February 2003 Monthly Operating Report for Peach Bottom Units 2 & 3
ML030770755
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/04/2003
From: Stathes G
Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML030770755 (13)


Text

Exekrns.

Exelon Nuclear Peach Bottom Atomic Power Station 1848 Lay Road Delta, PA 17314-9032 Telephone 717 456 7014 www exeloncorp corn Nuclear March 4, 2003 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen:

Enclosed is the monthly operating report for Peach Bottom Units 2 and 3 for the month of February 2003 forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, Revision 4.

Sincerely, Garey L. Stathes Director, Site Engineering Peach Bottom Atomic Power Station GLS/PRR/CSL:cmg CesL Enclosures cc:

H J. Miller, Administrator, Region I, USNRC A.C. McMurtray, USNRC, Senior Resident Inspector, PBAPS ccn 03-14026 3eQY

Peach Bottom Atomic Power Station Unit 2 February 1 through February 28, 2003 Narrative Summary of Operating Experiences Unit 2 began the month of February at 100% power (3505 MWt).

At 0648, on February 17th, Unit 2 decreased power to 37%, as a result of the trip of the 2B recirc pump MG set. Following troubleshooting and repairs, the Unit returned to 100% power by 1729 on February 20th.

At 0230 on February 2 1St, Unit 2 reduced power to 91% for a follow-up rod pattern adjustment. The Unit returned to 100% power by 1230 on February 21st.

At 2300 on February 2 1St, Unit 2 reduced power to 85% for a second follow-up rod pattern adjustment. The Unit returned to 100% power by 0556 on February 2 2nd.

Unit 2 ended the month of February at 100% power (3505 MWth).

Peach Bottom Atomic Power Station Unit 3 February 1 through February 28, 2003 Narrative Summary of Operating Experiences Unit 3 began the month of February at 100% power.

At 0734 on February 9th, Unit 3 reduced power by 5 MWe (roughly 15 MWth, 99.5% CTP) during swap over of the 3D Monicore to the backup computer. The Unit returned to 100% power by 1840 on February 9 th.

th At 2210 on February 14, Unit 3 reduced power to 75% for a planned rod pattern adjustment. The Unit returned to 100% power by 0529 on February 15th.

Unit 3 ended the month of February at 100% power.

Attachment to Monthly Operating Report for February 2003 Page 1 UNIT 2 REFUELING INFORMATION

1.

Name of facility:

Peach Bottom Unit 2

2.

Scheduled date for next refueling shutdown:

Reload 15 is scheduled for September 22, 2004.

3.

Scheduled date for restart following refueling:

Restart following refueling forecast for October 7, 2004.

4.

Will refueling or resumption of operation there after require a technical specification change or other license amendment?

Yes If answer is yes, what, in general, will these be?

a. Potential Cycle 16 Safety Limit MCPR Change.
5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

Nothing to report for this period.

6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

Nothing to report this period.

Docket No. 50-277 Attachment to Monthly Operating Report for February 2003 Page 2 UNIT 2 REFUELING INFORMATION (Continued)

7.

The number of fuel assemblies (a) in the core, (b) in the spent fuel storage pool and (c) dry storage.

(a) Core - 764 Fuel Assemblies (b) Fuel Pool - 2908 Fuel Assemblies, 58 Fuel Rods (c) Interim Spent Fuel Storage Installation - 680 fuel assemblies

8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

Based on projected dry cask storage schedules and reload batch sizes, a full core discharge will remain available throughout plant life.

Docket No. 50-278 Attachment to Monthly Operating Report for February 2003 Page 1 UNIT 3 REFUELING INFORMATION

1.

Name of facility:

Peach Bottom Unit 3

2.

Scheduled date for next refueling shutdown:

Reload 14 is scheduled for September 21, 2003.

3.

Scheduled date for restart following refueling Restart following refueling forecast for October 9, 2003.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes If answer is yes, what, in general, will these be?

a.) Potential Cycle 15 Safety Limit MCPR Change.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

a.) Submittal anticipated July 2003.

6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

(a) The 3R14 reload will consist of approximately 288 GE-14 bundles. This will be the second reload of GE-14 fuel.

7.

The number of fuel assemblies (a) in the core, (b) in the spent fuel storage pool and (c) dry storage.

(a) Core - 764 Fuel Assemblies (b) Fuel Pool - 2997 Fuel Assemblies, 6 Fuel Rods (c) Interim Spent Fuel Storage Installation - 340 fuel assemblies

8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

Attachment to Monthly Operating Report for February 2003 Page 2 UNIT 3 REFUELING INFORMATION (Continued)

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

Based on projected dry cask storage schedules and reload batch sizes, a full core discharge will remain available throughout plant life.

OPERATING DATA REPORT DOCKET NO.

50-277 DATE MARCH 4, 2003 COMPLETED BY EXELON C. S. LEWIS PLANT ENGINEERING ENGINEERING DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-3245 OPERATING STATUS

1. UNIT NAME:

PEACH BOTTOM UNIT 2

2. REPORTING PERIOD:

FEBRUARY, 2003

3. DESIGN ELECTRICAL RATING (NET MWE):

1143

4. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)..........................................................

