MONTHYEARIR 05000277/20240032024-11-0404 November 2024 Integrated Inspection Report 05000277/2024003 and 05000278/2024003 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification 05000277/LER-2024-003, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) IR 05000277/20240022024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24121A1832024-04-30030 April 2024 Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval 05000277/LER-2024-002, Uncoordinated DC Circuits Cause Unanalyzed Condition2024-04-0808 April 2024 Uncoordinated DC Circuits Cause Unanalyzed Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. IR 05000277/20244022024-03-12012 March 2024 Cybersecurity Inspection Report 05000277/2024402 and 05000278/2024402 (Cover Letter Only) ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners ML24060A1192024-02-29029 February 2024 Notification of Conduct of a Fire Protection Team Inspection 2024-09-06
[Table view] Category:License-Monthly Operating Report
MONTHYEARML0516804652005-06-0808 June 2005 May 2005 Monthly Operating Report for Peach Bottom Atomic Power Station Units 2 and 3 ML0513803492005-05-0303 May 2005 April 2005 Monthly Operating Report for Peach Bottom Atomic Power Station, Units 2 and 3 ML0512301702005-04-0404 April 2005 March 2005 Monthly Operating Report for Peach Bottom Atomic Power Station ML0507704492005-03-0404 March 2005 February 2005 Monthly Operating Report for Peach Bottom Atomic Power Station, Units 2 and 3 ML0505301982005-02-0404 February 2005 January 2005 Monthly Operating Report for Peach Bottom Atomic Power Station, Units 2 and 3 ML0502603182005-01-0404 January 2005 December 2004 Monthly Operating Report for Peach Bottom, Units 2 & 3 ML0500402422004-12-0202 December 2004 November 2004 Monthly Operating Report for Peach Bottom Atomic Power Station, Units 2 & 3 ML0432804132004-11-0202 November 2004 October 2004 Monthly Operating Report for Peach Bottom Atomic Power Station ML0432007662004-11-0202 November 2004 October 2004 Monthly Operating Report for Peach Bottom, Units 2 and 3 ML0429402652004-10-0101 October 2004 September 2004 Monthly Operating Report for Peach Bottom Units 1 and 2 ML0426601362004-09-0101 September 2004 August 2004 Monthly Operating Report for Peach Bottom Atomic Power Station, Units 2 and 3 ML0423004512004-08-0202 August 2004 July 2004 Monthly Operating Report for Peach Bottom, Units 2 and 3 ML0420302672004-07-0202 July 2004 June 2004 Monthly Operating Report for Peach Bottom Atomic Power Station, Units 2 and 3 ML0416901232004-06-0202 June 2004 May 2004 Monthly Operating Report for Peach Bottom Atomic Power Station, Units 2 and 3 ML0414100472004-05-0404 May 2004 April 2004 Monthly Operating Report for Peach Bottom Atomic Power Station, Units 2 and 3 ML0411108522004-04-0202 April 2004 March 2004 Monthly Operating Report for Peach Bottom, Units 2 & 3 ML0407805692004-03-0303 March 2004 February 2004 Monthly Operating Report for Peach Bottom Units 2 & 3 ML0402302692004-01-0707 January 2004 December 2003 Monthly Operating Report for Peach Bottom, Units 2 and 3 ML0335003092003-12-0505 December 2003 November 2003 Monthly Operating Report for Peach Bottom, Units 2 and 3 ML0332400612003-11-0505 November 2003 October 2003 Monthly Operating Report for Peach Bottom, Units 2 & 3 ML0329406262003-10-0202 October 2003 September 2003 Monthly Operating Report for Peach Bottom Units 2 & 3 ML0330304242003-10-0202 October 2003 September 2003 Monthly Operating Report for Peach Bottom, Units 2 and 3 ML0326710282003-09-0404 September 2003 August 2003 Monthly Operating Report for Peach Bottom, Units 2 and 3 ML0322600192003-08-0404 August 2003 July 2003 Monthly Operating Report for Peach Bottom, Units 2 & 3 ML0319804322003-07-0101 July 2003 June 2003 Monthly Operating Report for Peach Bottom