - Hatch, Units 1 and 2, Revise TS SRs (3.4.3.1 & 3.1.7.7) to Increase SRV Setpoints LAR ML24194A0032024-07-11011 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley, Hatch, and Vogtle 1 and 2 - Alternative Request for Code Case N-572 ML24193A1182024-07-10010 July 2024 Email to SNC with RAI for Hatch Exemption Request ML24170A9362024-06-18018 June 2024 NRR E-mail Capture - Fyi - Change to Estimated Completion Date for the SNC Fleet Physical Barrier Exemptions (L-2023-LLE-0018 and L-2023-LLE-0021) ML24142A4992024-05-21021 May 2024 NRR E-mail Capture - Acceptance Review - Farley and Hatch - LAR to Revise TS 1.1 and Add Online Monitoring (OLM) Program (L-2024-LLA-0058) ML24138A1582024-05-17017 May 2024 NRR E-mail Capture - (External_Sender) Acceptance Review - Hatchs Revise TS Surveillance Requirements to Increase SRV Setpoints LAR (L-2024-LLA-0054) ML24100A4402024-04-0909 April 2024 NRR E-mail Capture - (External_Sender) RAI - Hatch, Units 1 and 2, Revise Technical Specifications to Adopt Extended RICTs for RHRSW and Psw Systems LAR ML24100A0072024-04-0808 April 2024 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML24082A1212024-03-21021 March 2024 NRR E-mail Capture - (External_Sender) Re Acceptance Review - Hatchs Adopt Alternative Seismic Method for 50.69 Categorization of SSCs LAR (L-2024-LLA-0017) ML24067A0702024-03-0707 March 2024 NRR E-mail Capture - Change in Estimated Review Completion for Hatch Revise TS Table 1.1-1 (Modes) LAR (L-2022-LLA-0120) ML24009A1112024-01-0909 January 2024 NRR E-mail Capture - Acceptance Review - Hatch 1&2 LAR - Revise TS 3.7.1 & 3.7.2 to Adopt Risk-Informed Completion Times for RHRSW and Psw Systems (L-2023-LLA-0169) ML23354A2032023-12-18018 December 2023 Document Request for Hatch Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-01 ML23264A0142023-09-14014 September 2023 NRR E-mail Capture - (External_Sender) Draft Round-2 RAI - Hatch, Units 1 and 2, Revise TS 1.1-1 Modes LAR ML23249A2082023-09-0606 September 2023 NRR E-mail Capture - Change in Estimated Review Schedule and Level of Effort for Hatch Revise TS Table 1.1-1 (Modes) LAR (L-2022-LLA-0120) ML23223A0142023-08-10010 August 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical Barriers ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23135A0922023-05-11011 May 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Request to Use Specific Provision of a Later Edition of the ASME BPV Code, Section XI (L-2023-LLR-0016) ML23073A0252023-03-13013 March 2023 NRR E-mail Capture - Fyi - Closeout the Evacuation Time Estimate (ETE) Reviews for SNC Fleet ML23065A0922023-03-0505 March 2023 NRR E-mail Capture - Revised Estimate Hours and Completion Date - Hatch RPV Head Closure Bolts LAR (L-2022-LLA-0120) ML23033A0952023-02-0202 February 2023 NRR E-mail Capture - (External_Sender) Re for Your Comments - State of Georgia - Hatch Units 1 and 2 - Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML23033A0282023-01-30030 January 2023 NRR E-mail Capture - Revised Estimates for Hatch RPV Studs LAR ML23026A0132023-01-19019 January 2023 NRR E-mail Capture - Revised Estimates for Hatch RPV Studs LAR ML23018A1872023-01-17017 January 2023 2023 HNP CGD Inspection Information Request ML23006A0662023-01-0505 January 2023 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Revise NFPA-805 License Amendment Request ML22355A2082022-12-21021 December 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, Reactor Pressure Vessel RPV Head Studs LAR ML23006A0252022-12-13013 