1.182

5. MAXIMUM DEPENDABLE CAPACITY (NET MWE): --------....--------........................................

1.116 THIS MONTH YR-TO-DATE CUMULATIVE

6. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1,4160 182,681.5
7. REACTOR RESERVE SHUTDOWN HOURS 00 00 0.0 8 HOURS GENERATOR ON-LINE 6720 1,416.0 178,295.9
9. UNIT RESERVE SHUTDOWN HOURS 0.0 00 0.0
10. NET ELECTRICAL ENERGY GENERATED (MWH) 714,723 1,563,364 175,449,130

OPERATING DATA REPORT (CONTINUED)

DOCKET NO.

DATE 50-277 MARCH 4,2003 THIS MONTH

11. UNIT SERVICE FACTOR 100 0%
12. UNIT AVAILABILITY FACTOR 1000 %
13. UNIT CAPACITY FACTOR (USING MDC NET) 95.3%
14. UNIT CAPACITY FACTOR (USING DER NET) 93.1 %
15. UNIT FORCED OUTAGE RATE

.0%

16 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

(717) 456-4248

17. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

(717) 456-4248

18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS)'

FORECAST INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION YR-TO-DATE 1000%

100.0%

989%

966%

.0%

CUMULATIVE 71.0%

71.0%

64.8%

63.7 %

96%

ACHIEVED 09/16/73 02/18f74 07/05/74 PAGE 2 OF 2

UNIT SHUTDOWNS REPORT MONTH DOCKET NO. 50 -277 UNIT NAME PEACH BOTTOM UNIT 2 DATE MARCH 4, 2003 COMPLETED BY EXELON C. S. LEWIS PLANT ENGINEERING ENGINEERING DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-3245 FEBRUARY, 2003 METHOD OF CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN ACTION TO NO.

DATE (1)

(HOURS)

(2)

REACTOR (3)

PREVENT RECURRENCE 1.

TOTAL HOURS (1)

F-FORCED S - SCHEDULED (2)

(3)

REASON A - EQUIPMENT FAILURE (EXPLAIN)

B - MAINTENANCE OR TEST C - REFUELING D - REGULATORY RESTRICTION E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EXPLAIN)

METHOD 1 - MANUAL 2 - MANUAL SCRAM 3 - AUTOMATIC SCRAM 4 - OTHER (EXPLAIN)

OPERATING DATA REPORT DOCKET NO.

50-278 DATE MARCH 4, 2003 COMPLETED BY EXELON C. S. LEWIS PLANT ENGINEERING ENGINEERING DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-3245 OPERATING STATUS

1. UNIT NAME:

PEACH BOTTOM UNIT 3

2. REPORTING PERIOD"*

FEB.RUARY,_2003 2.RPRIG-RO-----------------------

FEBRUARY..

2003-

3. DESIGN ELECTRICAL RATING (NET MW E): -- - -- - - - --- - -- - -- - - - - - - -- -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -1119
4. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): ---------------------------------------------------------- 1159
5. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

1093 THIS MONTH YR-TO-DATE CUMULATIVE

6. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1,416.0 181,555.5
7. REACTOR RESERVE SHUTDOWN HOURS 00 00 00
8. HOURS GENERATOR ON-LINE 672.0 1,416.0 177,649.8
9. UNIT RESERVE SHUTDOWN HOURS 00 00 00
10. NET ELECTRICAL ENERGY GENERATED (MWH) 752,375 1,582,220 173,698,185

OPERATING DATA REPORT (CONTINUED)

DOCKET NO.

DATE 50-278 MARCH 4,2003 THIS MONTH UNIT SERVICE FACTOR 100 0%

UNIT AVAILABILITY FACTOR 1000%

UNIT CAPACITY FACTOR (USING MDC NET) 1024 %

UNIT CAPACITY FACTOR (USING DER NET) 100.1 %

UNIT FORCED OUTAGE RATE 0%

SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

(717) 456-4248 IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

(717) 456-4248 UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):

FORECAST INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION YR-TO-DATE 100.0%

100.0%

102 2%

99.9 %

0%

CUMULATIVE 71.9%

71.9%

666%

64.8 %

8.3 %

11.
12.
13.
14.
15.
16.
17.

18.

PAGE 2 OF 2 ACHIEVED 08/07174 09/01[74 12/23174 I

UNIT SHUTDOWNS REPORT MONTH DOCKET NO. 50- 278 UNIT NAME PEACH BOTTOM UNIT 3 DATE MARCH 4,2003 COMPLETED BY EXELON C. S. LEWIS PLANT ENGINEERING ENGINEERING DIVISION PEACH BOTTOM ATOMIC POWER STATION FEBRUARY, 2003 TELEPHONE (717) 456-3245 METHOD OF CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN ACTION TO NO.

DATE (1)

(HOURS)

(2)

REACTOR (3)

PREVENT RECURRENCE TOTAL HOURS (1)

F-FORCED S-SCHEDULED (2)

(3)

REASON A-EQUIPMENT FAILURE (EXPLAIN)

B - MAINTENANCE OR TEST C - REFUELING D - REGULATORY RESTRICTION E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EXPLAIN)

METHOD 1 - MANUAL 2 - MANUAL SCRAM 3 - AUTOMATIC SCRAM 4 - OTHER (EXPLAIN)