Issue date | Title | Topic | |
---|---|---|---|
ML23341A204 | 12 January 2024 | Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) | Exemption Request |
ML23354A203 | 18 December 2023 | Document Request for Hatch Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-01 | Process Control Program |
ML23250A047 | 20 September 2023 | Request for Additional Information Regarding License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts in Technical Specifications Table 1.1-1, Modes | |
ML23264A014 | 14 September 2023 | NRR E-mail Capture - (External_Sender) Draft Round-2 RAI - Hatch, Units 1 and 2, Revise TS 1.1-1 Modes LAR | |
ML23198A155 | 17 July 2023 | NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 | |
ML23018A187 | 17 January 2023 | 2023 HNP CGD Inspection Information Request | Commercial Grade Dedication |
ML22355A208 | 21 December 2022 | NRR E-mail Capture - RAI - Hatch, Units 1 and 2, Reactor Pressure Vessel 'Rpv Head Studs' LAR | Incorporated by reference |
ML23026A237 | 16 November 2022 | 2023001 Hatch RP RFI Final | High Radiation Area Locked High Radiation Area Surveillance Frequency Control Program |
ML22208A133 | 26 July 2022 | NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-208 LAR | |
ML22157A354 | 6 June 2022 | NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-505 LAR | Probabilistic Risk Assessment Large early release frequency |
ML22140A119 | 20 May 2022 | NRR E-mail Capture - RAIs - Hatch, Units 1 and 2, TSTF-505 LAR | Tornado Missile Internal Flooding Probabilistic Risk Assessment FLEX Tornado-Generated Missile Large early release frequency |
ML22073A084 | 21 March 2022 | an NRC Fire Protection Team Inspection (NRC Inspection Report Nos. 05000321/2022011 and 05000366/2022011) and Request for Information | Safe Shutdown Exemption Request Fire Protection Program |
ML22025A214 | 21 January 2022 | Plant Hatch 2022001 RP Baseline Inspection Information Request | Process Control Program |
ML21265A340 | 22 September 2021 | NRR E-mail Capture - Request for Additional Information - Hatch, Unit 1, Emergency TS 3.7.2 LAR | Ultimate heat sink Internal Flooding Probabilistic Risk Assessment FLEX Containment Hardened Vent |
ML21111A303 | 21 April 2021 | NRR E-mail Capture - RAI - Hatch Unit 2 - One-Time Emergency RHR LAR (L-2020-LRO-0068) | Containment Hardened Vent |
ML21110A684 | 20 April 2021 | NRR E-mail Capture - RAI - Hatch Unit 2 - One-Time Emergency RHR LAR (L-2020-LRO-0068) | |
ML21013A411 | 13 January 2021 | Notification of Edwin I. Hatch Nuclear Plant Design Bases Assurance Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000321/2021010 and 05000366/2021010 | Commercial Grade Dedication Probabilistic Risk Assessment Functionality Assessment Coronavirus |
ML20293A075 | 14 October 2020 | NRR E-mail Capture - RAIs for SNC Fleet EP LAR (L-2020-LLA-0150 and L-2020-LLA-0151) | Minimum staff |
ML20253A273 | 9 September 2020 | Requalification Program Inspection Hatch Nuclear Station | |
ML20149K625 | 27 May 2020 | NRR E-mail Capture - RAIs for SNC Fleet Fire Protection Exemption Requests | Safe Shutdown Exemption Request Coronavirus Fire Protection Program |
NL-19-1532, Units 1 and 2 - Response to Requests for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures. Systems and Components for Nuclear Power Reactors | 18 December 2019 | Units 1 and 2 - Response to Requests for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures. Systems and Components for Nuclear Power Reactors | Probabilistic Risk Assessment Large early release frequency |
ML19336A014 | 1 December 2019 | NRR E-mail Capture - RAI: Hatch Emergency TS 3.7.1 Residual Heat Removal Service Water (RHRSW) System LAR | Probabilistic Risk Assessment |
ML19280A008 | 4 October 2019 | NRR E-mail Capture - Request for Additional Information (RAI) - Hatch TSTF-51 LAR (L-2019-LLA-0091) | Probabilistic Risk Assessment |
ML19224C055 | 12 August 2019 | NRR E-mail Capture - RAI - Edwin I. Hatch Nuclear Plant, LAR Regarding Degraded Voltage (L-2019-LLA-0108) | |
ML19220A036 | 8 August 2019 | NRR E-mail Capture - RAI - Edwin I. Hatch Nuclear Plant, LAR Regarding Adoption of NFPA 805, Request for Additional Information, EPID L-2018-LLA-0107 | Safe Shutdown Probabilistic Risk Assessment Large early release frequency Fire Protection Program |
