MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
3
o OPFRATING DAl'A REPORT N DOCKET NO. 50-200 m
o DATE July 5, 1979 x
Q COMPLETED BY WISCONSIN ELECTRIC POWER CO.
b TELEPHONE OPERATING STATUS
- 1. UNIT NAMEI POINT BEACH NUCLEAR PLANT UNIT 1 . NOTES .
- 2. REPORTING PFRIOD! JUNti 1979 . .
- 3. LICENSF D THFHMAL POWER (MWT)! 1516. . .
- 4. NAMFPLATE HATING (0kOSS MWEl! 523.6 . .
- 5. t)hSIGN FLECTRICAL HATING (NET MWE)! 497. . .
- n. MAX]Mut1 ()EPF ND At3LF CAPACITY (GROSS MWE)I bl9 . .
7 MAXIt'UM ()F PF N11^llLF CAPACITY (NET MWE) 493 . . . . . . . . . . . . . . . . . . . . . . . .
H. IF CHANGES OCrtlH IN CAPACITY RATINGS ( I TEMS NUMtihR 3 THROUGH 7) SINCE LAST RFPOHTe GIVE REASONS 1 NOT API't IC At$LE 9 POWLH tEVFt TO WHICH HFSTRICTED, IF ANY (NET Mwh)! NOT APPLICAHLF
- 10. R FA $ orts F OH HFST H ] CTI OriS e (IF ANY)! NOT APPL I C At1LE THIS MONTH YR TO DATE CtlMULATIVE
- 11. hot l4 % IN Ht-PORT ING PER IOl) "C 720 8+ p 3 8+ 3 76 e f$1b
- 12. NilMt !t H OF HOURS REACTOH WAS CRITICAL C1^) 720.0 4,175.84 ot4 , 0 63. 3 13 REArTOR RESFHVE SHUTl)OWN HOURS C') 0.0 2.7 4'62.3 18+ . HOllHS OFNFHATOR ON LINE y 720.U 4e161.1 62eU96.1 15 LINIT HFSERVE SHllTl)OWN HOURS U.0 2.7 St$6.1 16 GRO%N THFHMAL t- NF R G Y GENFHATED (MWH) Cy l e 067 e bH8+ 0 173,4863 67,b40eubb
- 17. Gross El.ICTH] rat. FNERGY GENhHATED (MWH) "g
- y. 3tbe720 2e111e240 29e530e930
- 18. F IE T F Lt- CTH ir AL FNF RGY GENhHATED (MWH) -- 350,092 2,019e000 2 H e 1 5t6 e 7 2 0 19 L IN I T 9FWVICF FACTOR h. 100.0 9b.6 01.9 20 UNIT AV A I L AtlIt.1 T Y FACTOR g 100.0 45.9 62.4 Z21. UNIT CAPACITY FACIOR (USING MDC NET) y 9 6 . 86 94.0 7 0 . 8+
11,2 . llNI T CAPACITY FACTOR (USING DER NFT) P 98.0 93.0 74.7 P3 UNIT FORCFD OllTAGF HATE U.0 0.0 2.0
- 24. SHilTllOWNS NCHFDill F D OVFH NEXT 6 MONTHS (TYPEe DATEe AND DtlRATION OF EACH)
I' Refueling maintenance shutdown scheduled for September 20, 1979, to last a1> proximately five weeks.
CN
'~
b25 SHUTl)OWN AT END OF REPORT PhHIOt)e ESTIMATED DATE OF SlAHTUP! NOT SHUTDOWN DATA RFPORTED AND F ACTOPS C ALCUL ATED AS REOUt_STED IN NRC LETTER DATFD SEPTEMBER 22, 1977
DOCKET NO. 50-266 UNIT NAME Pcint Beach Unit 1 DATE July 5, 1979 COMPLETED BY Wisconsin Electric Power Co.
TELEPIIONE AVERAGE DAILY UNIT POWER LEVEL MONTil June, 1979 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MUe NET DAY MWe NET 1 495 11 494 21 494 2 488 12 494 22 497 3 433 13 494 23 493 4 468 _
14 494 24 495 5 462 15 495 25 494 6 471 16 495 26 495 7 494 17 494 27 493 8 493 18 495 28 494 s- 9 494 19 490 29 493 ch 10 494 20 434 30 491 rG 31 ---
c.
U1 AD-28A (1-77)
UNIT S!!UTDONNS AND POWER REDUCTIONS DOCKET NO. 50-266 .