December 2022 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - TSTF-208 License Amendment Request ML22341A1212022-12-0606 December 2022 NRR E-mail Capture - Recap of Takeaways from Hatch Audit on Dec 1, 2022 ML23026A2372022-11-16016 November 2022 2023001 Hatch RP RFI Final ML22305A7032022-11-0101 November 2022 NRR E-mail Capture - Potential Audit for Hatchs RPV Head Studs LAR ML22258A1532022-09-15015 September 2022 NRR E-mail Capture - Acceptance Review - Hatch Closure Studs in TS Table 1.1-1 Modes LAR (L-2022-LLA-0120) ML22251A1322022-09-0808 September 2022 NRR E-mail Capture - Fyi - Hatch TSTF-505 LAR ML22208A1332022-07-26026 July 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-208 LAR ML22207B8532022-07-25025 July 2022 NRR E-mail Capture - RCI - Hatch, Units 1 and 2, Revision to NFPA-805 LAR ML22157A3552022-06-0606 June 2022 NRR E-mail Capture - Revised Estimates - Hatch TSTF-505 LAR ML22157A3542022-06-0606 June 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-505 LAR ML22140A1192022-05-20020 May 2022 NRR E-mail Capture - RAIs - Hatch, Units 1 and 2, TSTF-505 LAR ML22138A4122022-05-18018 May 2022 NRR E-mail Capture - Acceptance Review - Hatch TSTF-208 LAR (L-2022-LLA-0045) ML22140A1182022-05-13013 May 2022 NRR E-mail Capture - for Your Action: Hatch TSTF-505 - Follow Up from Audit Question 12 ML22116A1492022-04-26026 April 2022 NRR E-mail Capture - Acceptance Review - Hatch Revise NFPA 805 LAR (L-2022-LLF-0000) ML22055A6652022-02-24024 February 2022 NRR E-mail Capture - Acceptance Review - Hatch TSTF-580 LAR (L-2022-LLA-0022) ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21357A0912021-12-23023 December 2021 NRR E-mail Capture - Acceptance Review - Hatch TSTF-207-A LAR (L-2021-LLA-0219) 2024-09-04
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24290A1552024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley, Hatch, and Vogtle 1 and 2 - Proposed Alternative Request for Code Case N-572 ML24278A0052024-10-0303 October 2024 Document Request for Hatch Nuclear Plant - IP 92702 Follow-Up Radiation Protection Inspection - Inspection Report 2024-04 ML24211A0162024-07-26026 July 2024 NRR E-mail Capture - Request for Additional Information - Hatch, Units 1 and 2, Revise TS SRs (3.4.3.1 & 3.1.7.7) to Increase SRV Setpoints LAR ML24208A1742024-07-26026 July 2024 Request for Additional Information Regarding License Amendment Request to Revise TS SRs (3.4.3.1 & 3.1.7.7) to Increase S/Rv Setpoints ML24193A1182024-07-10010 July 2024 Email to SNC with RAI for Hatch Exemption Request ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23354A2032023-12-18018 December 2023 Document Request for Hatch Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-01 ML23250A0472023-09-20020 September 2023 – Request for Additional Information Regarding License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts in Technical Specifications Table 1.1-1, Modes ML23264A0142023-09-14014 September 2023 NRR E-mail Capture - (External_Sender) Draft Round-2 RAI - Hatch, Units 1 and 2, Revise TS 1.1-1 Modes LAR ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23018A1872023-01-17017 January 2023 2023 HNP CGD Inspection Information Request ML22355A2082022-12-21021 December 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, Reactor Pressure Vessel RPV Head Studs LAR ML23026A2372022-11-16016 November 2022 2023001 Hatch RP RFI Final ML22208A1332022-07-26026 July 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-208 LAR