Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
. .
. ' O. O O 3 3OOO7 a .
. Z aJ e . . . . . . . .
U c > - C n' GO naND2 N
= W H wiO9BC .~ C r0 0 5 W X < r- DA: DC : ~D J . < s s s ~ u .
'i- . J NW 7 * ^J ?
O . .: 6 D D N 3 H k a, :_ d -4 D
. . > D . .
- t. ) H U CCO
~4 .
Q' N r- . . . O U i- d J O
N
.I
.
a
.-.4 w . . . . . . '. C. . .
A e . r- s- DeO DO 00
- bN O .. O Z a < - rw - 5. 7O077 a r~ C O . s < Q 23 3 DD>A -4 1. D h U J = . . <. ., = U I
- s O '
W . ~ O .-4 -s e-< U) 3 -:
J O N H E F O e4 f.C & &
N [ E
l Z 2
- k D Lo O ~ e .H , p.- N Z D N >- Un _i -
C
^'
~
. j ,- - s O ..
O y Q O - a N U H & 4 Z ec w I H H D Q E H & . - I J -
F- al i O . O ~O. :D 2 's W .
aj J J . . 7, a I . . . . . . . . . J ;
Y LJ G. a) O < H NNONOOOA - NNO .-
U H E r- .W
- E bb b s N 9 0 0 7 C' W r O O W I 5- O is O O 1 D 3 .-4 H m; '.
Q O U .H e r n F * *
. . . . . . . . a .. ; I . .
as ~c F. H >- -
'D -* < '
E
_ -. O a M ca
. D yH a
}
-4 .Z H
_1 m _
^
o-- DDD 21 a it_. < V-M 7 '- < >- E . .a
. 3 uj - -
H D N .. r F- - r ;
}~ r- e >- - s ~
w c 2 W *. - 2 I tn .; _
H JJ R~ < =- I a Z . . :_ l v, J ~ZI ~- H =
< t9. MO t.. '
I r-HH a
_ O J s N- J# L.. - + - ,. . ,2 y -_, ;
H al DD_ W e-4 >- H EO- _ Z_ *i H
. O e4 7' OF' = - - a O mS E :r u ' Q< H i- O U1 O C. 1 7 0ZJ W Q< Q uJ c ,
uJ JH ....F--- r- - Lt U1 1 F- Zo F-a J ~~u- F UH D r- < X -
U > H uJ ~ >- >- V H - W W < . l . CO - :_.
J Di MB-HHH .- : I C ? .
ZZ Z H _<yE HH ;> w . OE i en . H H c. _J
<" D- 0UU- O Z W J) TWW T w Q Ir .. Z - - a 2 - H . c_'I __, > L. CDD< *' - 2 U U I L' W Hfl n < (c a c OO CO F-- - H >
0 < J ul O F <: U H aJ H Q H .' ' >- U - O .t O Z hl LL 3C<UU IW L U F- J M > C - U it C/ C H O O C' Z hj u v <D e-
- D O O Z a 6. kOO a e w a: HJHH OJJIZQ O O
< H . O. - JJJ CI. T W C F- - ZH FUi/CJ r- r- vs ..
t --
U 1 Z Q J O < 0 I t <t E F H DZJ_ U r- '
< D hj ul HO<ZU<<DU 'M HW -
I .: < < skL.H L 1 O H E H e-a O Q m; H G uf t >OA U ]L J D b! H O C.tIHIZZUJH, OD F JH < H >- >- OI <
W Wu < H a. >s O L. LO < < a U a. THH U ~:
D E I Cr U C. Q. R _1 r_ WIO >FH a-4 V . HHQL> id Z r- .. H uj LJ W < C' .r L.; .
U 2. H JVUm 3 4 hJ G c J Q Q a) > L L Z- , _ . F- > -*- < UWO O C.
H E Z Q H 'd ' ' " CH, ZO W W I J U 2' ' tCO ZZ Q W <Hi < .
