Summarizes 730201 Meeting W/Nrc & Doi in Washington DC Re Potentially Serious Environ Problems at facility.730430 Meeting W/Util Planned to Improve & Strengthen Util Study Outline
ML19308D972
Person / Time
Site: Crystal River 
Issue date: 02/05/1973
From: Dircks W
COUNCIL ON ENVIRONMENTAL QUALITY
To: Gardner G, Muller D
INTERIOR, DEPT. OF, US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8003200714
Download: ML19308D972 (3)


Text

_-

~.

AEC DNIBUTION FOR PART 50 DOCxzT Mr%IAL (TEMPORARY FORM)

CONTROL NC; 988 ENVIRO FROM:

DATE OF DOC:

DATE REC'D LTR MEMO RPr CrniER

. Executive Office of'the President Council on Environmental Quality 2-5-73 2-8-73 x

W f'flMA h Birks 20006 6

'Io:

ORIG CC crafER Ssur AEC Ea X

D. R. Muller SENT LOCAL PDR X

i CIASS:

QMPROP I5F0 INPUT NO CYS REC'D

, DOCKET EO 1

50-302 -

DESCRIPIION:

ENCLOSURES:

Memo summarizing the major points discussed at the meeting w/CEQ on 2-1-73......

DIST:

Per.D. Muller /Harless PLANT NAMES: C,rystal River Unit # 3 FOR ACTION /INFORMATION 2-9-73 toe BUTLER (L) s -SCHWENCER(L)

SCHEMEL(L)

KNIGBTON(E)

W/ Copies W/1 Co CLARK (L)

STOLZ(pies W/ Copies W/ Copies L)

ZIEMANN(L)

YOUNGBID0D(E)'

W/ Copies W/ Copies W/ Copies W/ Copies GOLLER(L)

VASSALID(L)'

CHITWOOD(FM)

REGAN(E)~

i j

W/ Copies W/ Copies W/-

ies W/ 4 Copies

~ KNIEL(L)

H. DENION

.DICKERE)

W/ Copies W/ Copies W/ Copies W/ Cq11es INTERHAL DISTRIBUTION

[xw FILE 3 TECH REVIEW VOLIMER

.e. HARLESS 6

E peux run uuwRIE DENTON SHAFER F&M OGC, ROOM P-506A SCHROEDER GRIMES F&M BROWN E

4 MUNTZING/ STAFF MACCARY GAMMILL EMEIEY 4.-G. WILLIAMS E CASE KNIGHT (2)

KASTNER NUSSBAUMER E. GOULBOURNE L GIAMBUSSO PAWLICKI BALLARD A

IND BOYD-L(BWR)

SHAO SPANGLER LIC ASST.

A EYOUNG-L(PWR)

KNUTH SERVICE L SALTZPAN SKOVHDLT-L STELIO ENVIRO MASON L

P. COLLIIE MOORE MULLER WILSON L

PLANS HOUSTON DICKER MAIGRET L FfCI551TALD REG OPR TEDESCO KNIGEON SMITH L

DUBE yFILE& REGION (2)

IDNG YOUNGBIDOD GEARIN L

) ORRIS LAINAS PROJ 1EADER DIGGS L

INFO STEELE BENAROYA TEES L

CTELES y

LE L

w REGAN EXTERNAL DISTRIBUTION

  • -l-IDCAL PDR, Crystal River, Fla 1-UfIE(ABEMATHY l-NSIC(BUCHANAN))
  • - (1)M-NATIONAL LAB'S PNWL 1-FDR-SAN /LA/N' 1-R. CARROLL-0C, GT-B227 1-GERALD LELIf l.ASLB-YORE /SAYRE WOODWARD [H.ST.

el-R. CATLIN, E-256-GT BROOKHAVEN 1-CONSULANr'S 1-AGMED(WALT 16-CYS ACRS HOLDING NEWMARK/BLUME/AGABIAN Em C 427i 1-ED...MUIm 8 0 0 3 2 0 0 7 /</

g

-:W u e

E'

UTIVE OFFICE oF THE PRESIDEF')

50-302 CuUNCll. ON ENVIRONMENTAL QUALITY

~

722 JACKSON PLACE. N.

W.

~

d 's

--WASHINGTON. D. C. 20006 H[-

1 e

February 5,1973 N8g hh MEMORANDUM FOR MR. GEORGE GARDNER 7l

. Department of the Interior MR. DANIEL MULLER U.S. Atomic Energy Commission

SUBJECT:

Crystal River Nuclear Plant This is a brief memorandum to summarize the major points discussed at the meeting-here at CEQ on Thursday, February 1, 1973 on the subject of the Crystal River Plant.

The representativesof the Department of the Interior outlined a number of potentially serious environmental problems that they felt could occur if the Crystal River Nuclear Unit #3 were permitted to operate as proposed by the ut:ility.

These problems centered principally around:

l l

The effect of the long cooling water intake canal on movement of aquatic organism tlu:ough the Crystal River Bay.

The entrainment of small fish and other organisms through the plant's cooling system.

I The impact of the heated water discharges on the j

ecological balance of the bay.

t AEC agreed to request the Florida Power Company to submit

}

to the Commission within a 30 day period,.if possible, a

detailed and comprehensive study outline to investigate

- r.

the three major potential impact areas.

The company would 3

also be asked to prepare a detailed engineering design 2

feasibility study of alternative means of cooling the plant j complex to be prepared concurrently with the comprehensive study.

988 i

~

-. ~ - -

~--.- -- -

)

.../. R

'4 V

~

L

s :.- y e p : w a:

~

i T. ~..

s..

n.-

, a..,

  • ~

r',

2 --

AEd agree $1 to consult with Interior on the material to be submitted by the utility and to schedule a meeting with the utility in order to make suggestions for improving and strengthening the utility's study outline.

A meeting date no later than April 30, 1973 was considered imperative.

/

All agreed that it was extremely important to get a fix on an estimate of impact on the estuary and to get the utility thinking.about cooling system alternatives at a date sufficiently early to permit modification to the plant during the on-going construction period.

]

t()

Wil iam J.

Dircks Staff Member i

e I

i e

e 9.

e I

.~.__..

e

.,-9