Responds to NRC Ltr of 781128 Re Violation Noted in IE Insp Rept 50-364/78-17.Corrective Actions:Electrical Penetration Assemblies Cleaned & Personnel Instructed to Keep Assemblies Closed Except When Required
ML19256A987
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/18/1978
From: Barton A
ALABAMA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19256A982 List:
References
NUDOCS 7901170363
Download: ML19256A987 (2)


Text

.

.- _ ' ( .. . v.a y , . . , ,. . s. . .

., V - C P :c h a ?ss t f< . , . . q c A nt. c . y,;".e ,,

n v icnst,su-L k f.'"l??"m. ,,

,, AlabamaPower ta r. ..

December 18, 1978 Joseph M. Farley Nuclear Plant - Unit 2 NRC Inspection of October 24-27, 1978 File: A-35.10 Log: 78-247 Mr. James P. O'Reilly U. S. Nuclear Regulatory Commission 230 Peachtree Street NV - Suite 1217 Atlanta, Georgia 30303 Re: RII:BRC 50-364/78-17

Dear Mr. O'Reilly:

The inspection report transmitted by Mr. Murphy's letter of November 28, 1978, has been reviewed by all concerned parties and we do not consider any of the inforr.ation contained therein to be proprietary.

We have taken the following action in response to the items noted in the inspection report:

4. Independent Inspection (Details II)

Infraction 364/78-17-02 Improper Storage of Electrical Penetration Assemblies (EPA)

(1) All electrical penetration assemblies have been cleaned. After cleaning, if work in progress did not require access to the internals, each penetra-tion assembly was closed.

(2) Field personnel have been instructed to keep pene-tration assemblies closed except when work requires access to the internals.

(3) Full compliance has been achieved as of December 15, 1978.

t t

79011703G3

. NRC Inspection of October 24-27, 1978

. December 18, 1978 Page 2

5. Instrumentation (Components and systems I) Observation of Work and Work Activities (Details II)

Infraction 364/78-17-01 Failure to Follow Procedure For Instrument Installation (1) The subject instruments have been reworked to comply with the requirements of the erection traveler.

(2) Piping Superintendents have been directed to be more attentive to the quality of craft workmanship.

Instrument installation inspectors have been reinstructed regarding their responsibility to verify compliance with procedures, drawings and specifications. Also, a drawing reading review has been conducted with emphasis on charac-teristics, symbols and notes.

(3) Full compliance has been achieved as of December 15, 1978.

Very truly yours, d

Alan R. Barton ARE:CBBh cc: Mr. M. D. Hunt Mr. B. R. Crowley k