Z O J in H c 0 u) HW uJ > < < O E H -
2HWJZDD<Z Z tO Z JW<UUkO D C 1 Z C. C : ^^ I &O D aJ H W >
O I C Z HOWWH H HU h) W rr C U Z H W W - H H H F- r- H W L M -4O_ U F W X X E< D I' < D H OOHH HH HH D 1; H Z b) H < kJ < < t O u) O D a; O Z .T t af Z Z -' Z Z I L C:
< DI JZQFF.H CE IZT'IDCCZDDDDDW e-*
& ~
W . . . . . . . . . . . . . . . . . . . . . . . . . H C. M N O 3 D'O 6 0 70 - N 9 3 D O F (0 1 C .* -. C3 D <
O e4 M* .-* ., a e4 -4 e4 m N N N N N N O 790314o37f ..
OPERATIrlG DAT' PEPO T
- DOCxET NO. 50-301 DATE March 2, 1979 COMPLETED BY WISCOrdblN ELECTRIC POWER CO.
TELtPHONE OPERATING STATUS
- 1. UNIT IIAME: POINT BEACH tJUCLEAR PL M !T UNIT 2 . !OTES .
- 2. REPORTING PERIOD: FEBRUARY 1979 . .
- 3. LICENSED THERMAL POWER (MWT): 1518. . .
- 4. NAMEPLATE RATIflG (GROSS IML): 523.8 . .
- 5. DESIGN ELECTRICAL HATING (i :E T Me ): 497. . .
- 6. MAXIMU'* DEPF NOAHLE C ADICITY (GROSS MhE): bl9. . .
- 7. MAXIMU:' DEPENDABLE CAP? CITY (NET "WE): 495. . . . + - . . . . . . , , . . . . . . . . . .
- 8. IF CHANGES OCCUR III CAP WITY RATINGS (ITEMb t .U' iB E R 3 THh0VGH 7) Sli1CE LAST H-POETe GIVE i' t ASO: ' <
- 9. POWER LEVEL TO nHICH PESTPIClEDe IF ANY (i 'ET MM. ) : ' :O T AP"LICABLE
- 10. REASONS FC7 i'EST F ICT ION 5 e (IF AtlY): ' :O T APPLICAHLE THIS MONTH YR TO DATE CUWL AT IVE
- 11. HOURS IN REPOx TIl fG PEriIOD 672 le410 b7ec/0
- 12. IlUMBER OF HDUPS dEACTOF WAS CRITICAL o72.0 le410.0 5 2 r 5 0': . 1
- 13. REACTOR 1E5r V, SHUTDOWN HDURL 0 . '; 0.0 149.0 14 HOURS GEN!RATOL i il L!' E 672.0 1,43e.U 517410.6 lb. UNIT' RES' R'/L $HUTDOM1 HOURb 0.u 0.. 67.E
- 16. GROSS THERMAL FN_PGY G: J r: A T: D (!AWH) laPldr.47 2r126eb24 06e41'r791
- 17. GRO5~ ELt CTRICAL EN-FGY T tl AT'TD (MnH)
. 343r1b0 723rc70 23,198,480
- 18. NET EL;:CTRICAL HJi'GGY GD ; .h AT! D (MWH) 323,6::5 092e769 2.'rooJe400
- 19. UNIT SERVICE FACTOR 10s.1 10 . 89.1
- 20. UNIT AV"41LABIL:TY FACFOR 10 - . 10 ' . 89.5
- 21. UNIT CAPACITY FACTOR (USING MDC l JET) 96.o VS., 7e.2 2?. UNIT CAP,", CITY FACTOR (USING DER r 1.T ) 98.4 98 4 77.0
- 23. UNIT FORCED OUTAGE R .' T L 0.o U.. 1.o
- 24. SHUTDOWNS : CHE DUL'. s OV;.R N ..X T 6 MD'1THd (TYPE, DAl r MiD uuRATIOtj .F EACH):
Refueling maintenance shutdown scheduled for March 23, 1979, to last approximately three and one-half weeks.
- 25. IF SHUTDOWN AT Eliv GF REPO:<T Pt.'InDe ESTIMA~LD _ i; OF STAP;Up: r10 r LHm Dom t DAT? PEPOrtTED MO F ACTOH3 C AL jut iiED '5 Wi.GV._5T: D Ifl
- R C LET R DAlED SEPi.MB-R 2.f r 1977
o Hl bco y co to Ha O
in w
. . M.
rt O
U3 N OO D' N (D O
- o. m 1 C o. Type H
(D Duration (Hours)
M i
??7M?? tty Reason m '
O O > 0 00 W % M to .
