Interim Significant Deficiency Rept Re Reactor Protection Sys Flexible Conduit Grounding in Pgcc Installations. Corrective Work Not Yet Completed.Final Rept Expected by 811030
ML20009A998
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 07/01/1981
From: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8107140628
Download: ML20009A998 (1)


Text

s J

4 ^ *

[ \.' [ g', L [ (* 7 [!^ l{ ' I ,' t .

, . i . ,,

P O. BOX 5000 e CLEVELAND. ohio 44101 e TELEPHONE (216) 622-9800 e ILLUMINATING BloG e $$ PUBLIC SoVARE Dalwyn R. Davidson 9 '# ' '

VICE PRESIDENT SYSTE M ENGINEERING AND CONSTRUCTION July 1, 1981 Mr. James G. Keppler Director, Region III Office of Inspection and Enforcement .

United States Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinoic 60137 RE: Perry Nuclear Power Plant Docket Nos. 50-440; 50-441, Significant Deficiency RPS Flexible Conduit Grounding in PGCC Installations (RDC 23(81))

Dear Mr. Keppler:

The interim report dated January 14, 1981 regarding the subject deficiency states that the final report is scheduled to be submitted to your office by July 1, 1981.

As discussed with Mr. L. McGregor of your office on June 30, 1981, the corrective action required to resolve this deficiency has not yet been completed. General Electric has issued to the Site two FDI's providing instructions for performing the work. Until this work has been completed, our final report cannot be issued. It is anticipated that all work will be completed and the final report submitted by October 30, 1981.

Very truly yours, Dalwy 1

R. Davidson O

e'

,p

, V

$[ _

Vice President f /

System Engineering and Construct!on gI. [f g (*O u

U.l

-l Ji:t' l lllgg h%/s.U DRD/llp i' f

(\ y# 7'Q  %. ,-I co,,

s

  1. s/ ,.

cc: Mr. J. Hughes - NRC Site vv/

h Mr. Victor Stello, Director Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Washington, D. C. 20555 U.S. Nuclear Regulatory Jommission bI M c/o Document Management Branch L Washington, D.C. 20555 0

  • %L e 1981}