Forwards Rept on Crystal River 3 & Possible Effects of Delays Due to Suspension of Const During NEPA Review, in Response to Rs Boyd 711103 Request for Comments Re Util Statement on CP Suspension
ML19309A008
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/03/1972
From: Phillips T
FEDERAL POWER COMMISSION
To: Boyd R
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19309A009 List:
References
PWR-ER, NUDOCS 8003240845
Download: ML19309A008 (2)


Text

'

rpou OAvE or oocuurNT- DATE RECavtD Federal Feuer Cowmaissiem NO Washington, D.C. 30636 Feb. 3, 1W2 F# 3, 1972 -

a. '

T.A. PI f'lliph , , , , , , .

o,,,,

s o-g one cc: osNnn Mr. Roger S. Boyd 1 signed 6 1 cc actio= =rcessaar O co~cuaacace O oarc ^~s-ca to-ca.AS SIF:

Po$r OFFICE =O actio= =rcessant O co==r~T O  :

F ALE cor3 E; o

U arc. No. 50-302 (ENT130 FILE)

LU5"'rEo " @ ll*- N I'N r... furnishing "*""' ' ^ "'"' "'"

[

corarents on "SIENT CAUSE" Statement Schwencer Z-5-ti S*

for Crystal River Unit 3 & trans: -

w/2 cys for EM Q

l 15TRIBtrf10N T

ECRe"pbreontheCrystalRiverUnitI %I IAA* UI

& the Possible Effects of Delsys Due AEC M To Suspension of Coast During NEPA # ~I"~I' #*

Review...... M '""8 Boyd (1 cy enci rec'd) Morris /Schromier/T R. Wilson at=4ans: /E*PPler 1 k8 I/

1 CY LOCAL FDR CRYSTAL RIVER, FLA.

HOLDING 16 CYS FOR ACES WIE MLL ULu DER

!_ 3 EE.

U.S. ATOMIC ENERGY COMMISSION A U.S. GOV E RNMEN T PRIN TIN G O F F4C E 897 8-424-062 M All CONTROL FORM roa= accames O'

3 cEE R

(;_) m

~

L_.) @B g.~

A (c=0

FEDERAL POWER COMMISSION WASHINGTON, D.C. 20426 February 3, 1972

'~

PWR-ER

--v File Op Mr. Roger S. Boyd Assistant Director .

for Boiling Water Reactors 3 '

A .c j Division of Reactor Licensing 6 ,y U. S. Atomic Energy Commission  %'S %, ,j.$ ^p g Washington, D. C. 20545 to '

/

Dear Mr. Boyd:

~~

This is in response to your letter of November 3, 1971, requesting the comments of the Federal Power Commission on the statement filed by the Florida Power Corporation regarding whether the construction permit for Crystal River Unit No. 3 should be suspended, in whole or in part, pending completion of the required on-going NEPA review.

The enclosed staff report prepared by the Commission's Bureau of Power evaluates the effect of delay in facility construction upon the power needs to be served by the facility; the availability of replacement power from others, if any, and the costs of such replacement power.

The report illustrates the need for the Crystal River Unit No. 3 to provide an additional 825 megawatts of capacity for meeting loads in the 1973-74 winter and the 1974 summer peak load periods on the Applicant's system and the Florida Group of the Southeastern Electric Reliability Council (SERC).

Very truly yours, l

A. Phil ips Chief, Bureau of Power l Enclosure Staff Report on the Crystal  ; .

River Unit No. 3 p 4 l