ML19308D972

From kanterella
Jump to navigation Jump to search
Summarizes 730201 Meeting W/Nrc & Doi in Washington DC Re Potentially Serious Environ Problems at facility.730430 Meeting W/Util Planned to Improve & Strengthen Util Study Outline
ML19308D972
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/05/1973
From: Dircks W
COUNCIL ON ENVIRONMENTAL QUALITY
To: Gardner G, Muller D
INTERIOR, DEPT. OF, US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8003200714
Download: ML19308D972 (3)


Text

_- . . . . . ~. . ... . -

' AEC DNIBUTION FOR PART 50 DOCxzT Mr%IAL (TEMPORARY FORM) .

CONTROL NC; 988 .

ENVIRO FROM: DATE OF DOC: DATE REC'D LTR MEMO RPr CrniER

. Executive Office of'the President Council on Environmental Quality 2-5-73 2-8-73 .; x W6 f'flMA h Birks 20006

'Io: ORIG CC crafER Ssur AEC Ea X D. R. Muller SENT LOCAL PDR X

- i CIASS: , QMPROP I5F0 INPUT NO CYS REC'D , DOCKET EO 1 , 50-302 - ,

DESCRIPIION: ENCLOSURES: -

Memo summarizing the major points discussed at the meeting w/CEQ on 2-1-73 ......

DIST: Per.D. Muller /Harless PLANT NAMES: C,rystal River Unit # 3 ,

FOR ACTION /INFORMATION 2-9-73

, toe BUTLER (L) s -SCHWENCER(L) SCHEMEL(L) KNIGBTON(E)

W/ Copies W/1 Co W/ Copies W/ Copies CLARK (L) STOLZ(pies L) ZIEMANN(L) YOUNGBID0D(E)'

W/ Copies W/ Copies W/ Copies W/ Copies ,-

GOLLER(L) VASSALID(L)' CHITWOOD(FM) REGAN(E)~ j i l W/ Copies W/ Copies W/- ies W/ 4 Copies

~ KNIEL(L) H. DENION .DICKERE)

W/ Copies W/ Copies W/ Copies W/ Cq11es INTERHAL DISTRIBUTION

[xw peux run FILE 3 TECH REVIEW VOLIMER .e. HARLESS 6 E uuwRIE DENTON SHAFER F&M OGC, ROOM P-506A SCHROEDER GRIMES F&M BROWN E 4 MUNTZING/ STAFF MACCARY GAMMILL EMEIEY 4.-G. WILLIAMS E CASE KASTNER KNIGHT (2) NUSSBAUMER E. GOULBOURNE L GIAMBUSSO PAWLICKI BALLARD A IND BOYD-L(BWR) SHAO SPANGLER LIC ASST.

A EYOUNG-L(PWR) KNUTH SERVICE L SALTZPAN SKOVHDLT-L STELIO ENVIRO MASON L P. COLLIIE MOORE MULLER WILSON L PLANS HOUSTON DICKER MAIGRET L FfCI551TALD REG OPR TEDESCO KNIGEON SMITH L DUBE yFILE& REGION (2) IDNG YOUNGBIDOD GEARIN L

) ORRIS LAINAS PROJ 1EADER DIGGS L INFO STEELE y BENAROYA TEES L CTELES REGAN LE L w

EXTERNAL DISTRIBUTION

  • -l-IDCAL PDR, Crystal River, Fla 1-UfIE(ABEMATHY l-NSIC(BUCHANAN)) *- (1)M-NATIONAL LAB'S PNWL 1-R. CARROLL-0C, GT-B227 1-FDR-SAN /LA/N' 1-GERALD LELIf

. l.ASLB-YORE /SAYRE el-R. CATLIN, E-256-GT BROOKHAVEN WOODWARD [H.ST. 1-CONSULANr'S 1-AGMED(WALT 16-CYS ACRS HOLDING NEWMARK/BLUME/AGABIAN Em C 427i 1-ED...MUIm , , , ,

I 8 0 0 3 2 0 0 7 /</

g .-

, -:W u e .'

E'

UTIVE OFFICE oF THE PRESIDEF') 50-302

~

CuUNCll. ON ENVIRONMENTAL QUALITY ..

~

722 JACKSON PLACE. N. W. d 's

--WASHINGTON. D. C. 20006 e

February 5,1973 H[- 1

$ N8g  :

hh MEMORANDUM FOR MR. GEORGE GARDNER

. Department of the Interior 7l I MR. DANIEL MULLER U.S. Atomic Energy Commission l l

SUBJECT:

Crystal River Nuclear Plant This is a brief memorandum to summarize the major points discussed at the meeting-here at CEQ on Thursday, February 1, 1973 on the subject of the Crystal River Plant.

The representativesof the Department of the Interior outlined  !

a number of potentially serious environmental problems that I they felt could occur if the Crystal River Nuclear Unit #3 l were permitted to operate as proposed by the ut:ility. These problems centered principally around: l l

1 The effect of the long cooling water intake canal on movement of aquatic organism tlu:ough -- -

the Crystal River Bay. -

The entrainment of small fish and other organisms through the plant's cooling system.

I --

The impact of the heated water discharges on the j ecological balance of the bay.

i i

t

! AEC agreed to request the Florida Power Company to submit l

} to the Commission within a 30 day period,.if possible, a

,' detailed and comprehensive study outline to investigate - r.

the three major potential impact areas. The company would l 3

2 also be asked to prepare a detailed engineering design l feasibility study of alternative means of cooling the plant j l complex to be prepared concurrently with the comprehensive '

study. - -'

I l

1 i

i 988

~

. .. - . ~ - - ~--.- -- -

)

L

. . ./. R

~

'4 V .

1

~ . , .

s :.- y e p : w a:

. .- , a . . , s.. n.- i T. ~ . .

. . , * ~

r', -

2 --

AEd agree $1 to consult with Interior on the material to be submitted by the utility and to schedule a meeting with the utility in order to make suggestions for improving and strengthening the utility's study outline. A meeting date no later than April 30, 1973 was considered imperative.

/

All agreed that it was extremely important to get a fix on an estimate of impact on the estuary and to get the utility thinking.about cooling system alternatives at a date sufficiently early to permit modification to the plant -

during the on-going construction period.

] t()

Wil iam J. Dircks Staff Member i