E3 $'3 t$ $ * $ 0 (D M P M C C D e "
Method Of @
N A D W H (D rt *O - Shuttin9 3 m H
e rtPetm He B Down Reactor O
- P in O tt P D C g V) mOctMODDD e :I:
XDM
'O 2 W 6-3 N N tQ D ct O
e c P- 3 8 H H tt M (D % O O O A P W :D W Z ld (D Z O P- M < P- (D D N (D D in O P.
MH O
Z oD "O rn a
x Z
w H P et C M Oo 03 O DM 8N N (D M LQ P-0 (D (D tt N
to M !2:
- e et (t - Z< (D 0 (D P- (D OO O' M MO X . D M m
> a N M M P- D P. < x D g D -
Systeg M
Code H Y
0 X C
Compongnt d y Code @
en AWMHZ g i e io et O O > 3 % D' D tt C N @ O AC D" rt D D A. O (n CD O C C ** (D H92P M WHH HW O
- rt OD >-3 O (D P- (n < Q. M3 O MOO (D MN CO "O N DO MM ZO H Cn p rt O tM H >:
WGB M lI: >-3 8M PN lc M OM H DA (D (D ZOOZ w5 OO M > Z C et t2 8 O U1 A N P- H: M +
M<
to M - in A ft M (D G E3tW Ox Z D et P X D e- 2 O o C C 0 P O D' O> W M H' I NPD'. N (D O D P- GO
- O U N O O' M tt D (n O' ry 3' rt m (D P- O in P P. M O tt i O m rt O
- N W ommO D 0 ' O H HO MO O W l ch N O I
- O P4 WMH @ U' U3 %., p rt N D N 4 A td W (D to E
( A 0D 1-2 N 78 o 8B
)
D SF a t
e SF co hr ec de H ud ego l
e d -
Qoga4oCe
~
HGFEDCBAR DogoC N
- - - - - - e a
OOAORRMEs tp dp e e a q o h e m e g fiu n
- Oojm oW E U
- R N e r ir u u n i: U 3rju4at e E I ranaletp . n o t
P T titalem Oo5c y aUaokr O
( isctine R S eotronan T H xnr rgnt L U paaTy c N i M T lltr eF O c O D a iaR a N Re N O iE v ie oi E en T W nrens rl ps H N
) r it u oe S o nr Tr re r gi ee t A c s E F N
( &t t( Nv e D e i e oe b x Lo x .n r P p in p t u O l c l a W a e a r E i n i v R n s n ucE ,
) e )
mymc v 1 R
E E 9 D x 7 U a 9 C m T I
Ooeyacc4 o o o O 3 N S
432lM
- e t C OAMMh a tuaao Tu htnnd os eouu: e rmaa all P
ra C
( t en TO eiS vd EM D xcc p
e LP UO r nC EL NC lSa to PE IK acm ir Rr r HT OE TE T
na ee NDDN
) m cc E AAN ut 5 4 ri B YEE T M O.
rv WMP5 SE ( Sate ee a o ox Nhtix n i s r i 0
uh U e io h cA c n ri Reoni ec .
h t 0 3
cb Etnsb t E 1 ei Gs i i t - oft o l e
2 B e
0ffo n c a
I 1o rG c
- 6rD -
. 1 9 h 1 API P 7 S ) Ltrn w 9 U a Eaes r n m R pt i
e Ear t
Fnru .'
it c C ,.
o 2 lr -
ey .
DOCKET NO. 50-266 ,
UNIT NAME Point Beach Unit 1 DATE March 2, 1979 COMPLETED BY Wisconsin Electric Power Co.
TELEPHONE AVERAGE DAILY UNIT POWER LEVEL MONTH February, 1979 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 405 11 491 _
21 493 2 488 12 485 22 492 3 488 13 488 23 494 4 475 14 484 24 492 5 488 15 486 25 490 6 486 16 484 26 489 7 487 17 482 27 493 8 471 18 487 28 494 9 486 19 489 29 ---
10 484 20 489 30 ---
3x ---
AD-28A (1-77)
DOCKET NO. 50-301 ,
UNIT NAME Point Beach Unit 2 DATE March 2, 1979 COMPLETED BY Wisconsin Electric Power Co.