ML22157A3542022-06-0606 June 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-505 LAR ML22140A1192022-05-20020 May 2022 NRR E-mail Capture - RAIs - Hatch, Units 1 and 2, TSTF-505 LAR ML22073A0842022-03-21021 March 2022 An NRC Fire Protection Team Inspection (NRC Inspection Report Nos. 05000321/2022011 and 05000366/2022011) and Request for Information ML22025A2142022-01-21021 January 2022 Plant Hatch 2022001 RP Baseline Inspection Information Request ML21265A3402021-09-22022 September 2021 NRR E-mail Capture - Request for Additional Information - Hatch, Unit 1, Emergency TS 3.7.2 LAR ML21111A3032021-04-21021 April 2021 NRR E-mail Capture - RAI - Hatch Unit 2 - One-Time Emergency RHR LAR (L-2020-LRO-0068) ML21110A6842021-04-20020 April 2021 NRR E-mail Capture - RAI - Hatch Unit 2 - One-Time Emergency RHR LAR (L-2020-LRO-0068) ML21013A4112021-01-13013 January 2021 Notification of Edwin I. Hatch Nuclear Plant Design Bases Assurance Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000321/2021010 and 05000366/2021010 ML20293A0752020-10-14014 October 2020 NRR E-mail Capture - RAIs for SNC Fleet EP LAR (L-2020-LLA-0150 and L-2020-LLA-0151) ML20253A2732020-09-0909 September 2020 Requalification Program Inspection Hatch Nuclear Station ML20149K6252020-05-27027 May 2020 NRR E-mail Capture - RAIs for SNC Fleet Fire Protection Exemption Requests NL-19-1532, Units 1 and 2 - Response to Requests for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures. Systems and Components for Nuclear Power Reactors2019-12-18018 December 2019 Units 1 and 2 - Response to Requests for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures. Systems and Components for Nuclear Power Reactors ML19336A0142019-12-0101 December 2019 NRR E-mail Capture - RAI: Hatch Emergency TS 3.7.1 Residual Heat Removal Service Water (RHRSW) System LAR ML19280A0082019-10-0404 October 2019 NRR E-mail Capture - Request for Additional Information (RAI) - Hatch TSTF-51 LAR (L-2019-LLA-0091) ML19224C0552019-08-12012 August 2019 NRR E-mail Capture - RAI - Edwin I. Hatch Nuclear Plant, LAR Regarding Degraded Voltage (L-2019-LLA-0108) ML19220A0362019-08-0808 August 2019 NRR E-mail Capture - RAI - Edwin I. Hatch Nuclear Plant, LAR Regarding Adoption of NFPA 805, Request for Additional Information, EPID L-2018-LLA-0107 ML19164A2582019-06-13013 June 2019 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML19107A4962019-04-17017 April 2019 NRR E-mail Capture - Request for Additional Information - Hatch 1 & 2 Application to Adopt Title 10 of Code of Federal Regulations 50.69 RISK-INFORMED Categorization and Treatment of Structures, Systems and Components for Power Reactors ML19088A0092019-03-29029 March 2019 NRR E-mail Capture - Hatch 1 and 2 - LAR to Adopt NFPA 805 Fire Protection Standard, EPID L-2018-LLA-0107, Request for Additional Information ML19029B3402019-01-23023 January 2019 Southern Nuclear Operating Company, Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2 Draft Request for Additional Information for the License Amendment Requests to Adopt the Risk-Informed Provisions of Title 10 of the Code of Federal Regulat ML19016A3422019-01-10010 January 2019 U2 ISI 2019001 RFI - Bcc ML18355A4772019-01-0404 January 2019 Request for Additional Information Revise TS 5.2.2.g and Update Emergency Plan Minimum On-Shift Staff Tables ML18337A4032018-12-0606 December 2018 Request for Additional Information Revise Technical Specification 5.2.2.G and Updating Emergency Plan Minimum On-Shift Staff Tables