Units 2 & 3 ML0316903882003-06-0303 June 2003 May 2003 Monthly Operating Report for Peach Bottom Units 2 and 3 ML0314005612003-05-0202 May 2003 April 2003 Monthly Operating Report for Peach Bottom Units 2 & 3 ML0310704512003-04-11011 April 2003 March 2003 Monthly Operating Report for Peach Bottom, Units 2 & 3 ML0307707552003-03-0404 March 2003 February 2003 Monthly Operating Report for Peach Bottom Units 2 & 3 ML0305507422003-02-0404 February 2003 January 2003 Monthly Operating Report for Peach Bottom Units 2 & 3 ML0302205092003-01-0303 January 2003 December 2002 Monthly Operating Report for Peach Bottom Units 2 & 3 ML0235204902002-12-0606 December 2002 November 2002 Monthly Operating Report for Peach Bottom Units 2 & 3 ML0232303522002-11-0404 November 2002 October 2002 Monthly Operating Report for Peach Bottom Units 2 & 3 ML0229604272002-10-0303 October 2002 September 2002 Monthly Operating Report for Peach Bottom Units 2 & 3 ML0226003522002-09-0404 September 2002 August 2002 Monthly Operating Report for Peach Bottom Units 2 & 3 ML0223304212002-08-0202 August 2002 July 2002 Monthly Operating Report for Peach Bottom, Units 2 and 3 ML0219804392002-07-0202 July 2002 June 2002 Monthly Operating Report for Peach Bottom Units 2 & 3 ML0217100532002-06-0404 June 2002 May 2002 Monthly Operating Report for Peach Bottom Units 2 & 3 ML0214203862002-05-0101 May 2002 April 2002 Monthly Operating Report for Peach Bottom, Units 2 & 3 ML0212303112002-04-0303 April 2002 March 2002 Monthly Operating Report for Peach Bottom, Units 2 and 3 ML0208405282002-03-0505 March 2002 February 2002 Monthly Operating Report for Peach Bottom, Units 2 & 3 ML0205903952002-02-0404 February 2002 January 2002 Monthly Operating Report for Peach Bottom, Units 2 & 3 ML0203505002002-01-0303 January 2002 December 2001 Monthly Operating Report for Peach Bottom, Units 2 & 3 2005-06-08
[Table view] |
Text
ExeIonM Exelon Nuclear Telephone 717.456.7014 Peach Bottom Atomic Power Station www.exeloncorp.com Nuclear 1848 Lay Road Delta, PA 17314-9032 April 4, 2005 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278
Subject:
Monthly Operating Report for March 2005 In accordance with Technical Specifications, Section 5.6.4, "Monthly Operating Reports,"
we are submitting this Monthly Operating Report for Peach Bottom Atomic Power Station, Units 2 and 3.
Should you have any questions concerning this letter, please contact Mr. Bradley Deihl at (717) 456-3623.
Respectfully, Joseph P. Grimes Plant Manager Peach Bottom Atomic Power Station JPG/PJD/NPA/Bg :cmg Enclosures cc:
S. Collins, Administrator, Region I, USNRC G. F. Wunder, Project Manager, USNRC U. S. NRC Senior Resident, PBAPS Cc r 0 ,5-/qor7 2A
I. INTRODUCTION Peach Bottom Atomic Power Station is composed of two Boiling Water Reactors and Steam Turbine/Generators located in Delta, Pennsylvania. Unit Two and Unit Three both have a Maximum Dependable Capacity of 1112 MWe Net. The Station is jointly owned by Exelon Nuclear and Public Service Electric and Gas. The Nuclear Steam Supply Systems are General Electric Company Boiling Water Reactors. The Architect/Engineer and Primary Construction Contractor was Bechtel Corporation. The Susquehanna River is the condenser cooling water source. The plant is subject to license numbers DPR-44 and DPR-56, issued October 25, 1973, and July 2, 1974, for Unit Two and Unit Three respectively, pursuant to Docket Numbers 50-277 and 50-278. The dates of initial Reactor criticality for Units Two and Three were September 16, 1973, and August 7, 1974, respectively. Commercial generation of power began on February 18, 1974, for Unit Two, and September 1, 1974, for Unit Three.
II.
SUMMARY
OF OPERATING EXPERIENCE A. Unit TWO Unit 2 began the month of March at 100.0% of maximum allowable power (3514 MWth).