ML19164A258 | 13 June 2019 | Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection | Probabilistic Risk Assessment Operator Manual Action Maintenance Rule Program |
ML19107A496 | 17 April 2019 | NRR E-mail Capture - Request for Additional Information - Hatch 1 & 2 Application to Adopt Title 10 of Code of Federal Regulations 50.69 RISK-INFORMED Categorization and Treatment of Structures, Systems and Components for Power Reactors | High winds Tornado Missile Internal Flooding Probabilistic Risk Assessment FLEX Large early release frequency |
ML19088A009 | 29 March 2019 | NRR E-mail Capture - Hatch 1 and 2 - LAR to Adopt NFPA 805 Fire Protection Standard, EPID L-2018-LLA-0107, Request for Additional Information | Safe Shutdown Fire Barrier Internal Flooding Probabilistic Risk Assessment Thermoset Large early release frequency Cable Tray Ignition Fire Protection Program |
ML19029B340 | 23 January 2019 | Southern Nuclear Operating Company, Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2 Draft Request for Additional Information for the License Amendment Requests to Adopt the Risk-Informed Provisions of Title 10 of the Code of Federal Regulat | Safe Shutdown High winds Fire Barrier Internal Flooding Probabilistic Risk Assessment FLEX Thermoset Large early release frequency Cable Tray Ignition Fire Protection Program |
ML19016A342 | 10 January 2019 | U2 ISI 2019001 RFI - Bcc | Non-Destructive Examination Nondestructive Examination Incorporated by reference Liquid penetrant |
ML18355A477 | 4 January 2019 | Request for Additional Information Revise TS 5.2.2.g and Update Emergency Plan Minimum On-Shift Staff Tables | |
ML18337A403 | 6 December 2018 | Request for Additional Information Revise Technical Specification 5.2.2.G and Updating Emergency Plan Minimum On-Shift Staff Tables | |
ML18085A013 | 8 March 2018 | Draft Request for Additional Information on Alternative RR-V-11, Proposed Extension to Main Steam Safety Relief Valve Testing Requirements | |
ML18058A081 | 27 February 2018 | Enclosurequest for Additional Information(Rai for Review of Southern Nuclear Operating Company'S Decommissioning Funding Plan Updates for Joseph M. Farley,Unit 1 and 2;Edwin I. Hatch,Units 1 and 2; and Vogtle Electric Generating Plant, Unit | Decommissioning Funding Plan Authorized possession limits |
ML17306A087 | 8 November 2017 | Request for Additional Information Regarding the Decommissioning Funding Status Reports (EPID L-LRO-2017-0008) | |
ML17284A354 | 7 November 2017 | Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools | |
ML17270A140 | 27 September 2017 | PIR Notification Letter 2017 | Probabilistic Risk Assessment Operator Manual Action Maintenance Rule Program |
ML17290A317 | 19 September 2017 | NRR E-mail Capture - Hatch 1 and 2 - Draft Request for Additional Information Request for Alternative No. HNP-ISI-ALT-05-05 | |
ML17111A579 | 26 April 2017 | Request for Additional Information, Fourth 10-Year ISI Interval Relief Requests | |
ML17110A211 | 24 April 2017 | Request for Additional Information | Large early release frequency |
ML16330A128 | 5 December 2016 | Request for Additional Information | Probabilistic Risk Assessment Coatings Large early release frequency |
ML16307A184 | 2 November 2016 | Request for Additional Information (Non-Proprietary) | Minimum Critical Power Ratio |
ML16271A169 | 17 October 2016 | Request for Additional Information | |
ML16222A295 | 29 August 2016 | Request for Additional Information | Offsite Dose Calculation Manual |
ML16205A001 | 22 July 2016 | Requalification Program Inspection - Plant Hatch | Job Performance Measure |
ML16195A400 | 13 July 2016 | Request for Additional Information License Amendment Request to Revise Technical Specifications Regarding TSTF-500 | Surveillance Frequency Control Program |
ML16194A428 | 12 July 2016 | E-mail Draft Request for Additional Information for Technical Clarification | Surveillance Frequency Control Program |
ML16187A122 | 1 July 2016 | Notification of Inspection and Request for Information | Ultimate heat sink Flow Induced Vibration |
ML16111B313 | 20 April 2016 | Notification of Inspection and Request for Information | High Radiation Area Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report |
ML16098A144 | 15 April 2016 | Request for Additional Information |