ML18085A0132018-03-0808 March 2018 Draft Request for Additional Information on Alternative RR-V-11, Proposed Extension to Main Steam Safety Relief Valve Testing Requirements ML18058A0812018-02-27027 February 2018 Enclosurequest for Additional Information(Rai for Review of Southern Nuclear Operating Company'S Decommissioning Funding Plan Updates for Joseph M. Farley,Unit 1 and 2;Edwin I. Hatch,Units 1 and 2; and Vogtle Electric Generating Plant, Unit ML17306A0872017-11-0808 November 2017 Request for Additional Information Regarding the Decommissioning Funding Status Reports (EPID L-LRO-2017-0008) ML17284A3542017-11-0707 November 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools ML17270A1402017-09-27027 September 2017 PIR Notification Letter 2017 ML17290A3172017-09-19019 September 2017 NRR E-mail Capture - Hatch 1 and 2 - Draft Request for Additional Information Request for Alternative No. HNP-ISI-ALT-05-05 ML17111A5792017-04-26026 April 2017 Request for Additional Information, Fourth 10-Year ISI Interval Relief Requests ML17110A2112017-04-24024 April 2017 Request for Additional Information ML16330A1282016-12-0505 December 2016 Request for Additional Information ML16307A1842016-11-0202 November 2016 Request for Additional Information (Non-Proprietary) ML16271A1692016-10-17017 October 2016 Request for Additional Information ML16222A2952016-08-29029 August 2016 Request for Additional Information ML16205A0012016-07-22022 July 2016 Requalification Program Inspection - Plant Hatch 2024-07-26
[Table view] |
Text
From: Sreenivas, V Sent: Wednesday, July 13, 2016 2:36 PM To: Pierce, Chuck R.
Cc: Vidal, Ozzie C.; Joyce, Ryan M.; McElroy, G. Ken; Orenak, Michael; Foli, Adakou; Otto, Ngola; Zimmerman, Jacob
Subject:
EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION (CAC NOS. MF6611 AND MF6612)
By letter dated August 11, 2015, as supplemented by letters dated March 16 and April 4, 2016, the Southern Nuclear Operating Company (SNC) submitted a license amendment request (LAR) to revise the Technical Specifications (TS) regarding TSTF-500, DC [direct current]
Electrical Rewrite - Update to TSTF-360, for the Edwin I. Hatch Nuclear Plant, Units 1 and 2.
The LAR proposes to revise TS requirements related to DC electrical systems in TS limiting condition for operation (LCO) 3.8.4, "DC Sources - Operating," LCO 3.8.5, "DC Sources -
Shutdown," and LCO 3.8.6, "Battery Cell Parameters." A new "Battery Monitoring and Maintenance Program" is being proposed for Section 5.5 "Administrative Controls - Programs and Manuals."
Upon reviewing the March 16 and June 17, 2016, supplements, the U.S. Nuclear Regulatory Commission staff has found that further information is needed to complete its review. The Electrical Engineering Branch has reviewed the LAR and developed the following questions to complete its review:
- 1. In Attachment 3 of the LAR dated August 11, 2015, the licensee proposed revised TS 3.8.5, Condition C that states: One or more required diesel generators (DG) or station service DC electrical power subsystems inoperable for reasons other than Conditions A or B. Condition A applies to DG DC subsystems and Condition B applies to station service DC subsystems.
Since Conditions A and B are applicable to two different DC subsystems (i.e.,
DG and station service), please address the conditions for inoperable DG DC subsystems and inoperable station service DC subsystems for consistency with TS 3.8.4. Please justify why two separate actions are not proposed.