UNIT NAME Point Beach Unit 1 DATE July 5, 1979 REPORT MONTli June, 1979 OMPLETED BY Wis. Plec. Pwr. Co.
TELEPilONE m
W c i u tn o u on n oav En C H a to c -d O oO Go o au o co v ca v 'a ao No. Date Q4 mP m oeo Licensee Event mo o 'o .
Cause and Corrective Action N $0 O"
O'.
d .S "
O U) c Report No. NU O'O o
To Prevent Recurrence E 3 U O
Q s
x a
J
^ 1 3 4 F: Forced Reason: Method: Exhibit G-Instruc-
~"
S: Scheduled A- Equipment Failure (explain) l- Manual tions for Prepar-B- Maintenance or Test 2- Manual Scram ation of Data Entry C- Refueling 3- Automatic Scram Sheets for LER Fi,le D- Regulatory Restriction 4- Other (explain) (NUttEG-0161)
E- Operator Training & License Exam F- Administrative 5 Exhibit I- Same AD-28B G- Operational Error (explain) Source (01-78) 11- Othur (explain)
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No. 50-266 Unit Name Point Beach Unit 1 Date July 5, 1979 Completed By Wisconsin Electric Power Company Unit 1 was base loaded for approximately 90% of the period with three load reductions. Power Supply requested that load be reduced to an average of 460 MWe for 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br /> starting June 4, 1979. This load reduction was necessary for system stability while maintenance was being performed on a switchyard circuit breaker.
Load was reduced to an average of 300 MWe for an average duration of eight hours on two occasions to permit locating and plugging leaking condenser tubes.
Anchor bolt testing in accordance with IE Bulletin No.
79-02 is progressing. No general conclusions have been reached.
Unit 1 will be shut down as early as practical to accomplish the feedwater nozzle examination in accordance with IE Bulletin No. 79-13. Shutdown of this unit is dependent upon the results of the examination of the Unit 2 feedwater nozzles, completion of any repairs to Unit 2, and Power Supply requirements. If time permits, steam generator tubes may be inspected in an attempt to locate and plug the source of an approximate 12 gsllon per day primary-to-secondary leak.
A review of plant safeguards actuation circuitry dis-closed deficiencies requiring corrective modifications.
The deficiencies are in the areas of single component failure, manual actuation, and bypass indication criteria and involve engineered safeguards systems actuation circuitry. These deficiencies are minor in nature and are related to reset circuitry design deemed acceptable during plant construction in each case. Modifications to correct the deficiencies.
will be performed as soon as practicable.
Further details of this item are discussed in Licensee Event Report No. 79-010/0lT-0.
No other major safety related maintenance was performed during the period.
k N
I OPERATINO DATA RFPORT DOCKET NO. 50-301 DATE July 5, 1979 COMPLETED t3Y WISCONSIN ELECTHIC POWER CO.
TELEPPONE OPERATING STATUS
- 1. UNIT NAMEt POINT BEACH NUCLEAR PLANT UNIT 2 . NOTES .
- 2. REPORTING PERIODI JUNE 1979 . .
- 3. LICENSED THERMAL POWEH (MWl)! 1516. . .
- 4. NAMFPLATE HATING (GROSS MWE)1 523.6 . .
5 DFSIGN ELECTRICAL RATING (NET MWE)! 497. . .
- 6. MAXIMUM ()F Pt- Nt) AHL E C APAC Il Y (GROSS MWE)I bl9 . .
3 7. MAVIMilM DEPFNDAtiLE CAPACITY (NET MWE)! 495. . . . . . . . . . . . . . . . . . . . . . . . .
