October 06, 2021
SUBJECT:
EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000321/2021401 AND 05000366/2021401
Dear Mr. McGavin:
On September 23, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Edwin I. Hatch Nuclear Plant Units 1 and 2 and discussed the results of this inspection with Mr. J. Weissinger and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Jannette G. Worosilo, Chief Plant Support Branch Division Reactor Safety
Docket Nos. 05000321 and 05000366 License Nos. DPR-57 and NPF-5
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000321 and 05000366
License Numbers:
Report Numbers:
05000321/2021401 and 05000366/2021401
Enterprise Identifier: I-2021-401-0040
Licensee:
Southern Nuclear Operating Company, Inc.
Facility:
Edwin I. Hatch Nuclear Plant Units 1 and 2
Location:
Baxley, GA
Inspection Dates:
September 20, 2021 to September 23, 2021
Inspectors:
R. Patterson, Physical Security Inspector
A. Richardson, Physical Security Inspector
J. Tornow, Physical Security Inspector
Approved By:
Jannette G. Worosilo, Chief
Plant Support Branch
Division Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Edwin I. Hatch Nuclear Plant Units and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
Type Issue Number Title Report Section Status URI 05000321,05000366/20 19201-01 Security URI 71130.05 Closed
INSPECTION SCOPES
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
===inspection elements:
Access Control===
(1)
- Tier I: All Requirements
- Tier II: 8 Requirements (02.06 a - d, 02.07 a, 02.08 a, b, e)
- Tier III: 1 Requirement (02.09)
71130.05 - Protective Strategy Evaluation
The inspectors evaluated the licensee's protective strategy through completion of the following procedure elements:
Protective Strategy Evaluation (2 Samples)
(1)
- Tier I: All Requirements
- Tier II: (02.05 a, 02.06 a, d, e, f, g, h, i, j, k, l, m, n, 02.07 a, b, c, e)
(2)
- Tier III: (02.08, 02.09 a, b, 02.11 a)
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following procedure elements:
Review Security Plan Changes (IP Section 02.01) (1 Sample)
- (1) Since the last NRC inspection of this program area, Security Plan Revision 18 HNP was implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)
- (1) Unit 1 (September, 2020 through August, 2021)
Unit 2 (September, 2020 through August, 2021)
INSPECTION RESULTS
URI Security URI URI 05000321,05000366/2019201-01 71130.05
Description:
A URI was identified for whether the licensee adequately analyzed site-specific conditions that may affect the specific measures needed to design and implement the sites physical protection program. NSIR completed their review of the analysis the licensee sent to close the URI. Based on NSIR's review of the licensee's analysis the equipment in question can withstand the Design Base Threat (DBT) Waterborne Improvised Explosive Device (WBIED). No findings or violations were identified.
Corrective Action Reference(s): Licensee furnished an analysis to NSIR showing the equipment in question could withstand the DBT WBIED. No additional corrective actions were needed.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On September 23, 2021, the inspectors presented the security baseline inspection results to Mr. J. Weissinger and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
10742296
Prohibited Item Discovered
09/29/2020
Corrective Action
Documents
10744886
Inadequate Vehicle Search
10/09/2020
Corrective Action
Documents
Resulting from
Inspection
10760020
Unsearched Profile Vehicle
2/11/2020
Procedures
Plant Security and Entry Control
Version 7.6
Procedures
0S
Security Lock And Key Control
Revision 3.3
Procedures
NMP-SE-021
Security Search Processes
Version 9.0
Corrective Action
Documents
18-10544336
Corrective Action
Documents
19-10646321
Corrective Action
Documents
19-10656738
Corrective Action
Documents
19-10656748
Corrective Action
Documents
19-10656773
Corrective Action
Documents
19-10660542
Corrective Action
Documents
19-10672031
Corrective Action
Documents
20-10754196
Miscellaneous
NMP-SE-020-F05
SNC Adversary Training
Version 2.0
Miscellaneous
NMP-SE-020-F05
Drill Controller Initial/Continuing Training
Version 2.0
Procedures
NMP-SE-006
Security Drill and Exercise Program
Version 7
Procedures
NMP-SE-008
Use of Force
Version 4.2
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
NMP-SE-012
Safety/Security Interface
Version 5.0
Self-Assessments TE 1080002
Check-In Self Assessment (CISA) Hatch
June 4, 2021
71151
Corrective Action
Documents
10738547
Tamper alarm with no reset
9/14/2020
71151
Corrective Action
Documents
10757652
Alarm With No Reset
2/02/2020
71151
Corrective Action
Documents
10795677
Alarm due to environmental conditions
05/05/2021
71151
Miscellaneous
KPI Data Report
August 2021
71151
Procedures
NMP-AD-034
Key Performance Indicators
Version 11.0