IR 05000321/2021401

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000321/2021401, 05000366/2021401
ML21280A322
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 10/06/2021
From: Jannette Worosilo
NRC/RGN-II
To: Mcgavin S
Southern Nuclear Operating Co
References
IR 2021401
Download: ML21280A322 (9)


Text

October 06, 2021

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000321/2021401 AND 05000366/2021401

Dear Mr. McGavin:

On September 23, 2021, the U.S. Nuclear Regulatory Commission ( NRC) completed an inspection at Edwin I. Hatch Nuclear Plant Units 1 and 2 and di scussed the results of this inspection with Mr. J. Weissinger and other members of your sta ff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Jannette G. Worosilo, Chief Plant Support Branch Division Reactor Safety

Docket Nos. 05000321 and 05000366 License Nos. DPR-57 and NPF-5

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000321 and 05000366

License Numbers: DPR-57 and NPF-5

Report Numbers: 05000321/2021401 and 05000366/2021401

Enterprise Identifier: I-2021-401-0040

Licensee: Southern Nuclear Operating Company, Inc.

Facility: Edwin I. Hatch Nuclear Plant Units 1 and 2

Location: Baxley, GA

Inspection Dates: September 20, 2021 to September 23, 2021

Inspectors: R. Patterson, Physical Security Inspector A. Richardson, Physical Security Inspector J. Tornow, Physical Security Inspector

Approved By: Jannette G. Worosilo, Chief Plant Support Branch Division Reactor Safety

Enclosure SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitori ng the licensees performance by conducting a security baseline inspection at Edw in I. Hatch Nuclear Plant Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commerci al nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

Type Issue Number Title Report Section Status URI 05000321,05000366/20Security URI 71130.05 Closed 19201-01

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were cond ucted in accordance with the appropriate portions of the inspection procedures (IPs) in effe ct at the beginning of the inspection. Samples were declared complete when the IP require ments most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and inter viewed personnel to assess licensee performance and compliance with Commission rules and r egulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspe ction-procedure/index.html.

The inspectors reviewed selected procedures and records, observ ed activities, and interviewed personnel to assess licensee performance and compliance with Co mmission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through com pletion of the following inspection elements:

Access Control (1 Sample)

(1) * Tier I: All Requirements

  • Tier II: 8 Requirements (02.06 a - d, 02.07 a, 02.08 a, b, e)
  • Tier III: 1 Requirement (02.09)

71130.05 - Protective Strategy Evaluation

The inspectors evaluated the licensee's protective strategy thr ough completion of the following procedure elements:

Protective Strategy Evaluation (2 Samples)

(1) * Tier I: All Requirements

  • Tier II: (02.05 a, 02.06 a, d, e, f, g, h, i, j, k, l, m, n, 0 2.07 a, b, c, e)

(2) * Tier III: (02.08, 02.09 a, b, 02.11 a)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through comp letion of the following procedure elements:

Review Security Plan Changes (IP Section 02.01) (1 Sample)

(1) Since the last NRC inspection of this program area, Securit y Plan Revision 18 HNP was implemented based on your determination, in accordance with 10 CFR

50.54(p)(2), that the changes resulted in no decrease in safegu ards effectiveness of the security plan, and that the revised security plan changed c ontinues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a rev iew of the security plan changes to evaluate for potential decrease in safeguards e ffectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submitt als listed below:

PP01: Protected Area Security Equipment Performance Index Sampl e (IP Section 02.17) (1 Sample)

(1)

Unit 1 (September, 2020 through August, 2021)

Unit 2 (September, 2020 through August, 2021)

INSPECTION RESULTS

URI Security URI 71130.05 URI 05000321,05000366/2019201-01 Description: A URI was identified for whether the licensee ade quately analyzed site-specific conditions that may affect the specific measures needed to desi gn and implement the sites physical protection program. NSIR completed their review of the analysis the licensee sent to close the URI. Based on NSIR's review of the licensee's analysi s the equipment in question can withstand the Design Base Threat (DBT) Waterborne Improvise d Explosive Device (WBIED). No findings or violations were identified.

Corrective Action Reference(s): Licensee furnished an analysis to NSIR showing the equipment in question could withstand the DBT WBIED. No additio nal corrective actions were needed.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On September 23, 2021, the inspectors presented the security b aseline inspection results to Mr. J. Weissinger and other members of the licensee staff.

4