& H. IF CHANGFS OCCUH IN CAPACITY HATINGS (ITEMS NUMMEH 3 THROUGH 7) SINCE LAST REPORTe GIVF Rt- ASONSI flOT APPLICAHLF 4 POWFH LFVEL TO WHICH RESTHICTF(Je IF ANY ("ET MWt- ) ! NOT APPLICAtiLE
- 10. REASoris FOR HFSTRICTIONSe (IF ANY)! NOT APPLICAtiLE rJ O THIS MONTH YR TO DATE CUMULATIVE CO
- 11. H6' IH S IN HFPOHTING PERIOD 720 4e343 00e600
- 12. NU'1ht H G r- HOURS HFACTOR WAS CRITICAL 694.0 3e659.3 b4e946.4 13 REArTOH HFSERVF SHUT [) owr t HOUHS H.0 H.6 15d.4 14 HOllHS GFNtHATOR ON LINE 090./ 3eM03.2 boe796.0 15 UNII HFSERVF SHt ITI)OWN hot >RS 0.0 15.4 103.2 "CJ 16. Gros'i THE RMAL FNERGY GENT- H AT t- D (MWH) leo 21ebbU be552e50tl 71e637e717 C )17. GHow FL ECTRICAL ENFRGY GENT- R AT ED (MWH) 352eb00 le905e7/U 24 e 3Nu e tiHO C )18. NFT'FLFCTHICAL FNFRGY Gt NEH ATED (MWH) 336elob leH19e272 23elH6e949 l1019 UNII SFHVICE FACTOR 9/.0 67.6 U h . t1
- 20. IfNIT AVAIL AllILITY FACTOR 97.0 M7.9 6t).9
[j 21. L IN Il CAPACIlY FACTOR (8 MING MDC NET) 94.3 M4.6 70.1 7.d P . IJN I T CAPACITY FACTOS (USING DER NET) 93.9 64.3 77.0
"**7~* 2 3 . t JNI T FOHrED OllTAGF HATF 0.0 0.0 1.6 h.d 24 SHull) OWNS SCHFDut ED OVEH NEXl O MONTHS (TYPEe DATEe AND DURATION OF EACH)!
2f, MONF 3==
y2 5 IF SHtlTDOWN AT END OF REPORT PERIODe ESTIMATED DATE OF STARTUP! Jt JL Y 14e 1979 DATA REPORTFD AND FACTORS CALCULATED AS REQlJESTED IN NRC LETTEH DATED SEPTEMBER 22e 1977
DOCKET NG. 50-301 UNIT NAME Point Beach Unit 2 DATE July 5, 1979 COMPLETED BY Wisconsin Electrie Power Co TELEPIIONE AVERAGE DAILY UNIT POWER LEVEL MONTII June, 1979 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY F1We NET DAY MWe NET 1 496 11 462 21 496 2 497 12 491 22 499 3 496 13 496 23 486 4 497 14 495 24 419 5 496 15 496 25 499 6 496 16 496 26 440
,, 7 496 17 477 27 400 8 496 18 473 28 494 9 496 19 4 9 t, 29 483 N
} 10 450 20 496 30 2 so 31 ---
AD-28A (1-77)
UNIT SliUTDOWNS AND POWER REDUCTIONS DOCKET 110. 50-301 UNIT NAME Point Beach Unit 2 DATE Ju lv 'i , 1979 REPORT MONTli June, 1979 COMPLETED BY wis, Elec. Pwr. Co.
TELEPHONE m
- a. ~ u. B a o
.S 2 au"co 5t ooe h
vo so co No. Date n. cg m jgg Licensee Event gg gg Cause and Corrective Action N :3 :z:
o-o cc v .c o to p Report No. cc eo o
To Prevent Recurrence
- C .s u o
a 4 790630 S 21.3 B 1 N/A N/A N/A Unit taken off line for feedwater nozzle volumetric examinations in accordance with IE Bulletin 79-13.
l 3 4 F: Forced Reason: Method: Exhibit G-Instruc-S: Scheduled A- Equipment Failure (explain) l- Manual tions for Prepar-
^
B- Maintenance or Test 2- Manual Scram ation of Data Entry
,_ C- Refueling 3- Automatic Scram Sheets for LER File U D- Regulatory Restriction
' 4- Other (explain) (NUREG-0161)
E- Operator Training & License Exam F- Administrative 5 AD-28B Exhibit I- Same
. , , G- Operational Error (explain) Source (01-78) U 11- Other (explain)
NARRATIVE SU:01ARY OF OPERATING EXPERIENCE Docket No. 50-301 Unit Name Point Beach Unit 2 Date July 5, 1979 Completed By Wisconsin Electric Power Company Unit 2 was base loaded for approximately 90% of the period with 11 load reductions and one shutdown. Power Supply requested on 10 occasions that load be reduced to an average of 375 MWe for an average duration of four hours.
Load was reduced to 70 MWe for seven hours on June 27, 1979, to investigate a problem with temperature control of the reactor coolant drain tank. The source of hot water causing the heating problem was packing leakage of a residual heat removal isolation valve. Repair will be completed during the Unit 2 shutdown.
Shutdown to accompli-h feedwater nozzle volumetric examinations in accordance with IE Bulletin No. 79-13 was started on June 29, 1979. The unit was taken off line at 2:40 a.m., June 30, 1979. Required repairs will be accomp.lished prior to putting the unit back on line. Other minor maintenance will also be conducted during this shutdown.
No other major safety related maintenance was performed during the period.