ML20009A998
| ML20009A998 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 07/01/1981 |
| From: | Davidson D CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8107140628 | |
| Download: ML20009A998 (1) | |
Text
s J
[ \\.' [
g', 4 ^
L
[ (* 7 [!^
l{ ' I,' t i
P O. BOX 5000 e CLEVELAND. ohio 44101 e TELEPHONE (216) 622-9800 e ILLUMINATING BloG e
$$ PUBLIC SoVARE 9
Dalwyn R. Davidson VICE PRESIDENT SYSTE M ENGINEERING AND CONSTRUCTION July 1, 1981 Mr. James G. Keppler Director, Region III Office of Inspection and Enforcement United States Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinoic 60137 RE:
Perry Nuclear Power Plant Docket Nos. 50-440; 50-441, Significant Deficiency RPS Flexible Conduit Grounding in PGCC Installations (RDC 23(81))
Dear Mr. Keppler:
The interim report dated January 14, 1981 regarding the subject deficiency states that the final report is scheduled to be submitted to your office by July 1, 1981.
As discussed with Mr. L. McGregor of your office on June 30, 1981, the corrective action required to resolve this deficiency has not yet been completed. General Electric has issued to the Site two FDI's providing instructions for performing the work.
Until this work has been completed, our final report cannot be issued.
It is anticipated that all work will be completed and the final report submitted by October 30, 1981.
Very truly yours,
,p $[
1 O
Dalwy R. Davidson e', V gI. [f g (*O f
/
Vice President System Engineering and Construct!on U.l Ji:t' l lllgg u
-l y# 7'Q,-I h%
f
.U i'
DRD/llp
(\\
co,, /s s
- s h
cc:
Mr. J. Hughes - NRC Site
/,.
vv/
Mr. Victor Stello, Director Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Washington, D. C.
20555 U.S. Nuclear Regulatory Jommission bI M
L c/o Document Management Branch Washington, D.C.
20555 0
%L e 1981}