Exekon.SM Exelon Nuclear Peach Bottom Atomic Power Station 1848 Lay Road Delta, PA 17314-9032 Telephone 717.456.7014 www.exeloncorp.com Nuclear October 1, 2004 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278
Subject:
Monthly Operating Report for September 2004 In accordance with Technical Specifications, Section 5.6.4, "Monthly Operating Reports,"
we are submitting this Monthly Operating Report for Peach Bottom Atomic Power Station, Units 2 and 3.
Should you have any questions concerning this letter, please contact Mr. Chester Lewis at (717) 456-3245.
Respectfully, Joseph P. Grimes Plant Manager Peach Bottom Atomic Power Station JPG/PJD/NPA/CSL:cmg C&L Enclosures cc:
S. Collins, Administrator, Region I, USNRC C. Smith, USNRC, Senior Resident Inspector, PBAPS G. F. Wunder, Project Manager, USNRC 1-':57
ddi o4-190CN
I I. INTRODUCTION Peach Bottom Atomic Power Station is composed of two Boiling Water Reactors and Steam Turbine/Generators located in Delta, Pennsylvania. Unit Two and Unit Three both have a Maximum Dependable Capacity of 1 112 MWe Net. The Station is jointly owned by Exelon Nuclear and Public Service Electric and Gas. The Nuclear Steam Supply Systems are General Electric Company Boiling Water Reactors. The Architect/Engineer and Primary Construction Contractor was Bechtel Corporation. The Susquehanna River is the condenser cooling water source. The plant is subject to license numbers DPR-44 and DPR-56, issued October 25, 1973, and July 2, 1974, for Unit Two and Unit Three respectively, pursuant to Docket Numbers 50-277 and 50-278. The dates of initial Reactor criticality for Units Two and Three were September 16, 1973, and August 7, 1974, respectively. Commercial generation of power began on February 18, 1974, for Unit Two, and September 1, 1974, for Unit Three.
II.
SUMMARY
OF OPERATING EXPERIENCE A. Unit TWO Unit 2 began the month of September at 100% of maximum allowable power (3496 MWth).
At 0802 on September 14th, Unit 2 began a planned power reduction in preparation for the 2R15 refueling outage.
At 1500 on September 14th, Unit 2's generator was taken off-line.
At 1517 on September 14th, the Unit was manually shut down.
Unit 2 ended the month of September at 0% power, in the 2R1 5 refueling outage.
B. UnitTHREE Unit 3 began the month of September at 100% of maximum allowable power (3514 MWth).
At 2306 on September 1 0th, Unit 3 reduced power to 49%, in a planned load reduction for a rod sequence exchange, scram time testing and control rod speed adjustment.
The Unit returned to full power by 1605 on September 1 I th.
At 2305 on September 12'h, Unit 3 reduced power to 88%, for planned follow-up rod pattern adjustment. The Unit returned to full power by 0201 on September 13th.
Unit 3 ended the month of September at 100% of maximum allowable power (3514 MWth).
I; III. OPERATING DATA STATISTICS A. Peach Bottom Unit TWO Operating Data Report for September 2004 DOCKET NO.:
DATE:
COMPLETED BY:
TELEPHONE:
50-277 October 1, 2004 Chip Lewis (717) 456-3245 OPERATING STATUS REPORTING PERIOD:
GROSS HOURS IN REPORTING PERIOD:
CURRENTLY AUTHORIZED POWER LEVEL (MWth):
I.
DESIGN ELECTRICAL RATING (MWe-Net):
- 2.
MAX. DEPENDABLE CAPACITY (MWe-Net):
September 2004 720 3496 1138 1112 UNIT 2 OPERATING STATUS PARAMETER
- 3.
NUMBER OF HOURS THE REACTOR WAS CRITICAL
- 4.
HOURS GENERATOR ON-LINE
- 5.
UNIT RESERVE SHUTDOWN HOURS
- 6.
NET ELECTRICAL ENERGY GENERATED TiHIS MONTH YTD 327.3 6,125.4 327.0 6,106.0 0
0 347,580.7 6,789,748.1 CUMULATIVE 195,891.9 191,419.9 0
189,941,286.2
t III. OPERATING DATA STATISTICS B. Peach Bottom Unit THREE Operating Data Report for September 2004 DOCKET NO.:
DATE:
COMPLETED BY:
TELEPHONE:
50-278 October 1, 2004 Chip Lewis (717) 456-3245 OPERATING STATUS REPORTING PERIOD:
GROSS HOURS IN REPORTING PERIOD:
CURRENTLY AUTHORIZED POWER LEVEL (MWth):
I.
DESIGN ELECTRICAL RATING (MWc-Net):
- 2.
MAX. DEPENDABLE CAPACITY (MWe-Net):
September 2004 720 3514 1138 1112 UNIT 3 OPERATING STATUS PARAMETER
- 3.
NUMBER OF HOURS THE REACTOR WAS CRITICAL
- 4.
HOURS GENERATOR ON-LINE S.
UNIT RESERVE SHUTDOWN HOURS
- 6.
NET ELECTRICAL ENERGY GENERATED THIS MONTH 720.0 720.0 0
810,894.7 YTD 6,575.0 6,575.0 0
7,462,725.1 CUMULATIVE 194,845A 190,900.0 0
188,516,490.2
I IV. OPERATING DATA STATISTICS A. Unit TWO Shutdowns for September 2004 No. for Year Type Date
()
Duration (Hours)
Reason (2)
Method of Shutting Down (3) 1 Corrective Actions/Comments PB2R15 9/14/04 S
392.7 C
Planned refueling outage.
Will continue into October.
B. Unit THREE Shutdowns for September 2004 No. for Year Type Date (1)
Duration (Hours)
Reason (2)
Method of Shutting Down (3)
Corrective Actions/Comments No Unit THREE shutdowns for September 2004 Legend (1) Type:
(2) Reason:
F - Forced' S - Scheduled A. - Equipment Failure (Explain)
B. - Maintenance or Test C. - Refueling D. - Regulatory Restriction E. - Operator Training/License Examination F. - Administrative G. - Operational Error (Explain)
H. - Other (Explain)
(3) Method of Shutting Down:
- 1. - Manual
- 2. - Manual Trip/Scram
- 3. - Automatic Trip/Scram
- 4. - Continuation
- 5. - Other (Explain)