TELEPHONE AVERAGE DAILY UNIT POWER LEVEL MONTH February, 1979 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 473 11 492 21 495 2 492 12 484 22 494 3 495 13 487 23 496 4 489 14 490 24 490 5 492 15 491 25 488 6 492 16 486 26 485 7 489 17 489 27 488 8 480 18 432 28 487 9 487 19 496 29 ---
10 483 20 493 30 ---
31 ---
AD-28A (1-77)
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No. 50-266 Unit Name Point Beach Unit 1 Date March 2, 1979 Completed By Wisconsin Electric Power Company Unit 1 was base loaded nearly 100% of the period with only four load reductions.
Freezing of the circulating water intake crib necessitated seven and one-half hours of reduced power operation for Unit 1 on February 1, 1979. After indications of freezing problems became evident, Unit 1 load was reduced to 470 MWe at 6:35 a.m., then to 250 MWe at 7:45 a.m., and finally it became necessary to reduce Unit 1 load to 165 MWe for about five and one-half hours. About noon the freezing problems were overcome and return to full power commenced at 12:45 p.m.
Full power was achieved about 2:00 p.m., February 1, 1979.
Load was reduced to 340 MWe for two and one-half hours on February 4, 1979, to conduct turbine stop valve tests.
Load was reduced about 5-10 MWe on two occasions totalling about 38 hours4.398148e-4 days <br />0.0106 hours <br />6.283069e-5 weeks <br />1.4459e-5 months <br /> to keep the discharge temperature from exceeding an 890F environmental limit applicable under normal operating conditions.
Primary-to-secondary leakage in the "A" steam generator gradually declined from 56 to 30 gallons per day over the period.
A 14-day reportable occurrence (Licensee Event Report No. 79-001/0lT-0) took place when radioactive gas was released while the K10B cryogenic system gas compressor was being returned to service at 6:19 p.m., February 19, 1979. As the compressor discharge valve was opened, the operator heard gas escaping through a vent valve inadvertently left open.
He immediately closed the vent valve, isolating the release.
The release was properly monitored, and the release rate was a little less than 3% of the permitted annual average release rate of 0.2 Curies per second. The total release was about 1 Curie.
No major safety-related maintenance was performed during the period.
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No. 50-301 Unit Name Point Beach Unit 2 Date March 2, 1979 Completed By Wisconsin Electric Power Company Unit 2 was base loaded nearly 100% of the period with only two load reductions. Maximum available output of the unit has declined about 2% since commencing core stretch operation on February 19, 1979.
Freezing of the circulating water intake crib made it necessary to reduce Unit 2 load to 450 MWe for six and one-half hours on February 1, 1979.
Load was reduced to 405 MWe for 20 minutes to conduct turbine stop valve tests on February 18, 1979.
Unit 2 generated its 23 billionth kilowatt hour of electricity on February 12, 1979.
The Unit 2 refueling outage has been rescheduled to begin at midnight on March 22, 1979. The outage was originally scheduled to begin exactly two weeks earlier, but the severe winter conditions and the resulting load demands suggested that postponing refueling would be a prudent course of action.
All 36 new fuel assemblies have been received, unloaded, inspected, and placed in the spent fuel pit in preparation for the upcoming refueling.
A 14-day report (Licensee Event Report No. 79-001/0lT-0) was filed after a staff re-review on February 19, 1979, determined that the failure of both main steam isolation valves to close at hot shutdown conditions on December 9, 1978, was properly reportable rather than simply a significant operating event as originally determined. Although the Technical Specification requirements call for the valves to close in five seconds during the annual refueling test, it was felt following discussions with the chief site NRC inspector that failure to demonstrate closure of these valves under the specific conditions of the above shutdown was in fact reportable.
A 30-day reportable event (Licensee Event Report No.
79-002/03L-0) occurred on February 27, 1979, when a Unit 2 reactor trip relay ( 2-P.T 3 ) in the "A" train experienced a delay in dropping out. The relay was replaced. The defective relay was a Westinghouse Cat. No. BFD31 with a thermally deteriorated nylon sleeve. It is planned to replace all relays of this type associated with the Unit 2 reactor trip system as soon as practicable. The corresponding Unit 1 relays have already been replaced.
No other major safety-related maintenance was performed during the period.