- 2. In Attachment 3 of the LAR, the licensee proposed new TS 3.8.4, Condition B, which requires that the DG battery float current be verified to see whether it is less than or equal to 5 amps. The licensee explains that the HNP Units 1 and 2 station service batteries and DG batteries have different required float currents for determining that their respective batteries are charged. This requires different conditions for station service battery chargers inoperable and DG battery chargers inoperable, since different values of battery float current are required to be verified. In the proposed TS 3.8.4, Condition B requires that the DG battery float current be verified to see whether it is less than or equal to 5 amps. Similarly, in TS 3.8.4, Condition D requires that the station service battery float current be verified to see whether it is less than or equal to 20 amps. In the revised TS Bases, B3.8.4 states that the 5-amp and 20-amp values for the DG and station service battery float currents, respectively, is based on returning the battery to 95% charge and assumes a 5%
design margin for the battery. However, the licensee did not provide an explanation
of how the actual values for the float current for the station service and diesel generator batteries were derived.
Please provide a summary of the evaluation used to establish the values of the 5-amp and 20-amp float currents for the HNP Units 1 and 2 DG DC batteries and station service DC batteries, respectively.
- 3. In Attachment 1 of the LAR, the licensee proposed a variation with respect to pilot cell selection. The licensee stated that HNP will not take temperature into account when selecting the battery pilot cells because the HNP station service and diesel generator batteries do not exhibit a temperature deviation across the battery of greater than 5 degrees Fahrenheit in accordance with the IEEE Standard 450-2002.
As discussed in the TSTF-500, Section 4.0, Technical Analysis, batteries are normally sized with temperature, aging, and design correction margins. Regarding the selection of pilot cells, the TSTF-500 states: Previously, average battery temperature was monitored instead of pilot cell temperature. As a result, temperature was not a criterion with selecting a pilot cell. In order to use pilot cell temperature instead of the average battery temperature, temperature must be used as a criteria when selecting the pilot cell. [] For batteries where it could be shown that the maximum temperature deviation across the battery did not exceed the IEEE 450 recommended maximum of 5°F [degrees Fahrenheit], the NRC has accepted that the cell temperature was not a critical parameter. Therefore, for these batteries, cell temperature did not have to be taken into account when selecting pilot cells.
Please provide information to support the fact that HNP station service and diesel generator batteries do not exhibit a temperature deviation across the battery of greater than 5 degrees Fahrenheit. Please provide analysis supporting temperature deviations for the HNP batteries based on operation experience. Also, please discuss provide the method for selection of pilot cells at HNP.
- 4. In HNP LAR, the licensee proposed a new SR 3.8.6.6 (relocation and revision of current SR 3.8.4.8), where the DG and station service battery capacity is verified to ensure that the battery capacity is greater than 80 percent of the manufacturers rating. The licensee proposed to specify the surveillance frequency for new SR 3.8.6.6 in the Surveillance Frequency Control Program (SFCP) per the provisions of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control -
RITSTF Initiative 5b. Thus, new SR 3.8.6.6 frequency states In Accordance with the Surveillance Frequency Control Program. However, HNP current SR 3.8.4.8 has 3 frequencies, as follows:
In Accordance with the Surveillance Frequency Control Program AND 12 months when battery shows degradation or has reached 85% of expected life with capacity less than 100% of the manufacturers rating AND 24 months when battery has reached 85% of expected life with capacity is greater than or equal to 100% of the manufacturers rating.
The staff notes that the proposed frequency for new SR 3.8.6.6 is a change from the HNP current TS and a deviation from TSTF-500, Rev. 2 (Improved Standard TS (ISTS) Rev. 1) SR 3.8.6.6. TSTF-500, SR 3.8.6.6 frequencies states: 60 months AND 12 months when battery shows degradation or has reached 85% of expected life with capacity less than 100% of the manufacturers rating AND 24 months when battery has reached 85% of expected life with capacity is greater than or equal to 100% of the manufacturers rating.
Furthermore, according to TSTF-425, all frequencies can be relocated to the SFCP except frequencies that are related to specific conditions (e.g., battery degradation, age and capacity). The 12-month and 24-month frequencies of HNP current SR 3.8.4.8 and TSTF-500, SR 3.8.6.6 are related to battery degradation and age and, therefore, should not be relocated to the SFCP.
