ML051230170
| ML051230170 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 04/04/2005 |
| From: | Grimes J Exelon Nuclear |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML051230170 (6) | |
Text
ExeIonM Exelon Nuclear Telephone 717.456.7014 Peach Bottom Atomic Power Station www.exeloncorp.com 1848 Lay Road Delta, PA 17314-9032 Nuclear April 4, 2005 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278
Subject:
Monthly Operating Report for March 2005 In accordance with Technical Specifications, Section 5.6.4, "Monthly Operating Reports,"
we are submitting this Monthly Operating Report for Peach Bottom Atomic Power Station, Units 2 and 3.
Should you have any questions concerning this letter, please contact Mr. Bradley Deihl at (717) 456-3623.
Respectfully, Joseph P. Grimes Plant Manager Peach Bottom Atomic Power Station JPG/PJD/NPA/Bg
- cmg Enclosures cc:
S. Collins, Administrator, Region I, USNRC G. F. Wunder, Project Manager, USNRC U. S. NRC Senior Resident, PBAPS Cc r 0,5-/qor7
2A
I. INTRODUCTION Peach Bottom Atomic Power Station is composed of two Boiling Water Reactors and Steam Turbine/Generators located in Delta, Pennsylvania. Unit Two and Unit Three both have a Maximum Dependable Capacity of 1112 MWe Net. The Station is jointly owned by Exelon Nuclear and Public Service Electric and Gas. The Nuclear Steam Supply Systems are General Electric Company Boiling Water Reactors. The Architect/Engineer and Primary Construction Contractor was Bechtel Corporation. The Susquehanna River is the condenser cooling water source. The plant is subject to license numbers DPR-44 and DPR-56, issued October 25, 1973, and July 2, 1974, for Unit Two and Unit Three respectively, pursuant to Docket Numbers 50-277 and 50-278. The dates of initial Reactor criticality for Units Two and Three were September 16, 1973, and August 7, 1974, respectively. Commercial generation of power began on February 18, 1974, for Unit Two, and September 1, 1974, for Unit Three.
II.
SUMMARY
OF OPERATING EXPERIENCE A. Unit TWO Unit 2 began the month of March at 100.0% of maximum allowable power (3514 MWth).
At 11:15 on March 5h, Unit 2 commenced power reduction for planned turbine valve testing. Following completion of the tests the Unit returned to full power by 00:21 on March 6th.
Unit 2 ended the month of March at 100% of maximum allowable power (3514 MWth).
B. Unit THREE Unit 3 began the month of March at 100% of maximum allowable power (3514 MWth).
At 23:00 on March 23d, Unit 3 reduced load to 84.6% for a planned rod pattern adjustment. Following the rod pattern adjustment the Unit returned to full power by 02:05 on March 13 h.
At 23:06 on March 24th, Unit 3 commenced a load reduction to a minimum of 55.1%
(3/25/05 @ 20:02) for power suppression testing. Following power suppression testing the Unit returned to full power by 03:26 on March 30.
At 23:00 on March 30'h, Unit 3 reduced load to 69% for a follow up rod pattern adjustment for the power suppression testing.
Unit 3 ended the month of March at 98.4% of maximum allowable power (3514 MWth).
o III. OPERATING DATA STATISTICS A. Peach Bottom Unit TWO Operating Data Report for March 2005 DOCKET NO.:
DATE:
COMPLETED BY:
TELEPHONE:
50-277 April 1, 2005 Brad Deihl (717) 456-3623 OPERATING STATUS REPORTING PERIOD:
GROSS HOURS IN REPORTING PERIOD:
CURRENTLY AUTHORIZED POWER LEVEL (MWth):
- 1.
DESIGN ELECTRICAL RATING (MWe-Net):
- 2.
MAX. DEPENDABLE CAPACITY (MWe-Net):
March 2005 744 3514 1138 1112 UNIT 2 OPERATING STATUS PARAMETER
- 3.
NUMBER OF HOURS THE REACTOR WAS CRITICAL
- 4.
HOURS GENERATOR ON-LINE
- 5.
UNIT RESERVE SHUTDOWN HOURS
- 6.
NET ELECTRICAL ENERGY GENERATED THIS MONTH 744.0 744.0 0
856,765.6 YTD 2,108.9 2,097.0 0
2,358,216.4 CUMULATIVE 200,021.3 195,480.9 0
194,395,818.8
III. OPERATING DATA STATISTICS B. Peach Bottom Unit THREE Operating Data Report for March 2005 DOCKET NO.:
DATE:
COMPLETED BY:
TELEPHONE:
50-278 April 1, 2005 Brad Deihl (717) 456-3623 OPERATING STATUS REPORTING PERIOD:
GROSS HOURS IN REPORTING PERIOD:
CURRENTLY AUTHORIZED POWER LEVEL (MWth):
- 1.
DESIGN ELECTRICAL RATING (MWe-Net):
- 2.
MAX. DEPENDABLE CAPACITY (MWe-Net):
March 2005 744 3514 1138 1112 UNIT 3 OPERATING STATUS PARAMETER
- 3.
NUMBER OF HOURS THE REACTOR WAS CRITICAL
- 4.
HOURS GENERATOR ON-LINE
- 5.
UNIT RESERVE SHUTDOWN HOURS
- 6.
NET ELECTRICAL ENERGY GENERATED THIS MONTH YTD 744.0 2,160.0 744.0 2,160.0 0
0 795,603.6 2,378,837.4 CUMULATIVE 199,214.4 195,269.0 0
193,421,698.8
IV. OPERATING DATA STATISTICS A. Unit TWO Shutdowns for March 2005 No. for Year Type Duration Reason Date (1)
(Hours)
(2)
Method of Shutting Down (3)
Corrective Actions/Comments No Unit TWO shutdowns for March 2005 B. Unit THREE Shutdowns for March 2005 No. for Year Type Duration (I)
(Hours)
Reason (2)
Method of Shutting Down (3)
Corrective Actions/Comments No Unit THREE shutdownsfor March 2005 Legend (1) Type:
F - Forced S - Scheduled (2) Reason:
A. - Equipment Failure (Explain)
B. - Maintenance or Test C. - Refueling D. - Regulatory Restriction E. - Operator Training/License Examination F. - Administrative G. - Operational Error (Explain)
H. - Other (Explain)
(3) Method of Shutting Down:
- 1. - Manual
- 2. - Manual Trip/Scram
- 3. - Automatic Trip/Scram
- 4. - Continuation
- 5. - Other (Explain)