At 11:15 on March 5h, Unit 2 commenced power reduction for planned turbine valve testing. Following completion of the tests the Unit returned to full power by 00:21 on March 6th.
Unit 2 ended the month of March at 100% of maximum allowable power (3514 MWth).
B. Unit THREE Unit 3 began the month of March at 100% of maximum allowable power (3514 MWth).
At 23:00 on March 23d, Unit 3 reduced load to 84.6% for a planned rod pattern adjustment. Following the rod pattern adjustment the Unit returned to full power by 02:05 on March 13 h.
At 23:06 on March 24th, Unit 3 commenced a load reduction to a minimum of 55.1%
(3/25/05 @ 20:02) for power suppression testing. Following power suppression testing the Unit returned to full power by 03:26 on March 30 .
At 23:00 on March 30'h, Unit 3 reduced load to 69% for a follow up rod pattern adjustment for the power suppression testing.
Unit 3 ended the month of March at 98.4% of maximum allowable power (3514 MWth).
o III. OPERATING DATA STATISTICS A. Peach Bottom Unit TWO Operating Data Report for March 2005 DOCKET NO.: 50-277 DATE: April 1, 2005 COMPLETED BY: Brad Deihl TELEPHONE: (717) 456-3623 OPERATING STATUS REPORTING PERIOD: March 2005 GROSS HOURS IN REPORTING PERIOD: 744 CURRENTLY AUTHORIZED POWER LEVEL (MWth): 3514
- 1. DESIGN ELECTRICAL RATING (MWe-Net): 1138
- 2. MAX. DEPENDABLE CAPACITY (MWe-Net): 1112 UNIT 2 OPERATING STATUS PARAMETER THIS MONTH YTD CUMULATIVE
- 3. NUMBER OF HOURS THE REACTOR WAS CRITICAL 744.0 2,108.9 200,021.3
- 4. HOURS GENERATOR ON-LINE 744.0 2,097.0 195,480.9
- 5. UNIT RESERVE SHUTDOWN HOURS 0 0 0
- 6. NET ELECTRICAL ENERGY GENERATED 856,765.6 2,358,216.4 194,395,818.8
III. OPERATING DATA STATISTICS B. Peach Bottom Unit THREE Operating Data Report for March 2005 DOCKET NO.: 50-278 DATE: April 1, 2005 COMPLETED BY: Brad Deihl TELEPHONE: (717) 456-3623 OPERATING STATUS REPORTING PERIOD: March 2005 GROSS HOURS IN REPORTING PERIOD: 744 CURRENTLY AUTHORIZED POWER LEVEL (MWth): 3514
- 1. DESIGN ELECTRICAL RATING (MWe-Net): 1138
- 2. MAX. DEPENDABLE CAPACITY (MWe-Net): 1112 UNIT 3 OPERATING STATUS PARAMETER THIS MONTH YTD CUMULATIVE
- 3. NUMBER OF HOURS THE REACTOR WAS CRITICAL 744.0 2,160.0 199,214.4
- 4. HOURS GENERATOR ON-LINE 744.0 2,160.0 195,269.0
- 5. UNIT RESERVE SHUTDOWN HOURS 0 0 0
- 6. NET ELECTRICAL ENERGY GENERATED 795,603.6 2,378,837.4 193,421,698.8
IV. OPERATING DATA STATISTICS A. Unit TWO Shutdowns for March 2005 Method of No. for Type Duration Reason Shutting Year Date (1) (Hours) (2) Down (3) Corrective Actions/Comments No Unit TWO shutdownsfor March 2005 B. Unit THREE Shutdowns for March 2005 Method of No. for Type Duration Reason Shutting Year (I) (Hours) (2) Down (3) Corrective Actions/Comments No Unit THREE shutdownsfor March 2005 Legend (1) Type: F - Forced S - Scheduled (2) Reason: A. - Equipment Failure (Explain)
B. - Maintenance or Test C. - Refueling D. - Regulatory Restriction E. - Operator Training/License Examination F. - Administrative G. - Operational Error (Explain)
H. - Other (Explain)
(3) Method of Shutting Down: 1. - Manual
- 2. - Manual Trip/Scram
- 3. - Automatic Trip/Scram
- 4. - Continuation
- 5. - Other (Explain)