Please provide justification for the deviation from HNP current TS and TSTF-500, Rev. 2 (ISTS Rev. 1) with regards to the frequency for new SR 3.8.6.6. Also, if the 12-month and 24-month frequencies for HNP current SR 3.8.4.8 are relocated to the SFCP for new SR 3.8.6.6, please provide justification for relocating these degradation and age-related frequencies to the SFCP.
- 5. In Attachment 3 of the HNP LAR, the licensee proposed new Condition E to TS 3.8.6 that applies to a battery found with a pilot cell electrolyte temperature less than the minimum established design limit. The required action associated with new Condition E requires the licensee to restore the pilot cell electrolyte temperature to greater than or equal to the minimum established design limits within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. In Attachment 1 of the LAR, the licensee states: SNC verifies that temperature excursion could reasonably expect to be detected and corrected prior to the average battery electrolyte temperature dropping below the minimum electrolyte temperature.
Please discuss how the battery room temperature is monitored at HNP, and provide the minimum frequency at which the temperature of the battery room is monitored.
Also, please explain how the licensee would restore battery room temperature if it was outside the temperature design limits.
- 6. In Attachment 3 of the LAR, the licensee proposed adopting TSTF-500 TS 3.8.4, Condition A and Condition E as new Condition B and revised Condition G, respectively, for HNP TS 3.8.4. HNP TS 3.8.4 new Condition B applies when the Unit DG DC battery charger on one subsystem is inoperable. When the required action and associated completion time associated with new Condition B are not met, revised Condition G requires the plant to be in Mode 3 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and Mode 4 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. However, TSTF-500, Condition E requires the DG associated with the battery charger to be declared inoperable immediately when the required action and completion time of Condition A are not met.
Please provide justification for deviating from the required action and completion time for TSFT-500, TS 3.8.4, Condition E.
- 7. In Attachment 3 of the LAR, the licensee proposed adding new Conditions A and B to HNP Units 1 and 2 TS 3.8.5.
New Condition A states: One required battery one or more required DG DC subsystems inoperable AND the redundant subsystem battery and required chargers OPERABLE.
New Condition B states: One or more required battery chargers on one required station service DC subsystems inoperable AND the redundant subsystem battery and required chargers operable.
The actions statements for new Conditions A and B actions are based on the adoption of TSTF-500 TS 3.8.5 Condition A. Per TSTF-500, Condition A is included in the TS only when the plant-specific implementation of TS 3.8.5 may require both a DC electrical power subsystem and its redundant subsystem to be operable.
Please clarify whether HNP Units 1 and 2 TS requires the above-mentioned redundant subsystems to be operable. If the redundant subsystems are required to be operable, please consider adding the terms required DG DC and required station service DC to the redundant subsystems in Condition A and Condition B, respectively, for consistency with the first parts of the Conditions. If the redundant subsystems are not required per TS 3.8.5, please justify the adoption of TSTF-500, TS 3.8.5, Condition A.
- 8. In Attachment 3 of the LAR, the licensee proposed a battery cell float voltage limit of greater than 2.07 Volt as reflected in proposed TS 3.8.6 required action A.3, SR 3.8.6.2, and SR 3.8.6.5. According to TSTF-500 TS 3.8.6, the battery cell float voltage limit is greater than or equal to 2.07 Volt.
Please provide justification for deviating from the TSTF-500 TS 3.8.6 with respect to the battery cell float voltage limit.
- 9. In Attachment 3 of the LAR, the licensee proposed an alternative criterion for new TS SR 3.8.4.2 which states, Verify each battery charger can recharge the battery to the fully charged state within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> while supplying the largest combined demands of the various continuous steady state loads, after a battery discharge to the bounding design basis event discharge state. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is bracketed in TSTF-500.
Please explain the basis for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Please provide your response by August 12, 2016. If you have any questions, please call me at 301-415-2597 or Mike Orenak at 301-415-3229.
V. Sreenivas, Ph.D., CPM.,
Project Manager NRR/DORL/LPL2-1 301-415-2597